Renkyō Line

From Wikipedia, the free encyclopedia

Native name連京線 (Renkyōsen, Liánjīngxiàn)
Statussee article
Renkyō Line
The "Asia Express" running on the Renkyō Line.
Overview
Native name連京線 (Renkyōsen, Liánjīngxiàn)
Statussee article
OwnerSouth Manchuria Railway
LocaleManchukuo, Kwantung Leased Territory
Termini
Service
TypeHeavy rail,
Regional rail
History
Opened1 September 1907 (see article)
Closed1955 (see article)
Technical
Line length701.4 km (435.8 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Old gauge1,520 mm (4 ft 11+2732 in) Russian gauge
Route map

Up arrow Gusai Line
Right arrow Futō Line
0.0
Dairen
Right arrow Nyūzen Line
4.0
Shakakō
8.9
Shūsuishi
Right arrow Ryojun Line (zh)
15.5
Nankanrei
23.2
Entō
27.7
Daibōshin
32.5
Kinshū
Left arrow Kinjō Line (zh)
46.4
Nijūridai
55.8
Sanjūrihō
66.1
Sekika
77.2
Furanten
94.1
Tenka
105.0
Gabōten
112.7
Ōka
124.1
Tokuriji
130.7
Shōshu
146.3
Bankarei
160.5
Kyokaton
168.0
Kyūsai
173.9
Rizan
Closed 1944
178.2
Ugakujō
188.2
Rokaton
199.0
Sakō
209.6
Kaihei
218.3
Hakuki
Closed 1944
228.3
Taiheizan
Right arrow Eikō Line
239.5
Daisekikyō
247.1
Funsui
255.1
Tazan
263
Tōōzan
271.6
Kaijō
280.7
Nantai
285.5
Kansenfu
Closed 1944
292.8
Tōkōshi
302.2
Senzan
307.3
Anzan
312.6
Rissan
Dairakuton
317.6
Reizan
321.7
Shuzan
Left arrow MNR Liaogong Connecting Line (zh)
332.3
Ryōyō
339.0
Taishika
Closed 1944
345.2
Chōdaishi
Left arrow Endai Colliery Line
354.6
Endai
362.9
Jūrika
371.7
Shaka
Left arrow Anpō Line
381.0
Sokaton
Left arrow Bushun Line (zh)
Right arrow MNR Fengshan Line
Left arrow Kon'yu Connecting Line
388.0
Konga
392.1
Minami-Hōten
Up arrow MNR Fengyu Connecting Line
396.6
Hōten
Right arrow MNR Huanggutun Connecting Line
398
Kita-Hōten
Left arrow MNR Fengji Line (zh)
409.7
Bunkanton
417.2
Kosekidai
422.1
Tōsanka
Closed 1944
429.3
Shinseiji
441.3
Shindaiji
448.7
Ransekizan
458.5
Tokushōdai
468.0
Tetsurei
478.7
Heichōho
482.6
Santōhō
Closed 1944
489.5
Chūko
501.5
Kaigen
Left arrow Kaifeng Railway (zh) Kaifeng Line
512.3
Kinkōji
522.4
Bachūka
532.6
Shōto
547.0
Sentō
557.6
Sōbyōji
566.7
Enkōji
573.2
Bōgyūshō
Left arrow MNR Shibai Line (zh)
585.9
Shihei
Right arrow MNR Heisei Line (zh)
592.4
Yōmokurin
601.5
Jūkahō
612.3
Kakukaten
623
Saika
631.5
Daiyuju
639.4
Kōshurei
650.2
Rubōshi
661.0
Tōkaton
671.2
Hankaton
692.7
Mōkaton
696.4
Minami-Shinkyō
Sensō
Kanseiji
Left arrow MNR Jingbai Line (zh)
701.4
Shinkyō
Left arrow MNR Jingtu Line (zh)
Down arrow MNR Jingbin Line

The Renkyō Line (連京線; in Chinese Lianjing Line, Liánjīng Xiàn) was the primary trunk line of the South Manchuria Railway from 1907 to 1945. The 701.4 km (435.8 mi) line ran between Dalian (Dairen) and Changchun (Xinjing).

The rights to manage this railway line was one of the main concessions that Japan acquired from Russia after the Russo-Japanese War. It played an important role in Japan's control of Manchuria, as a key connection in traffic between east Asia and Europe and as a means of conveying resources mined inland to the coast. The line's importance to freight traffic decreased somewhat after the opening of the shorter North Chosen Line via the Korean port of Rajin. It remained important to passenger traffic, however, as the "Asia Express" Dalian–Harbin limited express train, inaugurated in 1943, operated on this line between Dalian and Xinjing.[1] In August 1945, after Japan's defeat in the Pacific War, control of this and all other Mantetsu lines was passed to the Sino-Soviet China Changchun Railway.

