Gerald R. Ford International Airport

Airport in Michigan, US From Wikipedia, the free encyclopedia

Grand Rapids Gerald R. Ford International Airport (IATA: GRR, ICAO: KGRR, FAA LID: GRR) is a commercial airport in Cascade Township, approximately 13 miles (21 km) southeast of Grand Rapids, Michigan, United States. The facility is owned by the Kent County Board of Commissioners and managed by an independent authority.[3] The US Federal Aviation Administration (FAA) National Plan of Integrated Airport Systems for 2017–2021 categorized it as a small hub primary commercial service facility.[4]

Airport typePublic
OwnerGerald R. Ford International Airport Authority & Kent County
OperatorGerald R. Ford International Airport Authority
Quick facts Grand Rapids Gerald R. Ford International Airport, Summary ...
Grand Rapids Gerald R. Ford International Airport
Gerald R. Ford International Airport
Summary
Airport typePublic
OwnerGerald R. Ford International Airport Authority & Kent County
OperatorGerald R. Ford International Airport Authority
ServesGrand Rapids, Michigan, US
LocationCascade Charter Township, Michigan, US
OpenedNovember 1919;
106 years ago
 (1919-11)
Operating base forAllegiant Air
Elevation AMSL794 ft / 242 m
Coordinates42°52′51″N 85°31′22″W
Websitewww.grr.org
Maps
FAA airport diagram
FAA airport diagram
Interactive map of Grand Rapids Gerald R. Ford International Airport
Runways
Direction Length Surface
ft m
08R/26L 10,001 3,048 Concrete
08L/26R 5,001 1,524 Concrete
17/35 8,501 2,591 Concrete
Statistics (2024)
Total passengers4,303,696 Increase 3.15%
Aircraft movements80,849 Increase 5.1%
Total cargo (lbs.)47,386,884
Sources: The airport[1] and FAA[2]
Close

The facility opened as the Kent County Airport, but later, in December 1999, the airport was renamed for Gerald R. Ford, the 38th President of the United States. Ford represented the Grand Rapids area in the United States House of Representatives from 1949 to 1973.

As of September 2025, GRR had flights to 39 airports in the United States.[5] It is the primary commercial airport in West Michigan. It is the second-busiest airport in Michigan, after Detroit Metropolitan Airport. GRR covers 3,127 acres (1,265 ha).[2][6]

History

Grand Rapids' first airport broke ground in November 1919, four miles (6.4 km) south of downtown. This was eight years after the area witnessed its first landing, a Wright biplane at Comstock Park State Fairgrounds on September 10, 1911. The airport was operated by the Kent County Board of Supervisors.[citation needed]

The first scheduled air service in the United States was between Grand Rapids and Dearborn on a Ford-Stout monoplane named Miss Grand Rapids, which started July 26, 1926.[citation needed]

In 1938–39, the Works Progress Administration made improvements including adding new runways, runway widening, fencing, sodding, lighting, remodeling the administration building, and constructing a new restaurant.[7][8]

Circa 1940, the airport extended between 32nd and 36th Streets, from Jefferson Avenue east to the railroad; the west end was soon expanded south to just north of Himes Street and in the 1950s runway 18/36 was extended to 5700’ and reached south to 44th Street. It expanded numerous times after the war. By 1956, however, county officials considered the possibility that the airport had no more room to grow. A year later, a consultant recommended building a new, larger airport at another site.[citation needed]

In 1959, the county began construction on the present airport in Cascade Township, several miles east of the first airport. The new airport opened November 23, 1963, and was dedicated June 6, 1964; it had a 6,600-foot (2,000 m) runway designated 08/26 and a 3,400-foot (1,000 m) designated 18/36.[9] The first scheduled jet was a United Airlines Boeing 737-200 on April 28, 1968, from Chicago O'Hare. The aircraft, N9003U, was named City of Grand Rapids.[10] In 1968, the only scheduled non-stops beyond Michigan were to Chicago and Green Bay.[citation needed]

On January 27, 1977, the Board of Commissioners renamed Kent County Airport as Kent County International Airport with the opening of a U.S. Customs Service Office in the main terminal building.[citation needed]

