JR Freight Class EH800

Japanese electric locomotive type From Wikipedia, the free encyclopedia

The Class EH800 (EH800形) is a Bo′Bo′+Bo′Bo′ wheel arrangement multi-voltage AC two-unit electric locomotive type operated by Japan Freight Railway Company (JR Freight) in Japan hauling freight trains on the Kaikyō Line through the Seikan Tunnel separating mainland Honshu with the northern island of Hokkaido. A prototype locomotive was delivered in January 2013 for evaluation and testing, with full-production locomotives delivered from June 2014, entering service from July 2014.

Power typeElectric
Power typeElectric
BuilderToshiba
Build date2012–
Quick facts Class EH800, Type and origin ...
Class EH800
EH800-2 in service in July 2016
Type and origin
Power typeElectric
BuilderToshiba
Build date2012–
Specifications
Configuration:
  UICBo′Bo′+Bo′Bo′
Gauge1,067 mm (3 ft 6 in)
BogiesFD7[1]
Wheel diameter1,120 mm (44 in)[1]
Length25,000 mm (82 ft 0 in)[1]
Width2,808 mm (9 ft 3 in)[1]
Loco weight134.4 t[1]
Electric system/s20/25 kV AC, 50 Hz[1]
Loco brakeAir and electrical regenerative
Train brakesAir
Safety systemsATS-SF, ATC-L (DS-ATC)[1]
Performance figures
Maximum speed110 km/h (70 mph)[1]
Power output
  • 4 MW (5,400 hp) at 25 kV[1]
  • 3.04 MW (4,080 hp) at 20 kV[2]
Tractive effort:
  Starting411.6 kN (92,500 lbf)
  Continuous240.5 kN (54,100 lbf)[1]
Career
OperatorsJR Freight
Number in class20 (as of 1 March 2017)
DeliveredJanuary 2013
First runJuly 2014
Close

Background

In order to allow Hokkaido Shinkansen services to operate through the dual-gauge Seikan Tunnel (which commenced on 26 March 2016), the overhead line system voltage was raised from the narrow gauge standard of 20 kV AC to the standard shinkansen power supply of 25 kV AC. A fleet of approximately 20 new dual-voltage locomotives capable of operating under either 20 kV or 25 kV was therefore required to replace the Class ED79 and Class EH500 locomotives previously used to haul freight and overnight sleeping car services through the tunnel.[3] These locomotives are also compatible with the digital ATC and feature digital train wireless communications.[3] The total cost of manufacturing the fleet of locomotives together with construction of new maintenance depot facilities was approximately 19 billion yen.[4] This kind of electric locomotive is modelled on the EH500, which was also manufactured by Toshiba, and therefore has a similar appearance and structure.[5]:36

Design

The Bo′Bo′+Bo′Bo′ wheel arrangement locomotives are painted in an all-over red livery with a white bodyside line and silver wavy line.[6]

Operations

The locomotives operate between Higashi-Aomori Freight Terminal and Goryōkaku Freight Terminal via the Kaikyō Line and Seikan Tunnel.[4]

History

The first full-production locomotive, EH800-1, on delivery in June 2014

Design of the prototype locomotive, EH800-901, began in fiscal 2010,[4] and the completed locomotive was unveiled to the press at the Toshiba factory in Fuchū, Tokyo, on 27 November 2012.[7] It was delivered to JR Freight in Sendai in January 2013.[8] Following delivery, the prototype locomotive was tested within the confines of Higashi-Fukushima Station before being moved to Goryōkaku Depot in Hokkaido for testing in winter conditions.[9]

The first full-production locomotive was delivered in June 2014.[10] This entered revenue service on 16 July 2014.[11]

Major overhauls of this train are carried out by the Omiya Comprehensive Vehicle Centre, and traction duties in the DC line area are usually carried out by Class EF210[12] or Class EF65.[13]

Fleet list

EH800-1 in service in July 2014
EH800-11 in service in March 2016
EH800-19 being delivered in December 2016

As of 1 March 2017, 20 Class EH800 locomotives are in service.[14]

More information Number, Manufacturer ...
Number Manufacturer Date delivered Remarks
EH800-901 Toshiba January 2013 Prototype
EH800-1 Toshiba June 2014 Full-production locomotives
EH800-2 Toshiba July 2014
EH800-3 Toshiba August 2014
EH800-4 Toshiba September 2014
EH800-5 Toshiba October 2014
EH800-6 Toshiba December 2014
EH800-7 Toshiba February 2015[15]
EH800-8 Toshiba February 2015[16]
EH800-9 Toshiba April 2015[17]
EH800-10 Toshiba May 2015
EH800-11 Toshiba June 2015[18]
EH800-12 Toshiba July 2015[19]
EH800-13 Toshiba September 2015[20]
EH800-14 Toshiba November 2015[21]
EH800-15 Toshiba January 2016[22]
EH800-16 Toshiba February 2016[23]
EH800-17 Toshiba September 2016[24]
EH800-18 Toshiba October 2016[25]
EH800-19 Toshiba December 2016[26]
Close

Classification

The EH800 classification for this locomotive type is explained below. As with previous locomotive designs, the prototype is numbered EH800-901, with subsequent production locomotives numbered from EH800-1 onward.

  • E: Electric locomotive
  • H: Eight driving axles
  • 800: AC locomotive with AC motors

See also

  • Train on Train, a piggy-back concept for transporting freight through the Seikan Tunnel at higher speeds

References

Further reading

Related Articles

Wikiwand AI