List of wind farms in the Republic of Ireland
From Wikipedia, the free encyclopedia
Operating
Onshore
| Wind Farm | Capacity (MW) | No. | Turbine Vendor | Model | Size (MW) | Operator | Completed | County | Coordinates |
|---|---|---|---|---|---|---|---|---|---|
| Altagowlan | 7. 65 | 9 | Siemens Gamesa | G52 | 0.85 | B9 | 2005 | Roscommon | 54.1215°N 8.1454°W |
| Anarget | 1.2 | 2 | Enercon | E-40 | 0.6 | 2004 | Donegal | 54.7553°N 8.1689°W | |
| Anarget Extension | 0.9 | 1 | Enercon | E-44 | 0.9 | 2007 | Donegal | 54.7553°N 8.1689°W | |
| Astellas | 0.8 | 1 | Enercon | E-53 | 0.8 | 2011 | Kerry | 52.1116°N 9.7769°W | |
| Athea | 34 | 16 | GE | SSE Renewables[1] | 2014 | Limerick | 52.4408°N 9.2909°W | ||
| Ballincollig Hill | 13.3 | 16 | Enercon | E-44 E-48 | 0.9 0.8 | 2009 | Kerry | 52.3104°N 9.5857°W | |
| Ballinlough/Ikerrin | 2.55 | 3 | Vestas | V52 | 0.85 | 2006 | Tipperary | 52.8300°N 9.0113°W | |
| Ballinveny | 2.55 | 3 | Vestas | V52 | 0.85 | 2006 | Tipperary | 52.8194°N 7.9510°W | |
| Ballybane | 29.9 | 13 | Enercon | E-70 | 2.3 | Windprospect | 2008 | Cork | 51.6329°N 9.3762°W |
| Ballymartin | 6.9 | 3 | Enercon | E-82 | 2.3 | Ørsted[2] | 2010 | Kilkenny | 52.3882°N 7.1067°W |
| Ballywater | 42 | 21 | Enercon | E-70 | 2 | 2006 | Wexford | 52.5353°N 6.2396°W | |
| Bawnmore 1 | 11.5 | 5 | Enercon | E-82 | 2.3 | 2011 | Cork | 51.9533°N 8.9138°W | |
| Bawnmore 2 (Carriganima) | 13.8 | 6 | Enercon | E-82 | 2.3 | 2011 | Cork | 51.9905°N 9.0207°W | |
| Barnesmore | 15 | 25 | Vestas | V42 | 0.60 | ScottishPower Renewables | 1997 | Donegal | 54.6966°N 7.9358°W |
| Beal Hill 1 | 1.65 | 1 | Vestas | V66 | 1.65 | 2000 | Kerry | 52.5643°N 9.6326°W | |
| Beal Hill 2 | 2.55 | 3 | Vestas | V52 | 0.85 | 2003 | Kerry | 52.5643°N 9.6326°W | |
| Beallough | 1.7 | 2 | Vestas | V52 | 0.85 | 2008 | Waterford | 52.2718°N 7.3480°W | |
| Beam Hill | 14 | 8 | Vestas | V66 | 1.75 | 2008 | Donegal | 55.1982°N 7.4402°W | |
| Beenageeha | 3.96 | 6 | Vestas | V47 | 0.66 | B9 | 2000 | Kerry | 52.3307°N 9.5610°W |
| Bindoo | 48 | 32 | GE | 1.5s | 1.5 | SSE Renewables[3] | 2007 | Cavan | 54.0121°N 7.1070°W |
| Blackbanks/1 | 3.4 | 4 | Vestas | V52 | 0.85 | ESBI | 2001 | Leitrim | 54.1444°N 8.1911°W |
| Blackbanks/2 | 6.8 | 8 | Vestas | V52 | 0.85 | ESBI | 2005 | Leitrim | 54.1444°N 8.1911°W |
| Boggeragh | 57 | 19 | Vestas | V90 | 3 | 2009 | Cork | 52.0505°N 8.8980°W | |
