Alaska Electric Light & Power, also known as AEL&P, is the power utility for Juneau, the capital city of Alaska. AEL&P gets their electricity primarily through the Snettisham hydroelectric power plant, located in an uninhabited region 30 miles (48 km) southeast of downtown Juneau, accessible only by boat and aircraft.

Founded1893; 133 years ago (1893) in Juneau, Alaska, United States
FounderWillis Thorpe
Headquarters5601 Tonsgard Court,
Juneau, Alaska
,
United States
Quick facts Industry, Founded ...
Alaska Electric Light & Power
IndustryEnergy, Public Utility
Founded1893; 133 years ago (1893) in Juneau, Alaska, United States
FounderWillis Thorpe
Headquarters5601 Tonsgard Court,
Juneau, Alaska
,
United States
ProductsElectricity
Number of employees
78
ParentAvista Corporation
Websiteaelp.com
Close

Founded in 1893 by Willis Thorpe,[1] AEL&P is one of the only privately held utilities in the state.[2] The company is Alaska’s oldest electrical utility and its oldest continuously operating corporation.[3] It originally ran on local hydroelectric dams run by the mining-focused Treadwell Company. These first dams were constructed on Salmon Creek and Sheep Creek. The current plant at Snettisham was completed in 1973.[4]

On July 1, 2014, Avista Corp., based out of Washington, bought out AEL&P's parent Alaska Energy and Resources Company.

AEL&P has a total hydroelectric capacity of 102 megawatts.[5] The Snettisham Plant provides about two-thirds of Juneau’s electricity and has a generating capacity of 78.2 megawatts.[5]

2008 avalanches and emergency power

In April 2008, a series of massive avalanches outside Juneau heavily damaged the electrical lines providing Juneau with power, knocking the hydroelectric system offline and forcing the utility to switch to a much more expensive diesel system. Diesel generators replaced the hydroelectric power to the municipality in the weeks that followed, leading to temporarily higher utility costs for AEL&P customers until the power lines were repaired.