Wikiwand AI

New Bongaigaon–Guwahati section

Railway Line in Assam, India From Wikipedia, the free encyclopedia

The New Bongaigaon–Guwahati section of the Barauni–Guwahati line connects New Bongaigaon and Guwahati in the Indian state of Assam.

StatusOperational
LocaleAssam
Termini
Quick facts Overview, Status ...
New Bongaigaon–Guwahati section (including Dudhnoi-Mendipathar branch line)
Rangiya Junction an important railway station on New Bongaigaon–Guwahati section
Overview
StatusOperational
OwnerIndian Railways
LocaleAssam
Termini
Stations24
Service
OperatorNortheast Frontier Railway
History
Opened1962
Technical
Line length157.8 km (98 mi)(via Rangiya) & 182.7 km (114 mi)(via Goalpara)
Track gauge5 ft 6 in (1,676 mm) broad gauge
ElectrificationYes
Operating speed110 km/h (68 mph)
Route map

km
km
0
Guwahati
Pandu
9
7
Kamakhya Junction
Jalukbari
8
Pandu (Pragjyotishpur)
10
20
Azara
Saraighat Bridge on
Brahmaputra River
Amingaon
15
31
Mirza
Agthori
13
38
Kukurmara
Changsari
21
44
Chhaygaon
Baihata
31
56
Bamunigaon
Putimari
36
63
Boko
Kendukona
37
71
Singra
Left arrow
81
Dhupdhara
Rangiya
47
90
Rangjuli
Ghograpar
55
100
Amjonga
Pagladiya River
Nalbari
64
110
Dudhnoi
Kaithalkuchi
74
120
Nolbari
Tihu
81
129
Mendipathar
Nizsariha
86
122
Krishnai
Pathsala
91
131
Goalpara Town
Sarupeta
101
Guagachha
107
139
Pancharatna
Barpeta Road
112
149
Jogighopa
Beki River
Sorbhog
120
158
Kerkhabari
Patiladaha
129
164
Abhayapuri
Bijni
139
Right arrow
to Golakganj
(under construction)
Chaprakata
148
Bongaigaon
154
173
Majgaon
to Kamakhya
via Rangiya
to Kamakhya
via Goalpara Town
156
181
New Bongaigaon
km
km
Source: Indian Railways Time Table, Eastern Zone
Close

History

Early developments within Assam

The Assam Railway and Trading Company played a pioneering role in laying railway tracks in Assam. The Assam Railway and Trading Company Limited was incorporated in 1881. The first metre-gauge locomotive was put into service in Assam in 1882. The 64-kilometre (40 mi)-long line from Dibrugarh steamer ghat to Makum was opened to passenger traffic on 16 July 1883. The objective of opening an isolated railway in upper Assam was to link the tea gardens and coalfields to the steamer ghats. In the latter part of the 19th century, the Dibru–Sadiya railway was 149-kilometre (93 mi) long.The 1,000 mm (3 ft 3+3⁄8 in)-wide metre-gauge railway track earlier laid by Assam Bengal Railway from Chittagong to Lumding was extended to Tinsukia on the Dibru–Sadiya line in 1903. [1]

During British rule, rail links from Assam to the rest of India were through the eastern part of Bengal. In pre-independence days, there were basically two linkages. On the western side, a metre gauge line running via Radhikapur, Biral, Parbatipur, Tista, Gitaldaha and Golokganj connected Fakiragram in Assam with Katihar in Bihar.[2] On the eastern side, Assam was linked to Chittagong through the Akhaura–Kulaura–Chhatak line and Akhaura–Laksam–Chittagong line. Assam was linked to numerous other towns in the eastern part of Bengal through what is now the Mahisasan-Shahbajpur defunct transit point. The eastern line had been constructed in response to the demand of the Assam tea planters for a railway link to Chittagong port. Assam Bengal Railway started construction of a railway track on the eastern side of Bengal in 1891. A 150 kilometres (93 mi) track between Chittagong and Comilla was opened to traffic in 1895. The Comilla-Akhaura-Kulaura-Badarpur section was opened in 1896-1898 and finally extended to Lumding in 1903.[3][4][5] The Assam Bengal Railway constructed a branch line to Guwahati, connecting the city to the eastern line in 1900. Apart from the eastern and western lines, there was another link. In 1908, Eastern Bengal Railway extended the Kaunia–Dharlla line to Amingaon. During the 1900–1910 period, the Eastern Bengal Railway built the Golakganj-Amingaon branch line, thus connecting the western bank of the Brahmaputra to the western line. In 1904, The Mariani–Furkating line wa made & it was operated by Jorhat-Provincial Railway. In 1937, the British also planned Guwahati-Dhaka line in Meter Gauge which was slated to connect Guwahati with Dewanganj Upazila(Bangladesh) as Dewangaunge was already connected with Dhaka via Mymensingh by a 259-kilometre (161 mi) long Meter Gauge line. The 323-kilometre (201 mi) long Railway Guwahati-Dewanganj project was scrapped in 1943-1947 period owing to Second World War, Indian National Army defeating the British & partition of India.

With the partition of India in 1947 & Independence, all the three links were lost and for a short period the railway system in Assam was delinked from the rest of India. Indian Railways took up the Assam Link Project in 1948 to build a rail link between Fakiragram and Kishanganj. Assam was connected with India through the newly laid Kishanganj-Fakirgram Railway line. The 300.1 kilometres (186.5 mi) Meter Gauge line was completed in 1950 under General Karnail Singh & General Kodandera Subayya Thimayya (Gen. KS Thimayya) of Indian Army..[6] The New Bongaigaon–Guwahati section was converted to 5 ft 6 in (1,676 mm) broad gauge. Broad gauge reached Guwahati in 1984.[7][8]

Saraighat Bridge

The construction of the 1.49 km long Saraighat Bridge, the first rail-cum-road bridge across the Brahmaputra, was an event of great excitement. Jawaharlal Nehru, India’s first prime minister formally laid the foundation stone on 10 January 1960 and it was completed in 1962, connecting the two parts of the metre gauge railways in Assam.[9]

Siliguri-Jogihopa-Kamakhya line

The 265 km (165 mi) long 5 ft 6 in (1,676 mm) broad gauge Siliguri-Jogihopa line was constructed between 1963 and 1965.[10] The Naranarayan Setu was constructed in 1998, thereby paving the way for linking Jogihopa with Kamakhya.[11]

Dudhnoi-Mendipathar branch line

The line between Dudhnoi in Assam and Deepa in Meghalaya was proposed in the Rail budget of 1992–93. Later the alignment was changed to Dudhnoi-Mendipathar in 2007 due to opposition of local people. Due to late handover of land to railways in Assam and Meghalaya, the progress of work was slow up to 2013. Acquisition of land was completed by March 2013.

This rail line is the first foray of Indian Railways into Meghalaya. Mendipathar railway station was inaugurated by the Prime minister of India, Narendra Modi on 30 November 2014, through a video feed to the ceremony gathering at Mendipathar.[12]

Electrification

Electrification of the entire Katihar–Guwahati route is planned to be executed by 2014.[13] As on 2026, It is complete and fully operational.

View of the Brahmaputra valley from the Sarania Hills. The Saraighat Bridge can be seen near the horizon, the peaked Kamakhya Hills are to the left, and while Guwahati is on the left bank, on the right bank is North Guwahati. The Nehru stadium and the railway station are faintly visible, right bottom.

References

Related Articles

Timelines

Top Qs

Fact Checks