Wikiwand AI

Line 4 (Xiamen Metro)

Under construction metro line in Xiamen, China From Wikipedia, the free encyclopedia

Line 4 of Xiamen Metro is an under construction metro line in Xiamen, Fujian, China. The Xiang'an Airport section is scheduled to operate in June 2026.[2] As the fastest fully automated metro train currently operating in Xiamen, travel time from Xiamen North railway station to Xiang'an Airport will be reduced to 30 minutes.[2][6]

Other nameOuter Bay Ring Express Line[1]
StatusTrial operation
Quick facts Overview, Other name ...
Line 4
Exterior of Guanxun station
Overview
Other nameOuter Bay Ring Express Line[1]
StatusTrial operation
OwnerXiamen Metro
LocaleXiamen, Fujian, China
Termini
  • Xiang'an Airport
  • Jimei Software Park North
    Songyu Wharf (Future)
Stations12 (Xiang'an Airport section phase 1) [2]
21 (total)
Service
TypeRapid transit
SystemXiamen Metro
OperatorXiamen Metro Xiamen Metro
DepotHouxi depot[3]
History
Opened16 September 2026; 28 days ago (2026-09-16) (Trial operation)
Technical
Line length44.78 km (27.83 mi) (Xiang'an Airport section phase 1) [2][4]
71.23 km (44.26 mi) (total)[5]
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1.5 kV DC Overhead catenary contact
Operating speed120 km/h (75 mph) (Maximum design speed)[2]
Close

This is the first subway line of Xiamen Metro system to adopt GoA4 automation level.[7]

Among the distance of 44.78 km (27.83 mi) on the Phase 1; 22.48 km (13.97 mi) is an underground section, 20.95 km (13.02 mi) and 1.35 km (0.84 mi) is a transition section.[8]

History

The key engineering projects for Line 4 were announced in December 2015.[1]

Construction began in December 2015 with an estimated total construction period of 57 months.[9]

On the morning of 11 April 2020, the 1.36 km (0.85 mi) bridge elevated section from Caicuo to Dadeng North was completed.[4]

On 16 April 2024, the main structure of Airport West Station of Line 3 and Line 4 were successfully topped out.[10]

In August 2024, the rolling stock set of Line 4 officially debuted.[6]

On 26 November 2024, Line 4 rolling stock began testing without passengers.[11]

On 10 October 2025, Line 4 began trial operation.[12]

From 9:30 am on 16 September 2026, Line 4 will open trial ride activity for the public along with Line 6[13].

Stations

Service route: Runs from Jimei Software Park North to Qianwu, without stops at Xiyan. Operating hours daily from 8:00 to 20:00, with trains run on schedule within 14 minutes and 45 seconds minute intervals, throughout the day[14].

More information Section, Station name ...
Section Station name Transfer Distance

km

Location
English Chinese
? Songyu Wharf 嵩屿码头 Haicang
Nanhai Road 南海路
Linggang Xincheng 临港新城
Phase 2 Maluan Bay South 马銮湾南
Maluan Center 马銮中心  2 
Maluan Bay North 马銮湾北
Guankou 灌口 Jimei
Software Park Phase 3 East 软三东
Phase 1 (Xiang'an Airport section)[15] Jimei Software Park North 集美软件园北
Houxi 后溪
Xiamen North Railway Station 厦门北站  1  Xiamen North Railway Station XKS
Xiamen BRT
Guanxun 官浔 Xiamen BRT Tong'an
Bingzhou 丙洲
Chengchang 城场 Xiang'an
Xiyan 西岩
Hongkeng 洪坑  3 
Qianwu 前浯
Dongting 洞庭
Airport West 机场西  3 
Xiang'an Airport XMN
Xiang'an Airport 翔安机场 Xiang'an Airport XMN
Phase 1 long term planning Airport East 机场东 Xiang'an Airport XMN
Close

Rolling stock

In the first phase, 18 four-car train set produced by CRRC Changchun adopting GoA4 automation level will be implemented to meet the demands.[1][16][3]

Future expansions

Phase 2 of Line 4 has been approved, with a total investment of 10.1 billion RMB. Phase 2 consists of 5 stations, spanning 14.8 km (9.2 mi) long. It is expected to be completed in October 2028.[9][8][17]

References

Related Articles

Timelines

Top Qs

Fact Checks