Talent Park station
Shenzhen Metro Line 13 station
From Wikipedia, the free encyclopedia
Talent Park station (simplified Chinese: 人才公园; traditional Chinese: 人才公園; pinyin: Réncái Gōngyuán Zhàn; Jyutping: Jan4 Coi4 Gung1 Jyun4 Zaam6) is a station on Line 13 of Shenzhen Metro. It opened on 28 December 2024, and is located in Nanshan District next to Shenzhen Talent Park.[1]
Platform | |||||||||||
| Chinese name | |||||||||||
| Simplified Chinese | 人才公园 | ||||||||||
| Traditional Chinese | 人才公園 | ||||||||||
| |||||||||||
| General information | |||||||||||
| Location | Intersection of Keyuan Road (科苑南路) and Cuangye Road (创业路) Nanshan District, Shenzhen, Guangdong China | ||||||||||
| Coordinates | 22.5149°N 113.9383°E | ||||||||||
| Operated by | MTR China Railway Electrification Rail Transit (Shenzhen) Co., Ltd (MTR Rail Transit (Shenzhen) Co., Ltd. and China Railway Electrification Bureau Group Co., Ltd.) | ||||||||||
| Line | Line 13 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | 28 December 2024 | ||||||||||
| Previous names | Dengliang East (登良东) | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
There is an entrance and exit access track to and from the underground Neihu Depot in front of the north end of the station.[2]
Station layout
| G | - | Exits A, B, C, D |
| B1F Concourse |
Lobby | Ticket Machines, Customer Service, Station Control Room |
| B2F | Mezzanine | Depot access tracks, Station Equipment |
| B3F Platforms |
Platform 1 | |
| Island platform, doors will open on the left | ||
| Platform 2 | 13 towards Shangwu (Houhai) | |
Gallery
- Platform
- Concourse
- Platform calligraphy
Entrances/exits
The station has 4 points of entry/exit, with Exit B being accessible via elevator.
- A: Keyuan Avenue (E)
- B1: Cuangye Road (N), Keyuan Road South (W)

- C: Cuangye Road (W)
- D: Nanshan Center Road (E)
- Entrance B1
- Entrance D
Construction timeline
- On 26 July 2017, Shenzhen Metro Group Co., Ltd. issued the "Environmental Impact Report of Shenzhen Urban Rail Transit Line 13 Project", which includes this station, and the project is named Dengliang East Station.[3]
- On 5 August 2019, the first acceptance of the crown beam and support beam of the station was successfully passed.[1]
- On 27 September 2019, the concrete pouring of the first floor slab in the open-cut section between this station and Shenzhen Bay Checkpoint Station was successfully completed.[4]
- On 16 November 2020, the left line tunnel between this station and Shenzhen Bay Port Station was successfully broken through, which is the third group of double-line sections of the whole line.[5]
- On 27 January 2021, the acceptance of the foundation pit enclosure and foundation treatment division of this station was successfully passed.[6]
- On 26 April 2021, the acceptance of the main structure division and the acceptance of the underground waterproof division of the station were successfully passed.[6]
- On 29 April 2021, the station carried out the intermediate acceptance of the transfer of sub-units of the 16-30 axis/A-D axis including the plug-in part on the station hall floor, and the quality of the sub-divisions (sub-divisions) included in the acceptance scope was accepted.[6]
- On 12 July 2021, the intermediate acceptance of the transfer of the civil engineering sub-unit project at the platform layer of this station was successfully passed.[6]
- On 22 April 2022, the Shenzhen Municipal Bureau of Planning and Natural Resources issued the Announcement on the Approval of the Plan for the Station Names of Relevant Lines of the Fourth Phase of Shenzhen Metro, and the station was renamed from "Kexing Station" to the official station name, "Talent Park Station".[7]
- On 2 November 2022, the main structure of entrance and exit D of this station were successfully topped out.[2]