Wikiwand AI

Somerset–Bridlewood station

Light rail station in Calgary, Alberta, Canada From Wikipedia, the free encyclopedia

Somerset–Bridlewood Station is a CTrain light rail station in the Calgary, Alberta community of Shawnessy. It is the current southern terminus of the Red Line. The station is one of two that opened on June 28, 2004 as part of the second phase of the South LRT Extension. The station is located on the exclusive LRT right of way (adjacent to CPR ROW), 16.9 km (10.5 mi) south of the City Hall interlocking along Shawville Gate. 913 parking spaces are included in the park-and-ride facility at the station. The station consists of a center-loading platform with at-grade crossings at both ends of the platform. Unlike a majority of CTrain stations, the platform was initially constructed to accommodate a four-car-length train.

Location17100 - 6 Street SW
Coordinates50°53′57″N 114°04′09″W
PlatformsCentre-loading platform
Quick facts General information, Location ...
Somerset – Bridlewood
General information
Location17100 - 6 Street SW
Coordinates50°53′57″N 114°04′09″W
OwnerCalgary Transit
PlatformsCentre-loading platform
Connections11 Southwest Loop
12 Southwest Loop
14 Bridlewood/Cranston
52 Evergreen/Somerset
75 Mahogany/Somerset
78 Sundance/Chaparral
102 Millrise/Sliverado
153 Copperfield
167 Walden/Legacy
194 Chaparral Valley/Wolf Willow
Okotoks On-It Regional Transit
Construction
Structure type
At-grade
Parking913 spaces
Accessibleyes
History
Opened2004; 22 years ago (2004)
Services
Preceding station Calgary Transit Following station
Shawnessy
toward Tuscany
Red Line Terminus
Location
Close

In 2007, the station registered an average of 13,000 boardings per weekday. This is up from a ridership of 10,100 from 2005.[1][2]

History

Commuter Rail Pilot

Somerset-Bridlewood Station was originally opened as 162nd Avenue Station in Spring 1996 as a temporary platform on the CP-Rail line as part of a pilot program to provide rail service to South Calgary. This commuter rail service operated a single Siemens RegioSprinter DMU[3] during peak rush hour periods only, to and from a temporary platform at Anderson Station.[4] The service only lasted five months, however, ridership proved popular and led to the priority decision to official extend the Red Line. The current station was constructed just south of the temporary platform and re-opened as Somerset-Bridlewood on June 28, 2004.[5]

Station Upgrades

A dedicated bus loop opened on June 27th, 2016, with bus stops and services being transferred from the original bus stops located on Shawville Gate.

Transit Connections

Bus connections to Somerset–Bridlewood station as of 31 August, 2026:

  • 11 - Southwest Loop (Clockwise)
  • 12 - Southwest Loop (Counterclockwise)
  • 14 - Bridlewood (West) / 14 - Cranston (East)
  • 52 - Evergreen/Fish Creek-Lacombe (North)
  • 75 - Mahogany (East)
  • 78 - Chaparral (South) / 78 - Sundance (North)
  • 102 - Millrise (North) / 102 - Silverado (South)
  • 153 - Copperfield (East)
  • 167 - Walden/Legacy (Counterclockwise)
  • 194 - Chaparral Valley/Wolf Willow (Clockwise)[6]
  • On-It Regional Transit - Okotoks Commuter / Somerset-Bridlewood LRT Station

Around the Station

Major Destinations

  • Shawnessy Towne Centre (shopping plaza)
  • Sundance South Health Centre
  • Sunpark Plaza
  • YMCA Shawnessy

Communities

Residential

Educational Institutions

Secondary Schools

Primary Schools

  • Father James Whelihan
  • Somerset Elementary

Major Streets

See also

References

Related Articles

Timelines

Top Qs

Fact Checks