| Booltiagh 1 | 18 | 12 | GE | 1.5s | 1.5 | Ørsted[2] | 2005 | Clare | 52.7822°N 9.2462°W |
| Booltiagh 2 | 12 | 6 | 2 | Ørsted[2] | 2013 | Clare | |||
| Boolynagleragh | 40 | 18 | Nordex | N90 | 2.5 | Invis Energy[4] | 2020 | Clare | |
| Bruckana | 42 | 14 | Siemens Gamesa | 3.0DD-101 | 3 | Bord na Móna[5] | 2014 | Tipperary Kilkenny Laois | 52.7823°N 7.6688°W |
| Burtonport | 0.66 | 1 | Vestas | V47 | 0.66 | Burtonport Fisheries | 2003 | Donegal | 54.9800°N 8.4403°W |
| Caherdowney | 9.2 | 4 | Enercon | E-70 | 2.3 | 2012 | Cork | 52.0011°N 9.1170°W | |
| Cappawhite | 51 | 17 | Vestas | V112 | 3 | ESB[6] | 2017 | Tipperary | 52.6076°N 8.1609°W |
| Cark | 15 | 25 | NEG Micon | NM43 | 0.6 | B9 | 1997 | Donegal | 54.8865°N 7.8803°W |
| Carnsore | 11.9 | 14 | Vestas | V52 | 0.85 | ESB[6] | 2002 | Wexford | 52.1787°N 6.3623°W |
| Carrane Hill | 3.4 | 4 | Siemens Gamesa | G52 | 0.85 | ESB[6] | 2006 | Sligo | 54.1342°N 8.2298°W |
| Carrigcannon | 23 | 10 | Enercon | E-70 | 2.3 | 2010 | Cork | 52.0703°N 8.8990°W | |
| Carrigdangan | 54.3 | 9 | 6.03 | 2021 | Cork | 51.8029°N 9.1387°W | |||
| Carrig | 2.55 | 3 | Vestas | V52 | 0.85 | 2006 | Tipperary | 53.0318°N 7.9777°W | |
| Carrons | 4.6 | 2 | Enercon | E-82 | 2.3 | 2010 | Limerick | 52.5409°N 9.0696°W | |
| Carrowleagh | 36.8 | 16 | Enercon | E-70 | 2.3 | 2012 | Mayo | 54.1386°N 8.9503°W | |
| Castledockrell | 41.4 | 18 | Enercon | E-70 | 2.3 | Castledockrell Wind Group Limited | 2011 | Wexford | 52.5865°N 6.6460°W |
| Castlepook | 33.3 | 14 | Nordex | N90 | 2.5 | ESB[6] Coillte | 2018 | Cork | 52.2938°N 8.5634°W |
| Cloghboola | 48 | 16 | Enercon | E82 | 3 | 2015 | Kerry | 52.3358°N 9.4380°W | |
| Cloncreen | 75 | 21 | Vestas | V136 | 3.45 | Bord na Móna[5] | 2022 | Offaly | |
| Clydaghroe | 4.6 | 2 | Enercon | E70 | 2 | 2012 | Cork | 51.9894°N 9.1580°W | |
| Coomacheo | 41.4 | 18 | Siemens Gamesa | 2.3VS | 2.3 | SSE Renewables[7] | 2008 | Cork | 52.0144°N 9.145°W |
| Coomatallin | 6 | 4 | GE | 1.5SE | 1.5 | SSE Renewables[8] | 2005 | Cork | 51.6508°N 9.0942°W |
| Cornacahan Hill | 2.7 | 3 | Enercon | E-44 | 0.9 | 2007 | Donegal | 54.6600°N 8.4584°W | |
| Corneen | 3 | 2 | GE | 1.5S | 1.5 | SSE Renewables[9] | 2001 | Cavan | 54.1432°N 7.6443°W |
| Corry Mountain | 4.8 | 8 | Vestas | V42 | 0.6 | Eco Wind Power | 1997 | Leitrim | 54.1300°N 8.1528°W |
| Crocane | 1.6 | 2 | Enercon | E-48 | 0.8 | 2010 | Cork | 51.8431°N 8.1566°W | |
