Wikiwand AI

Pyeongtaek–Yeongwol Expressway

Road in South Korea From Wikipedia, the free encyclopedia

The Pyeongtaek–Yeongwol Expressway (Korean: 평택영월고속도로), Route 40, is an expressway in South Korea, currently connecting Pyeongtaek, Gyeonggi Province to Jecheon, North Chungcheong Province with planned extensions to Jecheon, Samcheok.

Length127.5 km (79.2 mi)
Existed2002–present
Major intersections13
Quick facts Expressway No.40, Route information ...
Expressway No.40 shield}}
Expressway No.40
Pyeongtaek-Yeongwol Expressway
Route information
Length127.5 km (79.2 mi)
Existed2002–present
Major junctions
West endW.Pyeongtaek JC in Pyeongtaek, Gyeonggi-do
Seohaean Expressway
Pyeongtaek-Siheung Expressway
Major intersections13
East endJecheon JC in Jecheon, Chungcheongbuk-do
Jungang Expressway
Location
CountrySouth Korea
Highway system
Close
Hangul
평택영월고속도로
Hanja
平澤寧越高速道路
RRPyeongtaek Yeongwol gosok doro
MRP'yŏngt'aek Yŏngwŏl kosok toro
Quick facts Hangul, Hanja ...
Pyeongtaek–Yeongwol Expressway
Hangul
평택영월고속도로
Hanja
平澤寧越高速道路
RRPyeongtaek Yeongwol gosok doro
MRP'yŏngt'aek Yŏngwŏl kosok toro
Close

Originally assigned route number 24 during planning and initial construction, it was reassigned route number 40 in 2001 as part of the new South Korean expressway numbering scheme.[1] Construction began in December 1997.

The Pyeongtaek–Jecheon Expressway is part of South Korea's integrated tollway system. Motorists pay tolls only when leaving the system, not when transferring between expressways within the system.

Though the expressway's official name became "Pyeongtaek-Chungju Expressway" (평택충주고속도로) in 2002[2] and "Pyeongtaek-Jecheon Expressway" in 2008,[3]

History

  • 27 December 1997 : Construction Begin (W.Pyeongtaek JC – W.Anseong IC)
  • 7 December 1997 : Construction Begin (W.Anseong IC – Daeso JC)
  • 12 December 2002 : W.Pyeongtaek JC – W.Anseong IC segment opens to traffic.
  • 8 August 2007 : Construction Begin (Daeso JC – E.Chungju IC)
  • 11 November 2008 : S.Anseong IC – Daeso JC segment opens to traffic.
  • July 2009 : Construction Begin (E.Chungju IC – Jecheon JC / S.Jecheon IC)
  • 24 July 2009 : N.Jincheon IC opens to traffic.
  • 12 August 2013 : Daeso IC – Chungju JC segment opens to traffic.
  • 26 November 2013 : Geumwang-Kkotdongnae IC opens to traffic.
  • 31 October 2014 : Chungju JC – E.Chungju IC segment opens to traffic.
  • 30 June 2015 : E.Chungju IC – Jecheon JC / S.Jecheon IC segment opens to traffic.
  • 30 June 2018 : Pyeongtaek-Godeok IC opens to traffic.
  • 1 January 2025 : S. Anseong JC opens to traffic.

Compositions

Lanes

  • W.Anseong IC ~ Jecheon JC / S.Jecheon IC : 4
  • W.Pyeongtaek JC ~ Songtan IC, Anseong JC~W.Anseong IC : 6
  • Songtan IC ~ Anseong JC : 8

Length

  • 127.5 km

Limited Speed

  • high 100 km/h
  • Low 50 km/h

Line

  • File is made by Netizen named 'Nokcha-Hyanggi(녹차향기)' from 'Road Club'[4]

Exits and Junctions

  • IC: Interchange, JC: Junction, SA: Service Area, TG:Tollgate
More information No., Name ...
No.NameKorean nameHanja nameConnectionsNotesLocation
Connected directly with Pyeongtaek-Siheung Expressway
1 W.Pyeongtaek JC서평택분기점西平澤分岐點 Seohaean Expressway
Pyeongtaek-Siheung Expressway
Pyeongtaek,
Gyeonggi-do
2 Cheongbuk IC청북나들목靑北나들목 National Route 39
2–1 Pyeongtaek JC평택분기점平澤高德 Pyeongtaek-Hwaseong Expressway
SA Pyeongtaek SA평택휴게소平澤休憩所
2–2 Pyeongtaek Godeok평택고덕平澤分岐點Cheomdan-daero
National Route 38
3 Songtan IC송탄나들목松炭나들목Provincial Route 302
4 Anseong JC안성분기점安城分岐點 Gyeongbu Expressway( AH 1)Anseong,
Gyeonggi-do
5 W.Anseong IC서안성나들목西安城나들목 National Route 45
6 S.Anseong IC남안성나들목南安城나들목Provincial Route 23,
Provincial Route 82
SA Anseongmatchum SA안성맞춤휴게소安城맞춤休憩所
6-1 S.Anseong JC남안성분기점南安成分岐點Provincial Route 29
7 N.Jincheon IC북진천나들목北鎭川나들목 National Route 17Jincheon,
Chungcheongbuk-do
8 Daeso JC대소분기점大所分岐點 Jungbu ExpresswayEumseong,
Chungcheongbuk-do
9 Geumwang-Kkotdongne IC금왕꽃동네나들목金旺꽃동네나들목 National Route 21
SA Geumwang SA금왕휴게소金旺休憩所
10 Eumseong IC음성나들목陰城나들목 National Route 37,
Provincial Route 82
11 W.Chungju IC서충주나들목西忠州나들목 National Route 3Chungju,
Chungcheongbuk-do
12 Chungju JC충주분기점忠州分岐點 Jungbu Naeryuk Expressway
13 Noeun JC노은분기점老隱分岐點
N.Chungju IC북충주나들목北忠州나들목Provincial Route 82
14 E.Chungju IC동충주나들목東忠州나들목 National Route 19
National Route 38
SA Cheondeungsan SA천등산휴게소天登山休憩所
15 Jecheon JC제천분기점堤川分岐點 Jungang ExpresswayJecheon,
Chungcheongbuk-do
15–1 S.Jecheon IC남제천나들목南堤川나들목Provincial Route 82
Jecheon~Samcheok Section will start construction
Close

See also

References

Related Articles

Timelines

Top Qs

Fact Checks