Wikiwand AI

Gulou Dajie station

Beijing Subway interchange station From Wikipedia, the free encyclopedia

Gulou Dajie Station[1] (simplified Chinese: 鼓楼大街站; traditional Chinese: 鼓樓大街站; pinyin: Gǔlóudàjiē Zhàn; lit. 'Gulou Street[2]') is a station on Line 2 and Line 8 of the Beijing Subway.[3] The connection to line 8 opened on December 30, 2012.[4]

Lines
Platforms4 (2 island platforms)
Quick facts General information, Location ...
Gulou Dajie

鼓楼大街
Beijing Subway
Line 2 platform

Line 8 platform
General information
LocationXicheng District / Dongcheng District border, Beijing
China
OperatorBeijing Mass Transit Railway Operation Corporation Limited
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure type
Underground
AccessibleYes
Other information
Station code217 (Line 2)
History
OpenedSeptember 20, 1984; 42 years ago (1984-09-20) (Line 2)
December 30, 2012; 13 years ago (2012-12-30)
(Line 8)
Services
Preceding station Beijing Subway Following station
Jishuitan
outer loop / anticlockwise
Line 2 Anding Men
inner loop / clockwise
Andeli Beijie
towards Zhuxinzhuang
Line 8 Shichahai
towards Yinghai
Location
Gulou Dajie is located in Beijing
Gulou Dajie
Gulou Dajie
Location within Beijing
Close

Station layout

Both the line 2 and 8 stations have underground island platforms.

Exits

There are 6 exits, lettered A1, A2, B, E, F, and G. Exit B is accessible.

References

Related Articles

Timelines

Top Qs

Fact Checks