| Crockahenny | 5.0 | 10 | Enercon | E-40 | 0.5 | ESB[6] | 1998 | Donegal | 55.1447°N 7.2704°W |
| Cronalaght 1&2 | 4.8 | 8 | Vestas | V39 | 0.6 | 1997 | Donegal | 55.0645°N 8.2160°W | |
| Cronelea | 6.9 | 3 | Enercon | E-70 | 2.3 | 2007 | Wicklow | 52.7791°N 6.5548°W | |
| Cronelea Upper | 1.8 | 2 | Enercon | E-44 | 0.9 | Wicklow | |||
| Cronelea Upper | 2.55 | 3 | Vestas | V52 | 0.85 | 2005 | Wicklow | ||
| Cuillalea | 3.4 | 4 | Vestas | V52 | 0.85 | 2004 | Mayo | 53.8485°N 9.07122°W | |
| Culliagh | 12 | 18 | Vestas | V47 | 0.66 | SSE Renewables[10] | 2000 | Donegal | 54.8689°N 7.8899°W |
| Curragh | 18 | 8 | Siemens Gamesa | 2.3VS | 2.3 | SSE Renewables[11] | 2009 | Cork | 52.0081°N 9.1111°W |
| Curraghgraigue Upper | 5.1 | 6 | Vestas | V52 | 0.85 | 2004 | Tipperary | 52.7969°N 8.1044°W | |
| Cushaling[12] | 55 | 9 | Vestas | V162 | 6.2 | Statkraft | 2024 | Offaly | [13] 22 MW 4-hour battery[14] |
| Derrybrien | 60 | 70 | Vestas | V52 | 0.85 | ESBI | 2006 | Galway | 53.0933°N 8.6060°W |
| Derrynadivva | 8 | 10 | Enercon | E-48 | 0.8 | 2009 | Mayo | 53.9104°N 9.3408°W | |
| Derrysallagh | 32 | 10 | GE | 3.2 | Energia[15] | 2020 | Sligo | 54.0968°N 8.1908°W | |
| Dromada | 28.5 | 19 | GE | 1.5s | 1.5 | SSE Renewables[16] | 2010 | Limerick | 52.4462°N 9.2120°W |
| Dromadda Beg | 10.2 | 3 | Siemens Gamesa | SWT-3.4-101 | 3.4 | Innogy | 2018 | Kerry | 52.3309°N 9.4528°W |
| Drumlough | 4.8 | 8 | Windmaster | 0.6 | B9 | 1997 | Donegal | 55.2052°N 7.4474°W | |
| Drybridge/Dunmore | 1.7 | 2 | Vestas | V52 | 0.85 | 2006 | Louth | ||
| Dundalk IT | 0.85 | 1 | Vestas | V52 | 0.85 | DIT | 2005 | Louth | |
| Dunmore | 1.8 | 2 | Enercon | E-44 | 0.9 | 2009 | Louth | ||
| Dunneill | 11.1 | 13 | 0.85 | SSE Renewables[17] | 2010 | Sligo | 54.2098°N 8.8489°W | ||
| Esk | 23.2 | 8 | Nordex | N90 | 2.5 | Invis Energy[4] | 2020 | Cork | |
| Flughland | 9.2 | 4 | Enercon | E-70 | 2.3 | Ørsted[2] | 2009 | Donegal | 55.1385°N 7.2691°W |
| Galway Wind Park | 174 | 58 | Siemens Gamesa | SWT-3-0-101 | 3 | SSE Renewables[18] Greencoat Renewables | 2017 | Galway | 53.3554°N 9.3698°W |
| Garracummer | 42.5 | 17 | Nordex | N90 | 2.5 | Ørsted[2] | 2013 | Tipperary | 52.6437°N 8.1470°W |
| Gartnaneane | 15 | 10 | GE | 1.5S | 1.5 | SSE Renewables[19] | 2004 | Cavan | 53.9458°N 6.9350°W |
| Garvagh Glebe | 26 | 13 | Vestas | V80 | 2 | ESB[6] | 2010 | Leitrim | 54.1409°N 8.1938°W |
