Wikiwand AI

Mahanagar Prabhati/Godhuli Express

Intercity passenger train in Bangladesh From Wikipedia, the free encyclopedia

Mahanagar Prabhati/Godhuli Express (Train No. 703/704) is an intercity passenger train in Bangladesh operated by Bangladesh Railways, which runs between Chittagong Railway Station in Chittagong District and Kamalapur railway station in Dhaka District. The train runs from Chittagong to Dhaka under the name Mahanagar Godhuli and from Dhaka to Chittagong under the name Mahanagar Prabhati.[1][2] The train connects Feni, Comilla, Brahmanbaria districts along the route. Along with this train, the following trains run on the Chittagong-Dhaka route: Subarna Express, Mahanagar Express, Turna Express, Shonar Bangla Express, Chattala Express, Dhaka/Chittagong Mail and Karnaphuli Express. The base of the train is Chittagong Railway Station.[3][4][5]

Service typeInter-city rail
StatusOperating
First service25 February 1986
Current operatorBangladesh Railway
Quick facts Overview, Service type ...
Mahanagar Prabhati/Godhuli Express
Overview
Service typeInter-city rail
StatusOperating
First service25 February 1986
Current operatorBangladesh Railway
Route
TerminiChattogram railway station
Kamalapur railway station
Stops8
Train number703/704
On-board services
Seating arrangementsAirline style
Sleeping arrangementsYes
Catering facilitiesOn-board
Observation facilitiesLarge windows
Entertainment facilitiesYes
Baggage facilitiesOverhead racks
Technical
Track gauge1,000 mm (3 ft 3+38 in)
ElectrificationN/A
Operating speed80 km
Average length18/36
Rake maintenancePahartali
Rake sharingTurna Express
Close
Mohanagar Provati/Godhuli Express
Mohanagar Provati/Godhuli Express

History

The train was inaugurated on Friday, 25 February 1986. The train officially started running on Saturday, 26 February 1986. At that time, the train was running on the Dhaka - Dohazari route. From 1998, two trains, Mahanagar Prabhati/Godhuli and Turna, started running by sharing rakes. From 2002, the train started running on the Dhaka - Chittagong route.[6]

Stopover

(Sometimes, the stops of a train may be changed by Bangladesh Railway. The following list is valid till 2020.)

Rolling stock

The train uses a 3000 class locomotive. Previously, 2900 or 2600 class locomotives were used. The train initially ran on a rake of old green-yellow vacuum brake coaches. Later in 2011, this rake was changed to a white Chinese air brake coach rake. Later, the train's rake was changed again to red-green Indonesian air brake PT Inka 2016 model coach rake. Currently, the train runs on a 18/36 load. Out of these 18 coaches, there are 5 AC chairs, 3 AC sleepers, 1 non-AC sleepers, 6 fully shovon chairs, 2 shovon chairs guard brake + dining car and 1 power car. When passenger demand increases (such as during Eid), the train is run on a 21/42 load. Currently, it is being operated with state-of-the-art coaches imported from Korea.[7][8]

References

Related Articles

Timelines

Top Qs

Fact Checks