Toei Ōedo Line

Subway line in Tokyo, Japan From Wikipedia, the free encyclopedia

The Toei Ōedo Line (都営地下鉄大江戸線, Toei Chikatetsu Ōedo-sen; "Greater Edo Line") is a rapid transit railway line of the municipal Toei Subway network in Tokyo, Japan. It commenced full operations on December 12, 2000; using the Japanese calendar this reads "12/12/12" as the year 2000 equals Heisei 12. The line is completely underground, making it the second-longest railway tunnel in Japan after the Seikan Tunnel.

Other nameE
Native name都営地下鉄大江戸線
Line number12
Quick facts Overview, Other name ...
Toei Ōedo Line
A Toei 12-600 series train on the Ōedo Line
Overview
Other nameE
Native name都営地下鉄大江戸線
Owner Toei Subway
Line number12
LocaleTokyo
Termini
Stations38
Color on map     Magenta
Service
TypeRapid transit
SystemTokyo subway
Operator(s)Toei Subway
Depot(s)Kiba
Rolling stockToei 12-000 and Toei 12-600 series
Daily ridership933,621 (2016)[1]
History
Opened10 December 1991; 34 years ago (1991-12-10)
Last extension2000
Technical
Line length40.7 km (25.3 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius100 m (330 ft)
ElectrificationOverhead line, 1,500 V DC
Operating speed70 km/h (43 mph)
SignallingCab signalling, Closed block
Train protection systemNew CS-ATC, ATO
Maximum incline5.0%
Route map


km
see bottom of diagram
E28
0.0
Tochomae
E01
0.8
Shinjuku-nishiguchi
E02
2.2
Higashi-shinjuku
E03
3.2
Wakamatsu-kawada
E04
3.8
Ushigome-yanagicho
E05
4.8
Ushigome-kagurazaka
E06
5.8
Iidabashi
East Japan Railway Company JC
N
Namboku Line (at Kōrakuen)
E07
6.8
Kasuga
E08
7.6
Hongo-sanchome
M
G
E09
8.7
Ueno-okachimachi
H
E10
9.5
Shin-okachimachi
Tsukuba Express
E11
10.5
Kuramae
A
E12
11.7
Ryogoku
East Japan Railway Company JB
E13
12.7
Morishita
E14
13.3
Kiyosumi-shirakawa
Z
Kiba depot
E15
14.5
Monzen-nakacho
T
Y
E16
15.9
Tsukishima
E17
16.7
Kachidoki
E18
18.2
Tsukijishijo
E19
19.1
Shiodome
U
East Japan Railway Company JYJK
Tokyo Monorail (at Hamamatsuchō)
E20
20.0
Daimon
I
E21
21.3
Akabanebashi
N
E22
22.1
Azabu-juban
H
E23
23.2
Roppongi
C
E24
24.5
Aoyama-itchōme
Z
G
E25
25.7
Kokuritsu-Kyōgijō
East Japan Railway Company JB
JYJSJA
E26
27.2
Yoyogi
OH
E27
27.8
Shinjuku
S
Shinjuku Line, thoroughfare to Keio New Line
M
JY
JCJA
E28
28.6
Tochōmae
E29
29.4
Nishi-shinjuku-gochōme
Mb
Marunouchi Line Branch Line
M
Marunouchi Line Main Line
E30
30.6
Nakano-sakaue
JB
E31
31.6
Higashi-nakano
T
E32
32.4
Nakai
E33
33.7
Ochiai-minami-nagasaki
E34
35.3
Shin-egota
E35
36.9
Nerima
E36
37.8
Toshimaen
E37
39.3
Nerima-kasugacho
E38
40.7
Hikarigaoka
Close

On maps and signboards, the line is shown in magenta. Stations carry the letter "E" followed by a two-digit number inside a more pinkish ruby circle.