| Geevagh | 5 | 6 | Siemens Gamesa | G52 | 0.85 | B9 | 2006 | Sligo | 54.1418°N 8.2676°W |
| Gibbet Hill | 15 | 6 | Nordex | N90 | 2.5 | 2013 | Wexford | 52.6744°N 6.5980°W | |
| Glackmore | 2.3 | 1 | Enercon | E-70 | 2.3 | 2008 | Donegal | 55.1244°N 7.2731°W | |
| Glenmore | 34.2 | 12 | Nordex | N90 | 2.5 | Invis Energy[4] | 2019 | Clare | |
| Glenough | 35 | 14 | Nordex | N80/N90 | 2.5 | ABO Wind | 2011 | Tipperary | 52.6419°N 8.055°W |
| Gneeves | 9.4 | 11 | Vestas | V52 | 0.85 | Ørsted[2] | 2006 | Cork | 52.0127°N 9.1230°W |
| Gortahile | 20 | 8 | Nordex | N90 | 2.5 | ABO Wind | 2011 | Laois | 52.8147°N 7.0620°W |
| Grouselodge | 15 | 6 | Nordex | N90 | 2.5 | ESB[6] | 2011 | Limerick | 52.5213°N 9.1028°W |
| Grousemount | 114 | 38 | Siemens Gamesa | SWT-3.4DD SWT-2.3-82 VS | 3.4 2.3 | ESB[6][20] | 2019 | Kerry | 51.8770°N 9.3310°W |
| Greenoge | 7.7 | 5 | Nordex | 4 N60 1 N90 | 1.3 2.5 | Greenoge Windfarm Ltd | 2005 | Carlow | 52.6589°N 6.7280°W |
| Gusta Gaoithe | 101 | 22 | Nordex | N149 | 4 & 5 | Invis Energy | 2023 | Galway | 53.3484°N 9.3138°W |
| Hollyford | 9 | 3 | Siemens Gamesa | SWT-3.0-101 | 3 | Energia[21] | 2014 | Tipeperary | 52.6465°N 8.0693°W |
| Inverin 1&2 (Knock South) | 3.3 | 5 | Vestas | V47 | 0.66 | 1999 | Galway | 53.2647°N 9.3697°W | |
| Kealkill (Dismantled) | 8.5 | 10 | Siemens Gamesa | V52 | 0.85 | 2006 | Cork | ||
| Kilathmoy | 23 | 7 | Nordex | N100 | 3.3 | Statkraft | 2020 | Limerick / Kerry | 52.4909°N 9.3325°W |
| Kilgarvan | 45 | 15 | Vestas | V90 | 3 | Ørsted[2] | 2007 | Kerry | 51.9341°N 9.3218°W |
| Kilgarvan II (Inchincoosh) | 32.5 | 13 | Nordex | N90 | 2.5 | Ørsted[2] | 2009 | Kerry | 51.9367°N 9.3486°W |
| Killaveenoge | 25 | 10 | Nordex | N90 | 2.5 | Invis Energy[4] | 2017 | Cork | |
| Killybegs | 13.8 | 6 | Enercon | E-70 | 2.3 | 2008 | Donegal | ||
| Kilronan | 5 | 10 | Vestas | V39 | 0.5 | 1998 | Roscommon | 54.4306°N 8.8420°W | |
| Kilvinane | 4.5 | 3 | Siemens Gamesa | G850 | 0.85 | 2006 | Cork | ||
| Kingsmountain | 25 | 10 | Nordex | N80 | 2.5 | SSE Renewables[22] | 2003 | Sligo | 54.1989°N 8.7930°W |
| Knockacummer | 100 | 40 | Nordex | N90 | 2.5 | Greencoat Renewables | 2013 | Cork | 52.2594°N 9.1110°W |
| Knockalough | 35.2 | 11 | Nordex | N90 | 2.5 | Invis Energy[4] | 2018 | Galway | 53.3066°N 9.2593°W |
| Knockastanna | 6 | 4 | GE | 1.5 | 1.5 | SSE Renewables[23] | 2009 | Limerick | |
