Wikiwand AI

Maa Danteswari Airport

Airport in Jagdalpur, Chhattisgarh India From Wikipedia, the free encyclopedia

Maa Danteswari Airport (IATA: JGB, ICAO: VEJR), also known as Jagdalpur Airport, is a domestic airport serving the city of Jagdalpur in the state of Chhattisgarh, India. The Airports Authority of India (AAI) conducted a pre-feasibility study in July 2013 for development of the airport[1] and approved of operations of aircraft under Visual Flight Rules (VFR) conditions.[5] The airport was chosen for an upgrade under the Government's UDAN scheme and the ground breaking ceremony for the construction of a terminal building was performed in January 2017.[6][7] It was upgraded to 3C category in 2019, allowing the operations of ATR-72 type of aircraft.[8] On 21 September 2020, Alliance Air started flights to Hyderabad and Raipur using an ATR-72. The airport's name was changed on 21 September 2020.

AirporttypePublic
OperatorGovernment of Chhattisgarh
ServesJagdalpur
Quick facts Summary, Airport type ...
Maa Danteswari Airport
Summary
Airport typePublic
OwnerGovernment of Chhattisgarh[1]
OperatorGovernment of Chhattisgarh
ServesJagdalpur
LocationJagdalpur, Chhattisgarh, India
Elevation AMSL555 m (1,821 ft)
Coordinates19°04′28″N 082°02′13″E
Map
JGB is located in Chhattisgarh
JGB
JGB
Location of airport in Chhattisgarh and India
JGB is located in India
JGB
JGB
JGB (India)
Runways
Direction Length Surface
m ft
06/24 1,707 5,600 Asphalt
Statistics (April 2025 - March 2026)
Passengers64,679 (Decrease -13.1%)
Aircraft movements1,342 (Decrease -15.5%)
Cargo tonnage—
Source: AAI[2][3][4]
Close

Development

The district administration has floated a proposal to set up a new airport for Jagdalpur in Ulnar village of Bastar district. This airport is expected to be set up in an area measuring 250 hectares. It would have a 1.7 km long and 30 metres wide runway. The airport would reportedly have a state of the art terminal building. Since about 92% (229 hectares) of the land required is owned by the government, the land acquisition process is expected to be quick leading to a faster development time for the airport.[9]

Airlines and destinations

More information Airlines, Destinations ...
Close

Statistics

PassengersYearPassengersAnnual passenger traffic

See also

References

Related Articles

Timelines

Top Qs

Fact Checks