In fiscal year 2023, the Ōedo Line had the highest daily ridership in the Toei network, serving an average of 836,179 passengers per day. Despite this, it was the only Toei subway line to operate at a loss, incurring a deficit of 3.2 billion yen.[2]

Overview

The Ōedo Line is the first Tokyo subway line to use linear motor propulsion (and the second in Japan after the Osaka Metro Nagahori Tsurumi-ryokuchi Line), which allows it to use smaller cars and smaller tunnels (a benefit similarly achieved by the Advanced Rapid Transit system manufactured by Bombardier). This technology, though, is incompatible with other railway and subway lines, which can only operate with vehicles utilizing conventional rotary motors, thus preventing Ōedo Line trains from operating through services onto them. Although vehicles with rotary motor propulsion can technically operate on the Ōedo Line, its smaller tunnels and loading gauge prevents such occurrences, hence making the Ōedo Line the first self-enclosed subway line in Tokyo in over 40 years, and the first and to date only such line operated by Toei, although there is a track connection to the Asakusa Line that can be used only by Class E5000 locomotives.

The line is deep (as low as 48 metres (157 ft) below ground at points) through central Tokyo, including three underground crossings of the Sumida River. Originally budgeted at ¥682.6 billion and 6 years, the construction ended up taking nearly 10 years and estimates of the final cost of construction range from the official ¥988.6 billion to over ¥1,400 billion, making it the most expensive subway line ever built at that point.[3] However, stages 1–3 of Singapore's Downtown MRT line, completed in 2017, are 2.84 times as expensive, at 33,669.5 compared to 11,571.8 US dollars per kilometer after adjusting for inflation and international price differences. Phase 1 of New York's Second Avenue Subway, also completed in 2017, is over 5.5 times costlier per kilometer at 2,308.3 compared to 416.3 price-adjusted US dollars per kilometer.[4]

Ridership projections originally estimated 1 million users daily, a figure scaled down to 820,000 before opening. At the end of 2006, the line was averaging 720,000 passengers/day.[5] However, its ridership has increased by about five percent each year since its opening, following new commercial and residential development around major stations such as Roppongi and Shiodome. According to the Tokyo Metropolitan Bureau of Transportation, as of June 2009 the Ōedo Line was the fourth most crowded subway line in Tokyo, at its peak running at 178%[a] capacity between Monzen-Nakachō and Tsukishima stations.[6]

There are plans to extend the Ōedo Line westward from its current western terminus at Hikarigaoka Station through to a new terminus in Ōizumigakuenchō, 1.5 km (0.93 mi) north of Ōizumi-gakuen Station (on the Seibu Ikebukuro Line) then later towards Higashi-Tokorozawa Station (on the Musashino Line). The first segment to Ōizumigakuenchō, which will include three new stations in Doshida, Oizumimachi, and Oizumigakuencho, is expected to open around 2040 at a cost of 160 billion yen.[7] Following the awarding of the 2020 Summer Olympics to Tokyo, there had been speculation regarding the addition of another 2.7 km (1.7 mi) to the proposed extension in order to extend the line to Niiza where the shooting range for the Olympics was to be located. A decision regarding this matter was expected in 2015.[8][needs update]

Services

The Ōedo Line runs in a loop around central Tokyo before branching out towards Nerima in the western suburbs, meaning the line is shaped like a figure 6 lying on its side. It is not a true loop line: trains from the western Hikarigaoka terminus run anticlockwise around the loop and terminate at the intermediate Tochōmae Station facing towards Hikarigaoka, and vice versa. The arrangement is very much like the London Underground Circle Line since 2009, but does not share any track segments with other lines.

The full 40.7 km (25.3 mi) trip from Tochōmae around the loop and onward to Hikarigaoka takes 81 minutes. Trains operate once every three to five minutes during rush hours, and once every six minutes during off-peak weekday hours, weekends and holidays.[9]

History

Planning

The Ōedo Line was first proposed in 1962 as a route running from Roka-kōen through Hōnan-chō, Shinjuku, Kasuga-chō, Umayabashi, Fukagawa, and Tsukishima, and onward to Azabu under the Urban Transportation Council Report No. 6 (都市交通審議会答申第6号).[10] However, Keio opposed the plan on the grounds that the proposed route would traverse a key Keio Bus operating area and that the introduction of a subway would have a substantial adverse effect on its bus business.[11]

In response, on March 27, 1964, the Urban Transportation Council accepted Keio’s proposal and revised Line 9’s route between Roka-kōen and Shinjuku to follow a quadruple-tracked Keio Line alignment via Sakurajōsui, Meidaimae, and Hatagaya.[11]

