Wikiwand AI

Segambut Utara Komuter station

Train station in Kuala Lumpur, Malaysia From Wikipedia, the free encyclopedia

The Segambut Utara Komuter Station (formerly Segambut 2) is an infill commuter train station serving the suburbs of Segambut and Jinjang Selatan in Kuala Lumpur, Malaysia.[1][2] It is the 58th station to be part of the KTM network[3]. It is served by the Tanjung Malim–Port Klang Line of the KTM Komuter service, which forms part of the Klang Valley Integrated Transit System. The station includes facilities such as park and ride, disabled-friendly utilities, ticket kiosks, restrooms, elevators, and taxi stands.

Othernames
    • Malay: سݢامبوت اوتارا (Jawi)
    • Chinese: 泗岩沫北
    • Tamil: சிகாம்புட் உத்தாரா
Coordinates3.19200°N 101.65507°E / 3.19200; 101.65507
System KA05A  KTM Komuter Logo | Commuter rail station
Quick facts General information, Other names ...
Segambut Utara
Segambut Utara station entrance from Taman Sri Segambut
General information
Other names
    • Malay: سݢامبوت اوتارا (Jawi)
    • Chinese: 泗岩沫北
    • Tamil: சிகாம்புட் உத்தாரா
LocationSegambut, Kuala Lumpur, Malaysia.
Coordinates3.19200°N 101.65507°E / 3.19200; 101.65507
System KA05A  KTM Komuter Logo | Commuter rail station
OwnerRailway Assets Corporation, Keretapi Tanah Melayu Berhad
LineWest Coast Line
Platforms2 side platforms
Tracks2
ConnectionsPedestrian link bridge to United Point Mall from Platform 2
Construction
Structure type
Surface
ParkingAvailable
Other information
StatusIn operation
Station code KA05A 
History
Opened11 May 2026; 3 months ago (2026-05-11)
Services
Preceding station KTM Komuter Following station
Kepong Tanjung Malim–Port Klang Line Segambut
towards Port Klang
Location
Close
An elevated night view showing the illuminated station platforms and the surrounding residential landscape of Segambut.

History

Signboard of Segambut Utara station

The land for the station was first earmarked in 2016 to be constructed as a KTM station alongside the development of UOA Development Berhad's United Point Residence.[4]

In August 2023, the Railway Assets Corporation (RAC) and IDP Industrial Development Sdn Bhd signed an agreement with UOA Development Berhad to develop the new railway station along the KTM line, with UOA undertaking the construction to further integrate it with its existing development.[5] The signing ceremony was witnessed by Transport Minister Anthony Loke and Segambut MP Hannah Yeoh.[6][7]

Construction of the station was initially expected to be completed by November 2025.[8] The station connects directly to United Point via an overhead bridge and serves the surrounding neighborhoods of Taman Cuepacs, Taman Sri Segambut, Taman Segambut Aman, and Taman Sri Sinar.

On May 9, 2026, KTMB announced that the Segambut Utara KTM Station would officially begin operations on May 11, 2026[3]. As part of the Tanjung Malim–Pelabuhan Klang route, the station links passengers to major destinations and rail integration hubs, including Sungai Buloh, Kepong Sentral, Abdullah Hukum, and Subang Jaya, facilitating seamless connections to the MRT and LRT networks[3]. Passengers are also able to continue journeys to the Batu Caves–Pulau Sebang sector through interchange stations such as Kuala Lumpur and KL Sentral[3].

The station is expected to benefit more than 250,000 residents in Segambut, Jalan Ipoh, Kepong, and nearby areas by improving daily mobility in these densely populated neighborhoods[3]. Furthermore, KTMB emphasized that the station's opening supports efforts to reduce reliance on private vehicles and strengthens sustainable urban mobility throughout the Klang Valley[3].

References

Related Articles

Timelines

Top Qs

Fact Checks