Grand Marais/Cook County Airport

Airport From Wikipedia, the free encyclopedia

Grand Marais/Cook County Airport (IATA: GRM, ICAO: KCKC, FAA LID: CKC) is a county-owned public-use airport located eight miles (13 km) northwest of the central business district of Grand Marais, a city in Cook County, Minnesota, United States.[1] This airport replaced the former Devil's Track Municipal Airport (FAA: GRM) located on the shore of Devil's Track Lake, one mile (1.6 km) south of the current airport.[2]

AirporttypePublic
ElevationAMSL1,799 ft (548 m)
Quick facts Summary, Airport type ...
Grand Marais/Cook County Airport
Summary
Airport typePublic
OwnerCook County
ServesGrand Marais, Minnesota
Elevation AMSL1,799 ft (548 m)
Coordinates47°50′18″N 090°22′59″W
Websitewww.boreal.org/airport
Map
CKC is located in Minnesota
CKC
CKC
Location of airport in Minnesota/United States
CKC is located in the United States
CKC
CKC
CKC (the United States)
Runways
Direction Length Surface
ft m
9/27 5,000 1,524 Asphalt
Statistics (2005)
Aircraft operations3,200
Source: Federal Aviation Administration[1]
Close

Although most U.S. airports use the same three-letter location identifier for the FAA and IATA, Grand Marais/Cook County Airport is assigned CKC by the FAA and GRM by the IATA[3] (which assigned CKC to Cherkasy, Ukraine[4]).

Facilities and aircraft

Grand Marais/Cook County Airport covers an area of 220 acres (89 ha) at an elevation of 1,799 feet (548 m) above mean sea level. It has one runway designated 9/27 with a 4,199 ft × 75 ft (1,280 m × 23 m) asphalt surface.

For the 12-month period ending July 31, 2005, the airport had 3,200 general aviation aircraft operations, an average of 267 per month.[1]

In the summer of 2009, the airport received $95,000 for the FAA to conduct an environmental impact study on a proposed expansion to the airport. On May 26, 2009, airport manager Rodney Roy told a Cook County board meeting that the expansion—which would widen the existing runway and increase its length to 5,000 feet from the existing 4,200 feet—would allow firefighting planes to operate from the airport. Roy also said that the project would cost approximately $12 million and might be spread out over three years.[5]

Construction on the runway expansion started in 2015[6] and concluded in 2019 with the opening of the 5,000 foot runway and new facility buildings[7]

See also

References

Related Articles

Wikiwand AI