Mallow–Tralee railway line

Railway line in Ireland From Wikipedia, the free encyclopedia

The Mallow–Tralee line runs from Mallow to Tralee Casement. Intermediate stations include Banteer, Millstreet, Rathmore, Killarney and Farranfore.

StatusOperational
Termini
Stations7
Quick facts Overview, Status ...
Mallow–Tralee
Service from Cork after reversing out of Killarney station to continue forwards to Tralee
Overview
StatusOperational
LocaleCounty Cork, County Kerry
Termini
Stations7
Service
TypeHeavy rail, Inter-city rail
SystemIarnród Éireann
ServicesMallow–Tralee
Dublin–Tralee
Cork–Tralee
Operator(s)Iarnród Éireann
Rolling stock22000 Class
History
Opened15 July 1853 (1853-07-15)
Technical
Line length61.5 mi (99.0 km)
Number of tracksSingle track
Track gauge1,600 mm (5 ft 3 in) Irish gauge
Operating speed70 mph (110 km/h)
Mallow-Tralee

Mallow
Lombardstown
Banteer
Newmarket branch line
Rathcool
Millstreet
Rathmore
Kenmare branch line
Headford Junction
Killarney
Ballybrack
Farranfore
for Kerry Airport Kerry Airport
Castleisland branch line
Gortatlea
Tralee Casement
Fenit branch line
Close

A peculiar arrangement at Killarney is in place, in which trains from Mallow enter Killarney, which is a dead-end. Trains continuing to Tralee then have to reverse until they reach the junction, before changing direction again to continue westwards.[1]

Irish Rail's network statement gives the length of the line as 61.5 miles (99.0 km),[2] though other sources give the length of the line as 62+14 miles instead.[3] The line from Mallow to Killarney was noted for severe gradients compared to the line from Dublin to Mallow though the Killarney expresses of 1899 were timed to achieve the section at 40.75 miles per hour (65.58 km/h) westbound and 38.2 miles per hour (61.5 km/h) eastbound.[3]

History

The Killarney Junction Railway (KJR) completed the construction of the line from Mallow to the holiday resort of Killarney in 1853. The Tralee and Killarney Railway opened the extension from Killarney junction to Tralee in 1859.[4] The Great Southern and Western Railway (GS&WR) who had invested in both companies absorbed them both in 1860.[1]

At Tralee there were small sidings that were convenient to those of the narrow gauge Tralee and Dingle Light Railway. There was also links beyond the road to the marshalling yards, the branch to Fenit, and the Limerick–Tralee line.[5]

Rolling stock

Alexander McDonnell GS&WR Class 2 Kerry bogies were specifically intended for passenger services on the line.[6] There was a trial of a Drumm Battery Train with temporary charging points set up on the line during the late 1930s or 1940s.[7] 22000 Class ICR railcars first began passenger services on the line in September 2008.[8]

Branches

A non-geographical diagram of the Mallow - Tralee line.

Castleisland

The 4 miles (6.4 km) long Castleisland branch connected to the main line at Gortalea at a junction facing Tralee. It closed in 1974.[9] Alexander McDonnell designed a combined engine and carriage, the GS&WR Class 90, to work the branch.[6]

Kenmare

The branch to Kenmare was about 20 miles (32 km) long and was opened on 4 September 1893.[1] It closed on 1 February 1960.[4][10][11]

Newmarket

There was a 8+34 miles (14.1 km) branch to Newmarket from Banteer with an intermediate station at Kanturk.[12] The line opened on 1 April 1889 which closed to passengers on 27 January 1947 and completely on 1 January 1963,[1] though other sources say 4 February 1963.[4]

Valentia

The terminus on the branch to Valentia Harbour was further west than any in Europe.[9]

The railway passes close by to Kerry Airport, with the station at Farranfore being located about 1 mile (1.6 km) away.[13][14]

References

Related Articles

Wikiwand AI