The Renkyō Line began as the "South Manchuria Line" of the Russian-owned Chinese Eastern Railway running from Harbin to Port Arthur. Russia obtained the rights to build this line from Qing China; work began on 27 March 1898, and the 1,524 mm (5 ft 0 in) broad gauge line was opened to traffic in July 1903. Following Russia's defeat in the Russo-Japanese War, Japan gained the rights to operate the Harbin–Lüshun (Ryojun) section of the CER; the line was then converted from Russian broad gauge to the 1,067 mm (3 ft 6.0 in) Cape gauge used in Japan, to allow the use of rolling stock from Japan. The line was operated by the Imperial Japanese Army until it was taken over by the South Manchuria Railway Company (Mantetsu), established on 26 November 1906.[2] Mantetsu immediately set to regauging the line again, this time from Cape gauge to 1,435 mm (4 ft 8.5 in) standard gauge.[3]

Mantetsu created the Renkyō Line - then called the Manchu Main Line (満洲本線, Manshū Honsen, Mǎnzhōu Běnxiàn) - between Dairen and Mengjiatun (Mōkaton) on 1 April 1907, and extending it to Changchun (Chōshun) on 1 September 1907. Regauging of the entire line was completed in 1908, and on 27 May of that year through service between Dairen and Chōshun began on the all-standard gauge line. The Anpō Line, which connected to the Renkyō Line at Fengtian (Hōten) and was initially built as a 762 mm (2 ft 6.0 in) narrow-gauge line, was converted to standard gauge in November 1911, and from 15 June 1912 direct operation between Busan and Changchun began, via the Chosen Government Railway's Gyeongbu and Gyeongui Lines, the Anpō Line, and the Renkyō Line from Fengtian to Changchun. Double-tracking of the line from Sujiatun (Sokaton) to Dairen was completed on 27 October 1908, but it wasn't until 30 November 1918 that the section from Sujiatun to Fengtian was doubled. Between 1919 and 1926 the entire line was relaid with 100-lb/yd (50 kg/m) rail. The first colour light signals for automatic block signalling were installed on the Dalian–Jinzhou (Kinshū) and Fengtian–Sujiatun sections on 12 February 1924, and the entire section from Dalian to Fengtian received automatic blocking by 5 November 1933. On 15 July 1927, the line's name was changed from Manchu Main Line to Renchō Line (連長線; "Lianchang Line", Liáncháng Xiàn, in Chinese).

Using the Mukden Incident as a pretext to invade Manchuria, Japan created the puppet state of Manchukuo in March 1932;[4] Changchun was designated the capital city, and was renamed Xinjing (Shinkyō), and the line was renamed once again, becoming the Renkyō Line at that time. The "Asia Express", a world-class limited express train,[5] was introduced on 26 September 1934 between Dalian and Xinjing. The Manchukuo National Railway, which had taken over the remainder of the Chinese Eastern Railway, finished the conversion of the Jingbin Line from Xinjing to Harbin from broad gauge to standard gauge on 31 August 1935, and from 1 September the Asia Express service was extended to Harbin.

Japan's deteriorating situation in the Pacific War affected the line significantly. The Asia Express was suspended at the end of February 1943. The loss of air and sea superiority led to a drastic reduction in freight traffic to the port at Dalian, being instead redirected to Korean ports, via the North Chosen Line to the ports of Rajin and Unggi, and via the Anpō Line and the Chosen Government Railway to Busan. Between 1 August and 3 November 1944, the second track of the 180.3 km (112.0 mi) section between Sanshilibao (Sanjūrihō) and Dashiqiao (Daisekikyō) was removed, with the railways being used to upgrade Mantetsu's Anpō Line and the Manchukuo National Railway's Fengshan Line from Fengtian to Shanhaiguan.[6]

On 9 August 1945, the Soviet Union invaded Manchukuo, and on the 14th, the USSR and the Republic of China signed a treaty of friendship; the signing of the treaty was announced on the 27th. Under the terms of this treaty, a Sino-Soviet joint enterprise was formed, called the China Changchun Railway, to operate the Renkyō Line (known as the Changda Line after Xinjing reverted to its original name, Changchun) and a number of lines formerly owned by the Manchukuo National Railway, including the Xinjing–Harbin Jingbin Line and the Harbin–Manzhouli Binzhou Line. Mantetsu was formally dissolved on 30 September 1945.[7] The China Changchun Railway was transferred to China Railway in 1955, after which the Changda Line was split up, with the Dalian–Shenyang section becoming the Shenda Railway, and the Shenyang–Changchun section becoming part of the Beijing–Harbin Jingha Railway.

Services

Route

References

Related Articles

Wikiwand AI