Isiolo–Moyale Road

Kenyan road From Wikipedia, the free encyclopedia

The Isiolo–Moyale Road is a road section of the A2 Road in Kenya, connecting the towns of Isiolo, Archers Post, Marsabit, and Moyale. The road is a component of the Lamu Port and Lamu-Southern Sudan-Ethiopia Transport Corridor (LAPSSET) Project. It connects Kenya to Ethiopia, its neighbor to the north.[1]

Length313 mi (504 km)
HistoryDesignated in 2008
Completion in 2017
SouthendIsiolo
Major intersectionsArchers Post
Marsabit
Quick facts Route information, Length ...
Isiolo–Moyale Road
Route information
Length313 mi (504 km)
HistoryDesignated in 2008
Completion in 2017
Major junctions
South endIsiolo
Major intersectionsArchers Post
Marsabit
North endMoyale
Location
CountryKenya
Highway system
Close
Map of Major Roads in Kenya

Location

The road starts at Isiolo, Isiolo County, approximately 273 kilometres (170 mi), north of Nairobi, the capital and largest city of Kenya.[2] From there, the road travels in a general northerly direction through Archers Post, Merille, Marsabit, Turbi, to end at Moyale, at the international border with Ethiopia.[3] The total distance traveled is approximately 504 kilometres (313 mi),[4]

Overview

This road is an important trade corridor between Kenya and Ethiopia. It links four Kenyan counties and for the residents of these communities, it is a vital trade and transportation link to Nairobi and Mombasa, the two largest cities in the country.[5]

The road is also a component of the Great North Trans African Highway, sometimes referred to as the Great North Road, that stretches from Cape Town, South Africa to Cairo, Egypt. This road has been identified as a priority project in the New Partnership for Africa's Development (NEPAD) short-term action plan.[6]

Upgrade and funding

Prior to the upgrade to tarmac, the section from Merille, through Marsabit, Turbi, up to Moyale, measuring approximately 363 kilometres (226 mi), was gravel surfaced.[1][6]

Using money borrowed from the African Development Bank and from the Exim Bank of China, the upgrade was divided into three equidistant phases, each measuring 121 kilometres (75 mi).[1][6]

China Wu Yi, was the main contractor at a contract price of KSh42 billion (US$420 million). The financing for his road project, is as illustrated in the table below.[7]

More information Rank, Name of Development Partner ...
Sources of Funds for Rehabilitation of Isiolo–Moyale Road
RankName of Development PartnerAmount in US DollarsPercentageNotes
1African Development BankLoan
2Government of KenyaEquity
3Exim Bank of ChinaLoan
Total420.00 million100.00