The line was once again proposed in 1968 as an incomplete loop line from Shinjuku around northern and eastern Tokyo to Azabu. This plan was amended in 1972 to complete the loop back to Shinjuku, extend it to Hikarigaoka and add a spur line to Mejiro from the northern side. The Tokyo Metropolitan Government undertook construction of the line, which was initially called Toei Line 12 (都営地下鉄12号線, Toei Chikatetsu Jūnigō-sen).[10]

Based on Report No.15, a license for the entire line, covering the section between present-day Hikarigaoka Station and Tochōmae Station and including both the radial and circular portions, was obtained in August 1974. Construction planning proceeded with the aim of opening the full line in 1985. At this stage, the line was planned to use 10-car trains with 20-meter-long standard-gauge (1,435 mm) cars, similar to those operated on the Shinjuku Line.[12]

However, as a result of the abrupt change in social conditions following the 1973 oil crisis and the deterioration of the Transportation Bureau’s financial situation, the construction plan was temporarily frozen from mid-1976.[10] As part of this process, an application submitted to the Ministry of Transport in December 1975 for approval to construct a large-capacity line using 20-meter cars in 10-car formations between Nerima and Hikarigaoka was never reviewed and was automatically cancelled following the suspension of the project.[12]

Subsequently, the decision to redevelop the former Grant Heights site in the Hikarigaoka district, including the construction of a large-scale housing complex, significantly increased the need for improved transportation infrastructure. In response, the Tokyo Metropolitan Government decided in December 1982 to proceed with the construction of Line 12.[13]

Construction and opening

On June 1, 1986, construction begins between Hikarigaoka and Nerima.[12]

The first segment from Hikarigaoka to Nerima began operations on 10 December 1991. The line was extended from Nerima to Shinjuku on 19 December 1997, and later from Shinjuku to Kokuritsu-Kyōgijō on 20 April 2000.

With this extension, Shintaro Ishihara, the governor of Tokyo, named the line "Toei Oedo Line", where Oedo literally means "Great Edo", a reference to Tokyo's former name. As was the case with earlier lines, the public was initially polled to select a name; however, Ishihara rejected the chosen name, Tokyo Loop Line (東京環状線, Tōkyō Kanjō-sen), on the grounds that it would not initially form a complete loop, and that calling it such would cause confusion with the Yamanote Line and the Osaka Loop Line.

The full line began operation on 12 December 2000. An additional station (Shiodome Station) was opened on 2 November 2002 to connect to the Yurikamome guideway transit line. Following the addition of Shiodome, the automated announcements in the trains were changed to advertise businesses and facilities near each station, a first in Tokyo (although this was already the practice on the municipal subways of Osaka and Nagoya).

From 18 January 2023, car 4 was designated by the railway operator as a women-only car during the morning peak hour services on the Oedo line to reduce sexual assaults onboard.[14]

Stations

List of Toei Ōedo Line stations

All stations are located in Tokyo.