| Knockawarriga 1 | 22.5 | 9 | Nordex | N90 | 2.5 | Ørsted[2] | 2008 | Limerick | |
| Knockawarriga 2 | 7.5 | 3 | 2.5 | Ørsted[2] | 2020 | Limerick | |||
| Knockduff | 65 | 26 | Nordex | N90 | 2.5 | Invis Energy[4] | 2016 | Cork | 52.0316°N 8.8300°W |
| Knocknagoum | 44.4 | 26 | Vestas | 4 V90 5 V90 6 V80 11 V52 | 2 3 2 0.85 | Invis Energy[4] | 2013 | Kerry | |
| Lacka Cross | 4.6 | 2 | Enercon | E-82 | 2.3 | 2009 | Kerry | ||
| Lackan | 6.9 | 3 | Enercon | E-70 | 2.3 | 2006 | Sligo | ||
| Lahanaght Hill | 4.25 | 5 | Vestas | V52 | 0.85 | 2006 | Cork | ||
| Largan Hill | 5.9 | 9 | Vestas | V47 | 0.66 | B9 | 2000 | Roscommon | 53.5645°N 8.3331°W |
| Leanamore | 18 | 9 | 2 | SSE Renewables[24] | 2018 | Kerry | |||
| Leitir Guingaid (LGLP) | 23 | 10 | Enercon | E82 | 2.3 | Invis Energy[4] | 2014 | Galway | |
| Leitir Peic (LGLP) | 21 | 7 | Enercon | E82 | 3 | Invis Energy[4] | 2014 | Galway | |
| Lenanavea | 4.5 | 5 | Enercon | E-44 | 0.9 | 2010 | Mayo | 53.9240°N 9.3505°W | |
| Lisheen 1 | 36 | 18 | Vestas | V90 | 2 | Ørsted[2] | 2009 | Tipperary | |
| Lisheen 2 | 24 | 12 | 2 | Ørsted[2] | 2013 | Tipperary | |||
| Lisheen 3 | 28.8 | 8 | 3.6 | Ørsted[2] | 2023 | Tipperary | |||
| Loughderryduff | 7.65 | 9 | Vestas | V52 | 0.85 | 2008 | Donegal | ||
| Lurganboy | 5.4 | 6 | Enercon | E-44 | 0.9 | 2008 | Donegal | ||
| Mace Upper | 2.4 | 3 | Enercon | E-48 | 0.8 | 2009 | Mayo | 53.7708°N 8.9697°W | |
| Magheramore | 43.2 | 16 | Nordex | N90 | 2.5 | Invis Energy[4] | 2019 | Mayo | |
| Meenachullalan | 13.8 | 6 | Enercon | E70 | 2.3 | 2008 | Donegal | ||
| Meenadreen | 3.4 | 4 | Vestas | V52 | 0.85 | B9 | 2003 | Donegal | |
| Meenadreen II | 95 | 38 | Nordex | N90 | 2.5 | Energia[25] | 2017 | Donegal | |
| Meenanilta | 2.55 | 3 | Vestas | V52 | 0.85 | 2004 | Donegal | ||
| Meenanilta 3 | 3.2 | 4 | Enercon | E-48 | 0.80 | 2004 | Donegal | ||
| Meentycat | 88.2 | 45 | Siemens Gamesa | 2 2.3 | SSE Renewables[26] | 2004 | Donegal | 54.8646°N 7.8516°W | |
| Meenwaun | 11 | 4 | GE | 2.75-120 | 2.75 | Stratkraft | 2018 | Offaly | |
| Midas | 32.24 | 23 | Vestas | V90 V52 | 3 0.85 | 2007 | Kerry | ||
| Mienvee | 0.9 | 1 | Vestas | V52 | 0.85 | Ørsted[2] | 2004 | Tipperary | |
| Milane Hill | 5.94 | 9 | Vestas | V47 | 0.66 | B9 | 2000 | Cork | |
| Monaincha | 36 | 15 | Nordex | N117 | 2.4 | Greencoat Renewables | 2014 | Tipperary | |
