Wikiwand AI

HNLMS Vlissingen

2022 Dutch mine countermeasures vessel From Wikipedia, the free encyclopedia

HNLMS Vlissingen (M840) is the second ship in the City / Vlissingen-class of mine countermeasures vessels, and first to be built for the Royal Netherlands Navy.

NameHNLMS Vlissingen
NamesakeCity of Vlissingen
BuilderKership, Lorient, France
Laid down14 June 2022[1][2]
Quick facts History, Netherlands ...
The ship under construction in Concarneau (France)
History
Netherlands
NameHNLMS Vlissingen
NamesakeCity of Vlissingen
BuilderKership, Lorient, France
Laid down14 June 2022[1][2]
IdentificationPennant number: M840
StatusUnder construction
General characteristics
Class & typeVlissingen-class mine countermeasures vessel
Displacement2,800 t (2,800 long tons) full load
Length82.6 m (271 ft 0 in)[3]
Beam17 m (55 ft 9 in)
Draught3.80 m (12 ft 6 in)
Speed15.3 knots (28.3 km/h; 17.6 mph)
Complement33–63[3]
Armament
Close

History

Vlissingen is the result of a joint procurement programme for the replacements of the Tripartite- / Alkmaar-class minehunters for the Belgian- and Dutch navies.[4]

She was the second ship in the class behind Oostende (M940) and the first for the Royal Netherlands Navy. She was laid down at Kership, Lorient, France on 14 June 2022, and was planned to be commissioned in 2025.[1][2]

Sea trials began on March 31 2025.[5] During this trial the ships performance was tested with an emphasis on its propulsion system and maneuverability.[6][7]

On 27 February 2026 Vlissingen arrived at the Nieuwe Haven Naval Base in Den Helder.[8] However, shortly before berthing smoke developed in an electrical cabinet of the ship, which was quickly put under control by the naval fire brigade.[9] However, in April Vlissingen was still moored at Nieuwe Haven as a result of the fire.[10]

See also

References

Related Articles

Timelines

Top Qs

Fact Checks