Tribute room for President Gerald Ford

In 2004, the airport served more than 2 million passengers for the first time in a year.[11] In 2010, it broke the 2004 record with almost 2.2 million passengers, as increase of over 23% from 2009.[citation needed]

On January 2, 2007, a U.S. Air Force Boeing VC-25 jet carried the remains of former president Gerald Ford to his namesake airport as part of funeral services culminating in burial at his presidential museum in Grand Rapids the next day.[citation needed]

From April 2010 through October 2011, the airport was a focus city for Allegiant Air.[12][13][14]

Air Canada operated the airport's only international flights to Toronto Pearson International Airport from July 2008 until September 2013. It was the airline's second attempt at service between the two markets.[15]

Delta Air Lines used to operate Boeing 757-200s seasonally between Grand Rapids and Atlanta during the winter, making it the largest aircraft to serve GRR.[16]

Allegiant Air announced in mid-January 2019 that they would be making the airport one of Allegiant's 16 focus cities once again. After dropping GRR as a focus city in 2011, Allegiant is upgrading GRR again to a focus city adding Nashville, Tennessee, and Savannah-Hilton Head, Georgia, as new routes. Allegiant would later add other new destinations such as Los Angeles, Boston, and Newark.[17]

In 2013 the airport began building a natural treatment system to improve stormwater management practices and safeguard the waters of the Thornapple River. The new, innovative system will include a biological treatment system that will improve collection of stormwater runoff and naturally remove sediments and pollutants before sending the water to the Thornapple River, which flows just east of the airfield.[18]

The airport eliminated the two separate security checkpoints in each concourse and created one consolidated checkpoint in the grand hall area to help traffic flow much faster and to be prepared for future growth. In addition, the grand hall area and the entrance area to the airport was renovated with more shopping and dining options. Work began in late 2015 and completed in June 2017.[19]

The airport began construction of a roof over the parking deck in March 2015 to increase close-in, covered, long-term parking. The roof covers most of the fourth floor, though some spaces on the fourth and third floors remain uncovered due to airfield sight-line requirements for the FAA control tower. The garage roof was completed in November 2015 and will allow use of the fourth floor spaces during heavy snow.[20]

In 2016, the airport partnered with the Cascade Community Foundation on plans to renovate the current outdoor viewing area to make it a larger, more inviting place for people to relax.[21] The renovated park opened in May 2017.[22]

In November 2018 the airport began the phase II of the Gateway Transformation Project, reconstructing the baggage claim, check-in, and front of house areas. It has completed the apron reconstruction, adding new pavement to the apron and taxiway areas.[23]

In calendar year 2025, GRR set an all-time record with 4,303,696 passengers served, up 3.15% over 2024.[24]

Facilities

Gerald R. Ford International Airport has two parallel east–west runways and one north–south runway. Along with cargo and general aviation facilities, the airport has a passenger terminal with two concourses: A has 15 gates and B has eight.[25] Runways 08R/26L and runway 17/35 have ILS. The airport also has a 5,000-foot (1,500 m) general aviation runway north of the main 08R/26L runway.[citation needed]

In September 2017, the airport celebrated the opening of phase one of their Gateway Transformation, a 59,000-square-foot (5,500 m2) addition onto the passenger terminal facility that included a consolidated passenger security screening checkpoint, a new Marketplace with expanded retail and food & beverage offerings, new business centers and lounges, and much more. Concourse A's tenants are Delta Air Lines, American Airlines[26] and United Airlines. Southwest Airlines, Sun Country Airlines, Frontier Airlines and Allegiant Air occupy Concourse B.[25] All gates have climate-controlled jetways.[citation needed]

The airport is served by Signature Flight Support, which operates an FBO on the field. Besides fuel, the facility provides general maintenance, aircraft parking, courtesy and rental cars, conference rooms, pilot supplies, a crew lounge, snooze rooms, and more.[27]

When new baggage screening regulations were introduced by the Transportation Security Administration in 2002, the airport was the first in the nation to conduct trials on the new screening machines.[9] The baggage processing areas were too small for the machines so they were placed in the passenger lobby.[28]