| Moanmore | 14 | 7 | Enercon | E-70 E4 | 2 | 2006 | Clare | ||
| Moneenatieve | 4.25 | 2 | Siemens Gamesa | G52 | 0.85 | B9 | 2005 | Leitrim | |
| Moneypoint | 17.25 | 5 | Vestas | V112 | 3.45 | ESB[6] | 2017 | Clare | |
| Mount Eagle | 6.8 | 8 | Vestas | V52 | 0.85 | ESB[6] | 2005 & 2008 | Kerry | |
| Mountlucas | 84 | 28 | Siemens Gamesa | 3.0DD-101 | 3 | Bord na Móna[5] | 2014 | Offaly | 53.2713°N 7.2360°W |
| Mountain Lodge | 34.5 | 23 | GE | 1.5s | 1.5 | ESBI | 2008 | Cavan | |
| Mountain Lodge II | 3 | 2 | GE | 1.5s | 1.5 | ESBI | 2009 | Cavan | |
| Mullananalt | 7.5 | 5 | GE | 1.5s | 1.5 | SSE Renewables[27] | 2007 | Monaghan | 54.0769°N 6.9094°W |
| Muingnaminnane | 14.8 | 18 | Enercon | E-44 E-48 | 0.9 0.8 | Saorgus | 2008 | Kerry | |
| Oweninny | 192 | 60 | Siemens Gamesa | SWT-3.2-113
N117/3600 |
3.2
3.6 |
ESB[6] Bord na Móna[28] | 2023 | Mayo | 54.1514°N 9.5495°W |
| Pallas | 40 | 20 | Enercon | E-70 | 2.0 | Pallas Wind Farms Ltd | 2008 | Kerry | |
| Raheen Barr | 18.7 | 22 | Vestas | V52 | 0.85 | 2003 | Mayo | 53.8993°N 9.3544°W | |
| Raheenleagh | 35.2 | 11 | Siemens Gamesa | 108-DD | 3.2 | ESB[6] Coillte | 2016 | Wicklow | |
| Rahora | 4 | 5 | Enercon | E-48 | 0.8 | 2008 | Cork | ||
| Raragh | 12 | 5 | Mainstream Renewable Power | 2019 | Cavan | 53.9259°N 6.8241°W | |||
| Rathcahill | 12.5 | 5 | 2.5 | SSE Renewables[29] | 2011 | Limerick | |||
| Rathmooney | 0.8 | 1 | Enercon | E-48 | 0.8 | 2009 | Dublin | 53.5499°N 6.1751°W | |
| Reenascreena | 4.0 | 5 | Enercon | E-48 | 0.8 | 2009 | Cork | ||
| Richfield | 27 | 18 | GE | 1.5s | 1.5 | SSE Renewables[30] | 2006 | Wexford | 52.2153°N 6.5910°W |
| Seltannaveeny | 4.6 | 2 | Enercon | E-70 | 2.3 | 2010 | Leitrim | ||
| Shannagh | 2.7 | 3 | Enercon | E-44 | 0.9 | 2009 | Donegal | ||
| Sheeragh | 4.6 | 2 | Enercon | E-70 | 2.3 | 2008 | Donegal | ||
| Sillahertane | 8.5 | 10 | 0.85 | Ørsted[2] | 2009 | Kerry | |||
| Skehanagh | 4.25 | 5 | Vestas | V52 | 0.85 | 2006 | Tipperary | ||
| Skrine | 4.6 | 2 | Enercon | E-70 | 2.3 | 2011 | Roscommon | ||
| Sliabh Bawn | 64 | 20 | Siemens Gamesa | SWT-3.2-101 | 3.2 | Bord na Móna[5] Coillte | 2017 | Roscommon | |
| Slievecallan West | 45 | 18 | Nordex | N90 | 2.5 | Invis Energy[4] | 2017 | Clare | |
| Smithstown | 8 | 4 | 2 | Ørsted[2] | 2013 | Kilkenny | |||
| Snugborough | 13.5 | 9 | GE | 1.5s | 1.5 | 2003 | Louth | ||
| Sonnagh Old | 7.65 | 9 | Vestas | V52 | 0.85 | 2004 | Galway | 53.1309°N 8.6391°W | |
