Chicago Pile-5

Thermal-neutron research reactor at Argonne National Laboratory (1954–1979) From Wikipedia, the free encyclopedia

Chicago Pile-5 (CP-5) was the last of the line of Chicago Pile research reactors which started with CP-1 in 1942. The first reactor built on the Argonne National Laboratory campus in DuPage county, it operated from 1954-1979.[1]

Operating institution
Argonne National Laboratory
LocationArgonne National Laboratory, Chicago, Illinois
Coordinates41.705°N 87.984°W / 41.705; -87.984
TypeHeavy water
Quick facts Operating institution, Location ...
Chicago Pile-5
Pile-5 seen in 2009
Operating institution
Argonne National Laboratory
LocationArgonne National Laboratory, Chicago, Illinois
Coordinates41.705°N 87.984°W / 41.705; -87.984
TypeHeavy water
Construction and upkeep
First criticality1954
Shutdown date1979
Close

CP-5 was a thermal-neutron reactor using enriched uranium as fuel and heavy water as coolant and as a neutron moderator. It produced neutrons for use in research.[2] The reactor had an output rating of 5 megawatts.[3]

Cleanup and decommissioning of the site of CP-5 was started in 1991 completed in 2000. The cleanup process included removal of all contaminated equipment and spent fuel, decontamination of the reactor vessel and associated plumbing, and removal of the spent fuel pool, reactor internals and the hot cell liner. The accessible areas of the structure have been certified as having radiation levels equivalent to background radiation.[4]

See also

References

Related Articles

Wikiwand AI