F3 (Istanbul funicular)

Rail line in Istanbul, Turkey From Wikipedia, the free encyclopedia

The F3, also known as the Vadistanbul Skyrail (Turkish: Vadistanbul Havaray) and officially referred to as the F3 Vadistanbul-Seyrantepe funicular line (Turkish: F3 Vadistanbul-Seyrantepe füniküler hattı), is a 750 m (2,460 ft) long funicular railway in Sarıyer, Istanbul.[2] The line is one of four funicular railways in Turkey, all of them in Istanbul, and is the only one that operates above ground. Because the F3 runs on top a concrete viaduct, it has been falsely commented as a Monorail even though it is technically a funicular railway on a standard gauge rail track. The route runs between Vadistanbul and Seyrantepe, where connection to the M2 line is available.[citation needed]

StatusOperating
OwnerVadistanbul AVM[1]
Termini
Quick facts Overview, Status ...
F3 Vadistanbul–Seyrantepe
Overview
StatusOperating
OwnerVadistanbul AVM[1]
LocaleIstanbul, Turkey
Termini
Stations2
Service
TypeFunicular
SystemIstanbul Metro
Route numberF3
OperatorİETT
History
Opened29 October 2017; 8 years ago (2017-10-29)
Technical
Line length0.75 km (0.47 mi)
Number of tracks1 (with a passing loop)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Operating speed28.8 km/h (17.9 mph)
Route map

Line F3
Vadistanbul
Seyrantepe Line M2
Close

The F3 was opened on 29 October 2017.[citation needed]

Overview

Seyrantepe entrance

The F3 route runs in southern Sarıyer, just west of Maslak. The large majority of the route is elevated with a concrete viaduct and consists of two stations. The northwest terminus of the F3, Vadistanbul station, is located within a glass Spheroid structure that connects to the 2nd floor of the Vadistanbul Shopping Center.[3] The southeast terminus, Seyrantepe station, is located underground on the northern side of the O-2 expressway. A tunnel underneath the expressway connects to the M2 station.[4] The route is mostly single track, except for a short 147 m (482 ft) long passing loop in the middle allowing both trains to pass one another. The total construction cost of the line was € 15 million.[4]

Line

More information No, Station ...
No Station District Transfer Type Notes
1 Seyrantepe Sarıyer Line M2 (Seyrantepe)
İETT Bus: 27SE, 41SM, 41ST, 62H, 65A
Viaduct Rams Park
2 Vadistanbul İETT Bus: 50D, 50H, 62H Vadistanbul Shopping Center