The Luís de Camões class is a class of two auxiliary oiler replenishment (AOR) and logistics support vessels currently under construction for the Portuguese Navy. Designed by the Turkish defense company STM and built at the Ada Shipyard in Istanbul, the class is intended to restore Portugal's independent blue-water logistics capability, which was lost following the decommissioning of the fleet tanker NRP Bérrio in 2020.[2]

Builders
Operators Portuguese Navy
Preceded byBérrio class
Cost100 million (2024) (equivalent to 100.94 million in 2025)[1] for 2 units
Quick facts Class overview, Builders ...
Artist impression
Class overview
Builders
Operators Portuguese Navy
Preceded byBérrio class
Cost100 million (2024) (equivalent to 100.94 million in 2025)[1] for 2 units
Built2025-present
Planned2
Building1
General characteristics
TypeAuxiliary oiler replenishment and logistics support vessel
Displacement11,000 t (11,000 long tons)
Length137 m (449 ft 6 in)
Beam19.10 m (62 ft 8 in)
Draught6.70 m (22 ft 0 in)
Speed18 knots (33 km/h; 21 mph) (maximum)
Range14,000 nmi (26,000 km) at 14 knots (26 km/h; 16 mph)
Endurance90 days
Capacity
Crew100
Armament2 × Phalanx CIWS
Aircraft carried1 × helicopter/UAV
Aviation facilitiesAft helicopter deck and hangar
Close

The lead ship, NRP Luís de Camões, is scheduled for delivery in April 2028, followed by the NRP D. Dinis in December of the same year. Beyond traditional fleet refueling, the vessels are designed as multi-purpose platforms capable of humanitarian aid, disaster relief, and support for amphibious operations.

Design and Development

Background

For decades, the Portuguese Navy relied on NRP Bérrio to sustain long-range deployments. After the Bérrio was scrapped due to structural issues and aging systems, the Portuguese government initiated the Navio Reabastecedor de Esquadra e Logístico (NRE+) program. This project was funded under the Military Programming Law (LPM) with a budget of approximately €100 million for two units.

In December 2024, the Portuguese Navy signed a contract with the Turkish firm STM for the design and construction of the vessels. This marked a milestone as the first time a NATO and European Union member state imported a naval project of this scale from Turkey.[2]

Construction

The construction of the class officially began with the steel-cutting ceremony for the lead ship, Luís de Camões, on 14 November 2025.[3] The keel was subsequently laid on 29 January 2026.[4][5] While the primary hulls are being constructed in Turkey, the project includes significant Portuguese industrial participation, specifically in the integration of command, control, and communication systems.

Ships in class

More information Hull number, Name ...
Hull number Name Builder Laid down Launched Commissioned Decommissioned Status Notes
A5211 Luís de Camões Ada Shipyard, Istanbul 29 January 2026 2028 (planned) Under construction [2][3][4]
A5212 D. Dinis 2028 (planned) Ordered [2]