Wikiwand AI

Line 11 (Suzhou Metro)

Metro line in Suzhou, Jiangsu, China From Wikipedia, the free encyclopedia

Line 11[6] is a rapid transit line of the Suzhou Metro system. It was formerly known as Line S1 during planning and construction. Construction started on November 27, 2018. It opened on June 24, 2023.[3][7][8] The line uses driverless 6-car Class B rolling stock operating up to 100 km/h (62 mph).[9][10] Partial through-running with Line 3 began on December 23, 2023, and full through-running began on June 29, 2024.

StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations28[1]
Quick facts Overview, Status ...
Line 11
A train of Suzhou Metro Line 11
Overview
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations28[1]
Service
TypeRapid transit
SystemSuzhou Metro
Operator(s)Suzhou Rail Transit Co., Ltd
Rolling stock6-car Class B[2]
History
OpenedJune 24, 2023; 3 years ago (2023-06-24)[3]
Technical
Line length41.27 km (25.64 mi)
Number of tracks2
CharacterUnderground[4][5]
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrificationoverhead wire
Operating speed100 km/h (maximum)
Close

Description

Running west-east, the line mainly serves the urban area of Kunshan, and connects it to Suzhou Industrial Park in the west and nearby Shanghai in the east via a transfer at Huaqiao station to Line 11 of Shanghai Metro.[1] The line is the first metro line in downtown Kunshan.[4]

Stations

Service routes

  • Local service (L): Suzhou Xinqu Railway Station (Line 3) — Huaqiao
  • Rapid Service (R): Gongqing — Huaqiao, eastern bound in the morning, and western bound in the night
More information Service Routes, Station name ...
Service Routes Station name[11] Connections Distance[12]
km
Location
L R English Chinese
↑ Through service to/from Suzhou Xinqu Railway Station on  3 
● Weiting 唯亭 0.00 SIP
● Caoxieshan 草鞋山 2.12
● Yangchenghu East 阳澄湖东 6.35 Kunshan
● Zhengyi 正仪 China Railway AIH 7.95
● Lianhugongyuan 莲湖公园 9.95
● Zuchongzhigongyuan 祖冲之公园 11.27
● Kunshan Wenhuayishuzhongxin 昆山文化艺术中心 12.18
● ● Gongqing 共青 13.48
● ● Jiangpu 江浦 14.41
● | Baimajing 白马泾 15.82
● ● Yushanguangchang 玉山广场 17.20
● | Xiuyi 绣衣 18.55
● ● Kunshan Chengshiguangchang 昆山城市广场 19.64
● | Jinpudaqiao East 金浦大桥东 20.86
● | Shunfanbeilu 顺帆北路 21.99
● | Yuchijing 鱼池泾 22.92
● | Baihetan 白河潭 23.94
● ● Bingxi 兵希 25.04
● | Xiajiahegongyuan 夏驾河公园 26.33
● | Shengzhuang 盛庄 27.92
● | Zhangjilu South 章基路南 29.41
● | Xiaqiao 夏桥 31.25
● ● Shentongjing 神童泾 33.51
● | Lujia 菉葭 34.85
● ● Huaqiao Bolanzhongxin 花桥博览中心 37.16
● ● Jishan 集善 38.65
● | Huaxigongyuan 花溪公园 39.97
● ● Huaqiao 花桥 Shanghai Metro  11  41.17
Close

Through service

Through service between Line 3 and Line 11 started on December 23, 2023.[13]

Rolling stock

More information Fleet numbers, Year built ...
Fleet numbers Year built Time in service Builder Class Number in service No
of
car
Assembly Rolling stock Number Depots Line assigned Notes
210 (35 sets) 2022-2023 2023-present CRRC Nanjing Puzhen B 210 (35 sets) 6 Tc+Mp+M - M + Mp+Tc PM187 110101-113506 (1101-1135) Xushuguan Depot
South Weiting Yard
Chaoyang Road Depot
Huaqiao Yard
 3   11 
Close

References

Related Articles

Timelines

Top Qs

Fact Checks