Interstate 269

Highway in Mississippi and Tennessee From Wikipedia, the free encyclopedia

Interstate 269 (I-269) is a partial beltway around the city of Memphis, Tennessee, and its adjacent suburban areas in southwestern Tennessee and northern Mississippi, completed in October 2018.[1] I-269 was planned and built to serve as an outer bypass for the Memphis metropolitan area, funneling through traffic around the metro area while also functioning as a bypass of future I-69, which will run directly through the center of the metro area. I-269 currently connects to its parent route, I-69, at an interchange in Hernando, Mississippi, and will do so again in Millington, Tennessee, in the future.

Length45.19 mi (72.73 km)
Existed2015–present
HistoryOpened in 1998 as SR 385
NHSEntire route
Quick facts Route information, Length ...
Interstate 269 marker
Interstate 269
I-269 highlighted in red
Route information
Auxiliary route of I-69
Length45.19 mi (72.73 km)
Existed2015–present
HistoryOpened in 1998 as SR 385
NHSEntire route
Major junctions
South end I-55 / I-69 / MS 304 in Hernando, MS
Major intersections
North end I-40 / SR 385 in Arlington, TN
Location
CountryUnited States
StatesMississippi, Tennessee
CountiesMS: DeSoto, Marshall
TN: Fayette, Shelby
Highway system
MS 245MS US 278
SR 268TN SR 269
Close

Route description

I-269 begins at an interchange with I-69 near Hernando, Mississippi. The highway travels eastward across rural areas to the town of Byhalia, Mississippi, where it has an interchange with I-22/U.S. Route 78 (US 78). Here, the highway continues northeastward, slowly veering north towards the Tennessee state line. Entering Tennessee, I-269 has an interchange with US 72 and the southern segment of State Route 385 (SR 385) in Collierville. The route then proceeds north along former SR 385 to an interchange with I-40 and the northern segment of SR 385 in Arlington.

History

I-269 extension to Mississippi under construction

The Tennessee Department of Transportation's (TDOT) plans called for the two sections to be connected in phases.[2] Plans had the portion extending south from an incomplete interchange with SR 385 south to the Mississippi state line to completed in October 2015 to coincide with completion of the section in Mississippi from the Tennessee state line to Mississippi Highway 302 (MS 302).[3] On January 29, 2007, the Federal Highway Administration (FHWA) issued a record of decision giving final federal approval for I-269, paving the way for the two states to design and construct the remaining section between Hernando and Collierville.

The first section of what is now I-269, the Winfield Dunn Parkway, from I-40 to US 64 opened on September 4, 2007, signed as SR 385.[4] The segment between US 64 and to SR 193 (Macon Road) opened on June 15, 2009,[5] and the segment between SR 193 and SR 57 opened on November 22, 2013.[6] The last section of the Bill Morris Parkway, most of which remains signed as SR 385, was opened between US 72 and SR 57 on August 23, 2007.[7]

On October 18, 2007, the Mississippi Department of Transportation (MDOT) announced that a bond was successfully issued through the state's Highway Enhancements Through Local Partnerships (HELP) Program for $83 million (equivalent to $121 million in 2024[8]) to cover planning and right-of-way acquisition costs for Mississippi's portion of the route.[9] Mississippi began its part of I-269 construction on June 23, 2011,[10] with the 25-mile (40 km) section from the state line to I-55 totaling construction costs of $640 million (equivalent to $833 million in 2024[8]) as of 2014.[11]

On October 23, 2015, the first signed segment of I-269 opened between the eastern terminus of SR 385 in Collierville and MS 302.[12] On December 5, 2017, the second segment opened between MS 302 and MS 305, including the I-22 interchange.[13]

In 2018, TDOT redesignated a portion of SR 385 between Collierville and I-40 in Arlington as I-269.

The segment of I-269 from the I-55/I-69 interchange in Hernando to MS 305 in Lewisburg, Mississippi, was completed on October 26, 2018, completing the connection between I-40 in Tennessee and I-55 in Mississippi.[14][15][16]

The construction costs of the Tennessee portion of SR 385 from the 1980s until completion in 2013 was over $500 million (equivalent to $662 million in 2024[8]).[6] Both states' combined investments were over $1.2 billion (equivalent to $1.59 billion in 2024[8]) for the 64.3-mile (103.5 km) I-269 project, including construction and rights-of-way expense listed above.

On October 13, 2021, a new interchange at McIngvale Road opened to traffic following a ribbon-cutting ceremony. The $8.7-million project also included realigning a 1.5-mile (2.4 km) section of McIngvale Road between Byhalia Road and Green T Road and widening it to five lanes.[17]

Exit list

More information State, County ...
StateCountyLocationmikmExitDestinationsNotes
MississippiDeSotoHernando0.000.001A-B

I-69 south / MS 304 west Tunica, Casinos

I-55 / I-69 north Memphis, Southaven, Jackson
Southern terminus; exit 283A on I-55; signed as exits 1A (south) and 1B (north); southern end of MS 304 concurrency; cloverleaf interchange; freeway continues as I-69 south/MS 304 west
1.312.111McIngvale RoadOpened to traffic on October 13, 2021[17]
3.175.103Getwell Road
5.188.345Laughter Road
7.3211.787Craft Road
9.3715.089 MS 305 Olive Branch, Independence
13.4121.5813Red Banks Road
Byhalia15.5725.0616
I-22 east / US 78 Holly Springs, Tupelo, Birmingham, Olive Branch, Memphis
Signed as exits 16A (east) and 16B (west); western terminus of I-22; I-22/US 78 exit 12
Marshall17.8528.7318 MS 309 Byhalia
Cayce23.7938.2923 MS 302 Southaven, Olive Branch
MississippiTennessee state line
MS 304 ends
TennesseeShelbyFayette
county line
ColliervillePiperton line27.2443.841 US 72 (SR 86) Collierville, Corinth
28.5545.952
SR 385 west (Bill Morris Parkway) Memphis
Eastern terminus of SR 385
FayettePiperton29.5547.563 SR 57 Piperton, Collierville
FayetteShelby
county line
37.7560.7511 SR 193 Macon, Fisherville
ShelbyArlington41.7067.1115 US 64 (SR 15) Bartlett, Somerville
44.5671.7118Donelson Farms Parkway
45.1972.7319
I-40 / SR 385 north Memphis, Nashville
Signed as exits 19A (east) and 19B (west); exit 24A on I-40; freeway continues as SR 385 north
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Close

See also

References

Related Articles

Wikiwand AI