Integral (train)
German diesel-multiple-unit train type
From Wikipedia, the free encyclopedia
The Integral is a diesel multiple unit (DMU) train type operated by Regiobahn GmbH on commuter services in North Rhine-Westphalia. Between 1998 and 2020, they were operated by the Bayerische Oberlandbahn on regional services between Munich, Bayrischzell, Lenggries and Tegernsee. They were built by the now defunct Jenbacher Werke.[1]
December 2020 – present
| Integral | |
|---|---|
Integral set VT 104 at München Hauptbahnhof in November 2018 | |
| In service | November 1998 – July 2020 December 2020 – present |
| Manufacturer | Jenbacher Werke |
| Number built | 17 sets |
| Formation | 5 sections per trainset |
| Operators | Bayerische Oberlandbahn (-2020) Regiobahn GmbH (2020-) |
| Specifications | |
| Prime mover(s) | Diesel-hydraulic |
| Bogies | 6 single wheelsets |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Formation

Each Integral unit consists of five sections, formed as shown in table below.[2] The two "FGZ" sections are suspended between the end- and intermediate cars.[2]
| Car | Endwagen 2 end car 2 | Fahrgastzelle passenger section | Mittelwagen intermediate car | Fahrgastzelle passenger section | Endwagen 1 end car 1 |
|---|---|---|---|---|---|
| Designation | EW2 | FGZ | MW | FGZ | EW1 |
| Equipment | Diesel-hydraulic motor | Two unpowered wheelsets | Diesel-hydraulic motor | ||
| Wheelsets | 2 | none | 2 | none | 2 |
Technical specifications
The trains are powered by diesel-hydraulic motors.[2] One end car has all wheelsets powered, the other end car has only one powered wheelset. All six wheelsets use active radial steering.[2] The trains are able to run in multiple unit formation.[3]
History
The trains entered service in November 1998.[3] Following problems and malfunctions, the fleet was returned to its manufacturer in Jenbach, and was overhauled, which increased their reliability.[4]
One unit was used at the Test- and Validationcenter Wegberg-Wildenrath for testing of an anti-collision system by the Deutsches Zentrum für Luft- und Raumfahrt (DLR).[5]
The Integral trains were withdrawn by Bayerische Oberlandbahn after their last day of service on July 25, 2020, being replaced by LINT 54 units.[6]
After their withdrawal from service in Bavaria, Integral trains were transferred to the Regiobahn GmbH in North Rhine-Westphalia, where they entered service on VRR S-Bahn line S28 in December 2020.[7]
- Anti-collision device experimentally fitted to an Integral unit
- Regiobahn Integral on an S28 service to Wuppertal