Wikiwand AI

Ürümqi Metro

Metro system of Ürümqi, Xinjiang, China From Wikipedia, the free encyclopedia

The Ürümqi Metro or Ürümqi Subway is a rapid transit system in operation in Ürümqi, capital of the Xinjiang Autonomous Region in China. It is the 35th rapid transit system to be put into operation in Mainland China and the second in northwest China. At only 33.4 km (20.8 mi), the Ürümqi Metro is currently the smallest metro system in terms of length in the mainland.

LocaleÜrümqi, Xinjiang, China
TransittypeRapid transit
Number of lines
2
Number of stations
23
Quick facts Overview, Locale ...
Ürümqi Metro
A Line 1 train
A Line 1 train
Overview
LocaleÜrümqi, Xinjiang, China
Transit typeRapid transit
Number of lines
2
Number of stations
23
Daily ridership
162,000 (29 April 2023 record)[1]
Annual ridership
39,281,000 (2023)[1]
Websitehttp://www.urumqimtr.com/
Operation
Began operation
October 25, 2018; 7 years ago (2018-10-25)
OperatorÜrümqi Rail Transit Corporation
Number of vehicles
162 Revenue Railcars (July 2018)
Technical
System length33.4 km (20.8 mi)[2]
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
System map

Close
SimplifiedChinese乌鲁木齐地铁
TraditionalChinese烏魯木齊地鐵
Hanyu PinyinWūlǔmùqí Dìtiě
Hanyu PinyinWūlǔmùqí Dìtiě
Quick facts Chinese name, Simplified Chinese ...
Ürümqi Metro
Chinese name
Simplified Chinese乌鲁木齐地铁
Traditional Chinese烏魯木齊地鐵
Transcriptions
Standard Mandarin
Hanyu PinyinWūlǔmùqí Dìtiě
Uyghur name
Uyghurئۈرۈمچى مېتروسى‎
Transcriptions
Latin YëziqiÜrümchi Mëtrosi
Yengi YeziⱪÜrümqi Metrosi
SASM/GNCÜrümqi Mêtrosi
Siril YëziqiҮрүмчи Метроси
Close

The Ürümqi Metro has submitted plans for two lines, Line 1 and Line 2, with an estimated cost of 31.24 billion yuan.[3]

Lines

More information Line, Terminals ...
Line Terminals Operational Last extension Length
km
Stations
 1  International Airport
(Xinshi)
Santunbei
(Tianshan)
October 25, 2018 June 28, 2019 27.615[4] 21
 Airport MRT  International Airport
(Xinshi)
North International Airport
(Xinshi)
April 17, 2025 - 3.9 2
Close

Annual urban-rail passenger volume reported for Urumqi by CAMET. Values are passenger-trips in units of 10,000; reporting scope may include non-metro urban-rail modes and can vary by year.[5]

Passenger volume (10,000 passenger-trips)Year01000200030004000500020182019202020212022202320242025UrumqiAnnual urban rail passenger volume in UrumqiCAMET reported city network; scope may include non...

Year-end urban-rail operating length reported for Urumqi by CAMET, separating the metro series from the all-mode city total where both are reported.[5]

Operating length (km)Year1618202224262820182019202020212022202320242025Urumqi all modes (km)Urumqi metro (km)Urban rail operating length in Urumqi by modeYear-end length reported by CAMET

Line 1

Concourse of Erdaoqiao Station

Line 1 runs from Ürümqi Tianshan International Airport through downtown Ürümqi and ends at Santunbei station. It has a total length of 27.615 km[4] and 21 stations.[4][6] It is fully underground.[7]

Line 1 started construction on 20 March 2014. The northern section of the line was opened on 25 October 2018. The southern section of the line was opened on 28 June 2019.[4]

Airport MRT

The Airport MRT was opened on 17 April 2025, and runs in Ürümqi Tianshan International Airport only.[8][9] It consists of two stations, namely International Airport and International Airport North. This is treated as a shuttle, connecting the closed southern terminal and the northern terminal. They planned for an east terminal extension, but this was cancelled.

More information Station name, Transfer ...
Station name Transfer
English Chinese Uyghur
International Airport 国际机场 خەلقئارا ئايروپورت  1 

Ürümqi Diwopu International Airport URC South[a]

International Airport North 国际机场北 خەلقئارا ئايروپورت شىمال Ürümqi Diwopu International Airport URC North
International Airport East
(Not in operation)
国际机场东 شەرق خەلقئارا ئايروپورت
Close

Notes

  1. The South Terminal was closed on April 17th 2025 to make way for the new North Terminal

Under construction

Urumqi Metro Map with planned expansions shown.

Line 2

Ürümqi metro line 2 is under construction. The line will have 16 stations from Yan'an Road to Huashan Street.[10] Line 2 will serve Ürümqi railway station. The first stretch will open from Huashan Street up to Nanmen in December 2026, with a test site already opened in April 2025. The rest of the part will open in 2027. The following is the route:[citation needed]

The color of this line is green.

Phase 2 of line 2 is currently[when?] in early consideration on planning. A 5.33 km section of phase 2 is completed on 17 April 2025 as Airport MRT.

Future Development

Lines 3, 4, 5, 6, 7, 8, 9 and 10 are under planning.

Network planning map

Network Map

See also

Other Transport in Ürümqi

References

Related Articles

Timelines

Top Qs

Fact Checks