111th station
Proposed rapid transit station on the Chicago "L" system
From Wikipedia, the free encyclopedia
111th[2][3] is a planned rapid transit station for the Red Line as part of the Red Line Extension. The station will open in 2030.[4] In January 2025, the CTA secured $1.9 billion for the project.[5][6] The station will be constructed adjacent to the Union Pacific Railroad in Chicago's Roseland neighborhood.
111th 11100S 400W | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| General information | |||||||||||||
| Location | 111th Street near Stewart Avenue Chicago, Illinois | ||||||||||||
| Coordinates | 41.69249°N 87.63250°W | ||||||||||||
| Owned by | Chicago Transit Authority | ||||||||||||
| Line | Dan Ryan branch | ||||||||||||
| Platforms | 1 | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Elevated | ||||||||||||
| History | |||||||||||||
| Opening | 2030[1] | ||||||||||||
| Future services | |||||||||||||
| |||||||||||||
| |||||||||||||
| |||||||||||||