| Sorne Hill 1 | 32 | 16 | Enercon | E-70 | 2 | Ørsted[2] | 2006 | Donegal | |
| Sorne Hill 2 | 6.9 | 3 | 2.3 | Ørsted[2] | 2009 | Donegal | |||
| Spion Kop | 1.2 | 2 | Vestas | V42 | 0.6 | 1997 | Leitrim | ||
| Slievereagh | 2.3 | 1 | Enercon | E-70 | 2.3 | 2009 | Limerick | ||
| Taurbeg | 25.3 | 11 | Siemens Gamesa | SWT-2.3 | 2.3 | B9 | 2006 | Cork | |
| Teevurcher | 10.25 | 5 | Senvion | MM82 | 2.05 | NTR | 2018 | Meath | 53.8857°N 6.9160°W |
| Tournafulla | 27 | 18 | GE | 1.5s | 1.5 | SSE Renewables[31] | 2007 | Limerick | |
| Tullahennel | 37 | 13 | GE | 26 MW Statkraft battery | 2019 | Kerry | |||
| Tullynahaw | 22 | 11 | Vestas | V80 | 2 | ESB[6] | 2010 | Roscommon | |
| Tullynamoyle | 9.2 | 4 | Enercon | E-70 | 2.3 | Tullynamoyle Wind Farm Limited | 2011 | Leitrim | |
| Tursillagh/1 | 15.8 | 23 | Vestas | V47 | 0.66 | Saorgus | 2000 | Kerry | 52.3144°N 9.5975°W |
| Tursillagh/2 | 6.8 | 8 | Vestas | V52 | 0.85 | Saorgus | 2004 | Kerry | 52.3144°N 9.5975°W |
| Woodhouse | 20 | 8 | Nordex | 5 N100 3 N90 | 2.5 | ESB[6] | 2015 | Waterford | |
Decommissioned
| Wind Farm | Capacity (MW) | No. | Turbine Vendor | Model | Size (MW) | Operator | Operational | County | Coordinates |
|---|---|---|---|---|---|---|---|---|---|
| Bellacorick | 6.45 | 21 | Nordtank | NTK300 | 0.3 | Bord na Móna[5] | 1992 — 2025[32] | Mayo | 54.1125°N 9.5870°W |
Offshore
| Wind Farm | Capacity (MW) | No. | Turbine Vendor | Model | Size (MW) | Operator | Completed | County | Coordinates |
|---|---|---|---|---|---|---|---|---|---|
| Arklow Bank | 25 | 7 | GE | 3.6xl | 3.6 | SSE Renewables | 2004 | Wicklow | 52.789°N 5.949°W |
Proposed
Onshore
| Wind Farm | Capacity (MW) | No. | Turbine Vendor | Model | Size (MW) | Developer | Proposed | County | Coordinates | Notes |
|---|---|---|---|---|---|---|---|---|---|---|
| Ballinagree[33] | 125.4 | Ørsted[2] FuturEnergy Ireland | 2026 | Cork | ||||||
| Cloghercor[34] | 125.4 | Ørsted[2] FuturEnergy Ireland | 2027 | Donegal | ||||||
| Coole[35] | 50 | 13 | Statkraft | Westmeath | ||||||
| Coom Green Energy Park[36] | 105.6 | Ørsted[2] FuturEnergy Ireland | 2027 | Cork | ||||||
| Cummennabuddoge[37] | 114 | 19 | SSE Renewables FuturEnergy Ireland | 2027 | Kerry | |||||
| Gortyrahilly[38] | 90 | 15 | SSE Renewables FuturEnergy Ireland | Cork | ||||||
| Inchamore[39] | 36 | 6 | SSE Renewables FuturEnergy Ireland | Cork | ||||||