The airport is also home to the West Michigan Aviation Academy, a public charter high school that focuses on aviation, STEM, and robotics educations. The school offers a fleet of Cessna 172 aircraft for flight training, allows students to build a Carbon Cub EX2 plane, and has a Redbird LD flight simulator.[29]

Airlines and destinations

Statistics

Top Domestic Destinations

More information Rank, City ...
Busiest domestic routes from GRR (April 2025 – March 2026)[68]
Rank City Passengers Carriers
1 Chicago–O’Hare, Illinois 310,640 American, United
2 Atlanta, Georgia 214,950 Delta, Frontier
3 Denver, Colorado 181,740 Frontier, Southwest, United
4 Detroit, Michigan 139,130 Delta
5 Minneapolis/St. Paul, Minnesota 133,790 Delta, Sun Country
6 Dallas/Fort Worth, Texas 127,980 American
7 Charlotte, North Carolina 122,630 American
8 Chicago–Midway, Illinois 102,510 Southwest
9 Las Vegas, Nevada 68,840 Allegiant, Southwest
10 Orlando–Sanford, Florida 66,510 Allegiant
Close

Airline market share

More information Rank, Airline ...
Largest airlines at GRR (April 2025 – March 2026)[68]
Rank Airline Passengers Share
1 Allegiant Air 796,000 18.90%
2 American Airlines 651,000 15.47%
3 Delta Air Lines 581,000 13.80%
4 Southwest Airlines 528,000 12.53%
5 United Airlines 423,000 10.05%
- Other* 1,231,000 29.25%
Close

*Includes flights operated by American Eagle, Delta Connection, and United Express partner airlines. The specific airline total passenger numbers only include mainline operations.

Annual traffic

PassengersYear1,500,0001,800,0002,100,0002,400,0002,700,0003,000,0003,300,0003,600,000199520002005201020152020PassengersAnnual passenger traffic
More information Year, Passengers ...
Annual passenger traffic (enplaned + deplaned) at GRR, 2003–present[69][70][71]
Year Passengers Year Passengers Year Passengers
2003 1,976,833 20122,134,956 2021 2,927,962
2004 2,150,125 20132,237,979 2022 3,468,156
2005 2,090,505 20142,335,105 20233,794,915
2006 2,015,846 20152,550,193 20244,172,068
2007 1,990,896 20162,653,630 20254,303,696
2008 1,809,445 20172,811,622 2026
2009 1,771,465 20183,263,234 2027
2010 2,185,924 20193,587,767 2028
2011 2,275,332 20201,758,741 2029
Close

Ground transportation

The airport is at the intersection of 44th Street and Patterson Avenue. It abuts I-96 on the east, M-6 on the south, M-37 on the west, and M-11 on the north.[citation needed]

Metro Cab and Metro Cars provides taxi and luxury sedan service and the airport is served by Avis, Budget, Enterprise, Hertz/Dollar, and National/Alamo rental car companies on-site.[72]

Rapid route 27, Airport Industrial, travels between the airport and Woodland Mall (Kentwood Station) on weekdays between 6:00 a.m. and 10:00 p.m. From Woodland Mall, passengers can continue on to downtown or parts of the east side of Grand Rapids via routes 5 and 6, or across town to Grandville and Wyoming on routes 24, 28, and 44.[73]

Planned development

In late August 2019, the airport made an announcement about its next focus, Project Elevate. This phase of airport development, consisting of three major projects, includes a $90 million expansion and extension of Concourse A to encompass 8 more gates, a $50 million relocation and construction of a new air traffic control tower as well as a $25 million federal inspection station to facilitate departures and arrivals of direct international flights.[74] As part of the concourse A expansion, some of the new tenants open including only one of two Freddy's that serve breakfast[75] and a Priority Pass club lounge.

Project Elevate expanded with some additional projects that include a $156 million rental car facility and additional parking in a new ramp that was announced in 2023 and is expected to be completed by late 2025.[76] And in April 2024, it was announced there would also be an $135 million Terminal Enhancement Project included as well expected to be completed by 2027 [77]