Eix Transversal
Primary highway in Catalonia, Spain
From Wikipedia, the free encyclopedia
Eix Transversal (English: Transversal Arterial Road[1]; lit. Transversal Axis), labelled C-25, is a primary highway in Catalonia, Spain. It crosses the Catalan Transversal Range mountainous region, connecting the northern end of the Catalan Coastal Depression with the Catalan Central Depression.[2]
| Autovía C-25 | |
|---|---|
| Eix Transversal | |
![]() | |
| Route information | |
| Length | 141 km (88 mi) |
| Major junctions | |
| From | Cervera |
| To | Cassà de la Selva |
| Location | |
| Country | Spain |
| Highway system | |
|
| |
According to the current coding for highways managed by the Generalitat de Catalunya, the first number C-25 indicates that is mainly a west-eastbound highway, and the second number C-25 indicates that is the fifth southernmost. The road begins at the intersection with Autovía A-2, near Cervera (comarca of Segarra), and finishes at Cassà de la Selva (comarca of Gironès), with a total length of 141 km.
History
The last section of the C-25 to be constructed was finished in December 1997. The main aims of the construction of this highway were:
- to provide a high-speed alternative way for road traffic between Northeastern Catalonia (Girona, Figueres, La Jonquera...) and southern France with Western Catalonia (Lleida, Cervera...) and Aragón, avoiding the often congested Barcelona metropolitan region
- to provide a high-speed connection for Central Catalonia's main towns (Vic, Manresa, Ripoll, etc.), between them as well as with Northeastern and the Western Catalonia
- generally speaking, to create an "orbital route" in what in those days was mainly a radial network with its center in the city of Barcelona, i.e. a road network radiating out from Barcelona.
Despite these aims, the highway was built as a single-lane road and not as a freeway, and soon it was proved to become insufficient for the traffic supported.[3]
On 2007 the Generalitat de Catalunya approved the upgrading of the highway to a freeway, which started on 2008 and is expected to be completed on 2011.[4]