| Mount Callan | 90 | 30 | 3.0 | West Clare Renewable Energy | Clare | [40] | ||||
| Shragh | 135 | 45 | Enercon | E82 | 3.0 | Clare Coastal Wind Power Ltd | Clare | [41] | ||
Offshore
| Wind Farm | Capacity (MW) | No. | Turbine Vendor | Model | Size (MW) | Developer | Proposed | County | Coordinates | Notes |
|---|---|---|---|---|---|---|---|---|---|---|
| Arklow Bank 2[42] | 800 | 36 - 60 | SSE Renewables | 2029 | Wicklow | 52.7907°N 5.9474°W | A Maritime Area Consent (MAC) which grants seabed rights was granted in December 2022. | |||
| Clarus Offshore Wind Farm[43] | 1,000 | 70 | 15 | DP Energy Iberdrola |
2030 | Clare Kerry |
52.6373°N 10.6801°W | |||
| Codling[44] | 1,300 | 100 | Fred Olsen Seawind EDF Renewables |
2025 - 2027 | Wicklow | 53.0680°N 5.7774°W | Winning bid in ORESS-1[45] | |||
| Dublin Array[46][47][48] | 600 - 900 | 45 - 61 | RWE Saorgus[49] |
2028 | Dublin | 53.2665°N 5.9718°W | Winning bid in ORESS-1 [45] | |||
| Inis Ealga Marine Energy Park[50] | 1,000 | 70 | DP Energy Iberdrola |
2030 | Cork Waterford |
51.5371°N 7.5504°W | ||||
| North Irish Sea Array[51] | 500 | 35 - 46 | Statkraft | Dublin Meath Louth |
53.6817°N 5.8111°W | Winning bid in ORESS-1 [45] | ||||
| Oriel Wind Farm[52] | 330[a] | 55 | Oriel Windfarm Ltd[b] | Louth | 53.9230°N 6.0596°W | According to a 2007 press release, the Oriel Wind Farm is proposed to be located in the Irish Sea near Clogherhead.[53] Ecological and geotechnical assessments were commenced in 2007,[54] and a planning application was submitted in mid-2024.[55][56] Planners requested "extra information" in August 2025, with developers given "until next January [2026] to respond".[57] Not included in ORESS-1. | ||||
| Shelmalere Offshore Wind Farm[58] | 1,000 | 70 | 15 | DP Energy Iberdrola |
2030 | Wicklow Wexford |
52.3892°N 6.0851°W | |||
| Skerd Rocks[59] | 450 | Fuinneamh Sceirde Teoranta | 2030 | Galway | 53.2665°N 9.9845°W | Winning bid in ORESS-1[45] | ||||
See also
Notes
- If completed as per the 2007 proposals, the Oriel Wind Farm would reportedly be capable of generating up to 330 megawatts of electricity.[53] The generated electricity could be fed into the Irish national electrical grid, with some of the output exported via interconnector to the UK and European energy markets.[53]
- The proposed development takes its name from the ancient Kingdom of Oriel.
