Cicalengka railway station
Railway station in Indonesia
From Wikipedia, the free encyclopedia
Cicalengka Station (CCL) is a class I railway station in Cicalengka, Bandung Regency, West Java, Indonesia.
Indonesia
Cicalengka Station building in 2022 | |||||
| General information | |||||
| Location | Jalan Stasiun Cicalengka No. 1, Panenjoan, Cicalengka, Bandung Regency, West Java Indonesia | ||||
| Coordinates | 6.9814°S 107.8330°E | ||||
| Elevation | +669 m (2,195 ft) | ||||
| Owner | Kereta Api Indonesia | ||||
| Operator | Kereta Api Indonesia | ||||
| Lines |
| ||||
| Platforms | 1 side platform 2 island platforms | ||||
| Tracks | 3 | ||||
| Construction | |||||
Structure type | Ground | ||||
| Parking | |||||
| Accessible | |||||
| Other information | |||||
| Station code | CCL • 1605[1] | ||||
| Classification | Class I[1] | ||||
| History | |||||
| Opened | 10 September 1884[2] | ||||
| Former names | Tjitjalengka Station | ||||
| |||||
History
Cicalengka Station was opened on 10 September 1884, along with the completion of the fifth fase of the Priangan railway line construction. After that, the state railway company Staatsspoorwegen began to extend the line towards Garut in the east.
In the 1930s, the Dutch colonial government planned to build a branch line from Cicalengka to Majalaya Station to form a loop line orbiting the Priangan region. Construction had started, but due to a monetary crisis and Japanese occupation of the colony, the project had to be cancelled. Currently, only railbed in some spots are still remaining on the line.[3]
Building and layout
The station has three railway lines with line 2 being a straight line and three platforms. The line 1 and 3 is reserved for Greater Bandung Commuter Line, while line 2 is reserved for Garut Commuter Line. The station also has a turntable.
| G | Main building | |||
| P
Platform level |
Side platform | |||
| Line 1 | ← | Turning tracks | → | |
| ↔ (Haurpugur) | ||||
| ← (Haurpugur) | ||||
| Island platform | ||||
| Line 2 | ← | Straight tracks | → | |
| ← (Haurpugur) | (Nagreg) → | |||
| Island platform | ||||
| Line 3 | ← | Turning tracks | → | |
| ↔ (Haurpugur) | ||||
| ← (Haurpugur) | ||||
| Island platform (under construction) | ||||
Services
- Commuter trains[4]
Greater Bandung Commuter Line to Padalarang and Purwakarta
Garut Commuter Line to Garut, Padalarang, and Purwakarta
Supporting transportation
Incidents
- On 19 August 2013, the window glass of the waiting room, as well as train dispacther and station master rooms were broken by a mass protest from passengers whom didn't got the Greater Bandung local train ticket due to its sellings were limited. As the result, trains were 30 minutes late from its schedule. At 05:15, the police examine 5 witnesses of the destruction.[8]
- On 5 January 2024, a fatal collision between the Greater Bandung Commuter Line (numbered 350) and Turangga train (numbered PLB 65A) occurred on the plot between Haurpugur and Cicalengka stations.[9] Train traffic in the Bandung–Kroya corridor of the southern Java rail line was distracted.[10]