D49 motorway (Czech: Dálnice D49), formerly Expressway R49 (Czech: Rychlostní silnice R49) is an motorway under construction in the Czech Republic. When completed, it will connect D1 highway to the Slovakia's D1 highway via the R6 expressway. It is supposed to replace the planned route of the D1 highway to Slovakia, which original direction to Púchov (Slovakia) was diverted and now leads to Ostrava.

Length17.4 km (10.8 mi)
Planned: 35 km (22 mi)
From D1 / D55 in Hulín
To I/49 in Vizovice
Quick facts Route information, Length ...
D49 Motorway shield}}
D49 Motorway
Dálnice D49
Route information
Length17.4 km (10.8 mi)
Planned: 35 km (22 mi)
Major junctions
From D1 / D55 in Hulín
To I/49 in Vizovice
Location
CountryCzech Republic
RegionsZlín
Major citiesZlín
Highway system
D48 D52
Close

History

Construction began in 2008, but was suspended in 2010 at first due to a lack of funding, but ultimately due to objections and lawsuits from environmental activists. The section form Hulín to Fryšták opened in 06/2026; other sections would follow later.

Construction of the first section resumed at the end of 2021. In 2024, a 9.8 km long section between Hulín and Holešov was opened.[1]

Future plans

Further sections, between Fryšták and Vizovice (namely 4902 and 4903) are planned for 2032, 2033, 2034 and 2036.[2][3][4][5] An additional 24.0 kilometres (14.9 mi) of motorway will be built.

The planned section of the D49 motorway between Vizovice and the state border, which was previously prepared as a three-lane directionally undivided road, was reclassified as an I/49 road in autumn 2023[citation needed]. In the future, that section will be a modernisation of the existing road. Construction is planned after 2030[citation needed].

Route description

More information Country, Region ...
CountryRegionLocationkmmiExitNameDestinationsNotes
Czech RepublicZlin RegionZlin Region00.0Hulín D1 D55Kilometrage starting point
42.5Třebětice
95.6HolešovTemporary end of motorway (other sections in construction or preparation)
1811FryštákIn construction