Gilcrease Expressway
Highway in Tulsa County, Oklahoma, United States
From Wikipedia, the free encyclopedia
The Gilcrease Expressway is a 16.7-mile-long (26.9 km) highway in Tulsa County, Oklahoma, United States. It is part of the county's long-term plan to complete an outer highway loop around Tulsa's central business district. The highway will connect Interstate 44 (I-44) in Sapulpa to I-244 near Tulsa International Airport.
highways
Gilcrease Expressway | |
|---|---|
Gilcrease Expressway highlighted in red | |
| Route information | |
| Maintained by ODOT | |
| Length | 16.7 mi[1] (26.9 km) |
| Component highways | |
| Western segment | |
| Length | 6.2 mi[1] (10.0 km) |
| South end | |
| Major intersections | |
| North end | Edison Street in Tulsa |
| Eastern segment | |
| Length | 10.5 mi[1] (16.9 km) |
| West end | 41st West Avenue in Tulsa |
| Major intersections | L.L. Tisdale Parkway in Tulsa |
| East end | |
| Location | |
| Country | United States |
| State | Oklahoma |
| Highway system | |
| |
Route description
The eastern segment of the highway runs from North 41st West Avenue east to Interstate 244. From US-75 to I-244/US-412, the Gilcrease carries the easternmost part of State Highway 11. The currently existing highway serves Tulsa International Airport and surrounding areas.
Additionally, the Gilcrease Expressway Extension has been constructed. On October 29, 2015, Governor Mary Fallin announced Driving Forward, a $892 million turnpike package. A five-mile (8.0 km) tolled extension of the Gilcrease Expressway was included in the package.[2] The project began in the third quarter of 2016.[3]
On June 4, 2018, the Oklahoma Transportation Commission approved the designation Oklahoma State Highway 344 for the highway, to take effect upon completion of construction.[4] The extension opened on November 14, 2022.[5]
Future
In 2010, the Oklahoma Legislature authorized the Oklahoma Turnpike Authority to study the construction of a turnpike to complete the Gilcrease Expressway. The cost of the turnpike was estimated at $373 million for the final 6.7 miles (10.8 km) of the expressway.[6]
The next portion of the Gilcrease Expressway to be constructed is the segment between 41st West Avenue and Edison Street in West Tulsa. Although, the section between 41st West Avenue and Edison Street is named 31st Street North, 53rd West Avenue, Newton Street and 57th West Avenue.[7]
Many homes have been removed along 57th West Avenue between West 26th Street and West 21st Street. Plans include construction of a bridge over the Arkansas River, connecting Sand Springs and Berryhill.
$88 million of a $918.7 million tax increase will be put forward to the expressway's extension.[8]
Junction list
The entire route is in Tulsa County.
| Location | mi[1][9] | km | Exit | Destinations | Notes | ||
|---|---|---|---|---|---|---|---|
| Sapulpa | 0.00 | 0.00 | Southern terminus; southern terminus of SH-344;[2] exits 223A-B on I-44 | ||||
| Oakhurst | 0.9 | 1.4 | 1 | 51st Street | |||
| 1.5 | 2.4 | Toll Gantry | |||||
| 2.0 | 3.2 | 2 | 41st Street South | ||||
| | 2.7 | 4.3 | Toll Gantry | ||||
| | 4.0 | 6.4 | 4 | 21st Street South / Avery Drive | [2] | ||
| Tulsa | 4.9 | 7.9 | Toll Gantry | ||||
| | 5.6 | 9.0 | Northern terminus of SH-344 | ||||
| Tulsa | 6.2 | 10.0 | Northern end of limited-access section | ||||
| Edison Street | Current northern terminus | ||||||
| Gap in route | |||||||
| Tulsa | 0.0 | 0.0 | 41st West Avenue | Current western terminus | |||
| 2.2 | 3.5 | L.L. Tisdale Parkway – Downtown Tulsa, Gilcrease Museum | |||||
| Western end of freeway section | |||||||
| 3.5 | 5.6 | Peoria Avenue / Mohawk Boulevard | |||||
| 4.4 | 7.1 | Lewis Avenue | |||||
| 5.0 | 8.0 | Western end of SH-11 concurrency | |||||
| 5.6 | 9.0 | Harvard Avenue | |||||
| 6.5 | 10.5 | Yale Avenue | |||||
| 7.5 | 12.1 | Apache Street / Sheridan Road – Tulsa Zoo | Apache Street not signed westbound | ||||
| 8.5 | 13.7 | Virgin Street not signed eastbound | |||||
| 9.1 | 14.6 | Memorial Drive / Pine Street | Signed for Memorial Drive eastbound, Pine Street westbound | ||||
| 10.5 | 16.9 | Eastern terminus; eastern terminus of SH-11; exit 12B on I-244 | |||||
| 1.000 mi = 1.609 km; 1.000 km = 0.621 mi | |||||||