More information No., Station ...
No. Station Japanese Distance (km) Transfers Location
Between
stations
From E-28
E28 Tochomae 都庁前 - 0.0 For Hikarigaoka and Roppongi Shinjuku
E01 Shinjuku-nishiguchi 新宿西口 0.8 0.8
E02 Higashi-shinjuku 東新宿 1.4 2.2 Fukutoshin Line (F-12)
E03 Wakamatsu-kawada 若松河田 1.0 3.2  
E04 Ushigome-yanagicho 牛込柳町 0.6 3.8  
E05 Ushigome-kagurazaka 牛込神楽坂 1.0 4.8  
E06 Iidabashi 飯田橋 1.0 5.8 Bunkyō
E07 Kasuga 春日 1.0 6.8
E08 Hongō-sanchōme 本郷三丁目 0.8 7.6 Marunouchi Line (M-21)
E09 Ueno-okachimachi 上野御徒町 1.1 8.7 Taitō
E10 Shin-okachimachi 新御徒町 0.8 9.5 Tsukuba Express (02)
E11 Kuramae 蔵前 1.0 10.5 Asakusa Line (A-17)
E12 Ryōgoku 両国 1.2 11.7 Chūō–Sōbu Line Sumida
E13 Morishita 森下 1.0 12.7 Shinjuku Line (S-11) Kōtō
E14 Kiyosumi-shirakawa 清澄白河 0.6 13.3 Hanzōmon Line (Z-11)
E15 Monzen-nakacho 門前仲町 1.2 14.5 Tōzai Line (T-12)
E16 Tsukishima 月島 1.4 15.9 Yūrakuchō Line (Y-21) Chūō
E17 Kachidoki 勝どき 0.8 16.7  
E18 Tsukijishijō 築地市場 1.5 18.2  
E19 Shiodome 汐留 0.9 19.1 Yurikamome (U-02) Minato
E20 Daimon 大門 0.9 20.0
E21 Akabanebashi 赤羽橋 1.3 21.3 Mita Line (Shibakoen: I-05)
E22 Azabu-juban 麻布十番 0.8 22.1 Namboku Line (N-04)
E23 Roppongi 六本木 1.1 23.2 Hibiya Line (H-04)
E24 Aoyama-itchōme 青山一丁目 1.3 24.5
E25 Kokuritsu-Kyōgijō 国立競技場 1.2 25.7 Chūō–Sōbu Line (Sendagaya) Shinjuku
E26 Yoyogi 代々木 1.5 27.2 Shibuya
E27 Shinjuku 新宿 0.6 27.8
E28 Tochomae 都庁前 0.8 28.6 For Iidabashi Shinjuku
E29 Nishi-shinjuku-gochome 西新宿五丁目 0.8 29.4  
E30 Nakano-sakaue 中野坂上 1.2 30.6 Marunouchi Line (M-06) Nakano
E31 Higashi-Nakano 東中野 1.0 31.6 Chūō–Sōbu Line
E32 Nakai 中井 0.8 32.4 Logo for the Seibu Shinjuku Line. Shinjuku Line Shinjuku
E33 Ochiai-minami-nagasaki 落合南長崎 1.3 33.7  
E34 Shin-egota 新江古田 1.6 35.3   Nakano
E35 Nerima 練馬 1.6 36.9 Nerima
E36 Toshimaen 豊島園 0.9 37.8 Logo for the Seibu Toshima Line. Toshima Line
E37 Nerima-kasugachō 練馬春日町 1.5 39.3  
E38 Hikarigaoka 光が丘 1.4 40.7  
Close

    Rolling stock

    An Oedo Line 12-000 series trainset

    Oedo Line trains are housed and maintained at the Kiba depot, located underneath Kiba Park to the southeast of Kiyosumi-Shirakawa Station. Prior to the completion of the Oedo Line loop in 2000, servicing was performed at a depot near Hikarigaoka Station.

    Major overhaul work for Oedo Line trains is performed at the Magome depot, located south of Nishi-Magome Station on the Toei Asakusa Line. Oedo Line trains access this facility using a connecting tunnel to the Asakusa Line near Shiodome Station. Because of differences in infrastructure and technology used preventing trains on either line from accessing the other, a special Toei Class E5000 locomotive powers these ferry runs during overnight hours when the subway is closed.

    Noise complaints

    The Ōedo line is one of the noisiest train lines in the world, with decibel levels reaching 90 decibels frequently along the line.[15] However, during the COVID-19 pandemic, noise levels have reached to over 105 decibels. The train line's President states that infection is a more significant concern [than hearing damage], and therefore train's windows are kept open to increase ventilation, which caused a number of complaints. As of April 2023, windows continue to be kept open to reduce the risks of Covid-19 transmission.[16] The cause of the Ōedo line's high noise levels lies in construction constraints such as preexisting infrastructure and the need to build deep tunnels, resulting in low-radius curves and small tunnels.[17]

    Notes

    a. ^ Crowding levels defined by the Ministry of Land, Infrastructure, Transport and Tourism:[18][19]

    100% — Commuters have enough personal space and are able to take a seat or stand while holding onto the straps or hand rails.
    150% — Commuters have enough personal space to read a newspaper.
    180% — Commuters must fold newspapers to read.
    200% — Commuters are pressed against each other in each compartment but can still read small magazines.
    250% — Commuters are pressed against each other, unable to move.

    See also

    References

    Related Articles

    Wikiwand AI