Wikiwand AI

Munich-Englschalking station

Railway station in Munich, Germany From Wikipedia, the free encyclopedia

Munich-Englschalking is a Munich S-Bahn station on the Munich East–Munich Airport railway in the borough of Bogenhausen.

LocationBrodersenstraße/Seidleinweg
81925 Munich
Bogenhausen, Bavaria
Germany
Coordinates48°09′24″N 11°38′54″E
Operator
Quick facts München Englschalking, General information ...
München Englschalking
s-bahn
2012
General information
LocationBrodersenstraße/Seidleinweg
81925 Munich
Bogenhausen, Bavaria
Germany
Coordinates48°09′24″N 11°38′54″E
OwnerDeutsche Bahn
Operator
Lines
Platforms2 side platforms
Tracks2
Train operators
S-Bahn München
Construction
Parkingyes
Cycle facilities
yes
Accessibleno
Other information
Station code4250
DS100 codeMEGS[1]
Category5 [2]
Fare zoneMVV: M[3]
Websitewww.bahnhof.de
History
Opened9 July 1911; 115 years ago (1911-07-09)
Services
Preceding station Munich S-Bahn Following station
Daglfing
towards Herrsching
S8 Johanneskirchen
towards Flughafen
Location
Close
Munich Airport S-Bahn service
Freising
Munich Airport Terminal
Besucherpark
Erding
Neufahrn
Markt Schwaben
Munich East
Munich-Laim
Munich-Pasing

Future development

There are a number of development plans for the railway station and its vicinity.[4]

U-Bahn extension

An extension of the Munich U-Bahn line U4 from Arabellapark is planned to connect the station with Munich's U-Bahn network. Due to budget considerations, an alternative Stadtbahn line is also considered.

Munich Airport Express

As the Munich city government is opposed to plans of the Bavarian government to build a Transrapid mag-lev line from München Hauptbahnhof to the Airport, it has proposed an alternative Express S-Bahn, MAEX, that should run along the tracks of the current S8 S-Bahn line. To achieve a fast connection of airport and central station, the construction of a tunnel along the current tracks of the S8 has been proposed.

Englschalking grade crossing

Independent of the city government's plans, Deutsche Bahn is considering the construction of a short S-Bahn tunnel to make the grade crossing at the station redundant as it constantly leads to traffic jams. Also, the long waiting times at the crossing hamper the development of the districts east of the railway line. Alternatively, a bridge construction is considered.

References

Related Articles

Timelines

Top Qs

Fact Checks