Wikiwand AI

South Bank railway station (England)

Railway station in North Yorkshire, England From Wikipedia, the free encyclopedia

South Bank railway station serves the town of South Bank, Redcar and Cleveland in North Yorkshire, England and is on the Tees Valley Line, which runs between Bishop Auckland and Saltburn via Darlington. The station is situated 2 miles 40 chains (4 km) east of Middlesbrough (17 miles 40 chains (28 km) from Darlington) and is the first station before Redcar Central.[2] It is managed by Northern Trains, who operate all services.

Coordinates54°35′02″N 1°10′35″W
Quick facts General information, Location ...
South Bank
National Rail
General information
LocationSouth Bank, Redcar and Cleveland
England
Coordinates54°35′02″N 1°10′35″W
Grid referenceNZ532212
OwnerNetwork Rail
ManagerNorthern Trains
Platforms2
Tracks2
Other information
Station codeSBK[1]
ClassificationDfT category F2
History
Original company
North Eastern Railway
Pre-groupingNorth Eastern Railway
Post-grouping
Key dates
1 May 1882Opened
23 July 1984Resited a short distance to the west
Passengers
2020/21Decrease 11,296
2021/22Increase 30,198
2022/23Increase 33,636
2023/24Increase 38,302
2024/25Decrease 29,630
Location
Notes
Passenger statistics from the Office of Rail and Road
Close

History

The first station, initially named Eston, was opened in 1853 by the Middlesbrough and Redcar Railway. On 1 May 1882, this was replaced by an island platform by the North Eastern Railway, to serve the growing town of South Bank. Ironically, this was located on the same site as the present station. The original station survived intact, but was derelict for many years thereafter. It has since been demolished to allow the down (eastbound) line through the site to be realigned.[3]

In July 1984, British Rail resited the current station to the west, as the previous station was inconveniently sited in a heavily industrialised area, and in the way of a planned new dockside access road.[4]

The closure of the earlier station was closely followed by nearby Cargo Fleet on 22 January 1990,[5] and Grangetown on 25 November 1991.[6][7]

In October 2024, part of the station was closed due to the footbridge becoming unsafe for passengers, resulting in Saltburn-bound trains (eastbound) not stopping at South Bank.[8] Replacement buses have been laid on to accommodate passengers to and from the station.[9] Rather than remove the footbridge, it may simply be strengthened to save money.[10] Although due to be removed in August 2025, it is still in place as of July 2026.[11]

Tees Valley Metro

Transit diagram showcasing all discussed or mentioned ideas for the Tees Valley Metro.

Starting in 2006, South Bank was mentioned within the Tees Valley Metro scheme. This was a plan to upgrade the Tees Valley Line and sections of the Esk Valley Line and Durham Coast Line to provide a faster and more frequent service across the North East of England.[12] In the initial phases the services would have been heavy rail mostly along existing alignments with new additional infrastructure and rolling stock.[13] The later phase would have introduced tram-trains to allow street running and further heavy rail extensions.[14][15]

As part of the scheme, South Bank station would have received improved service to Darlington (1–2 to 4 trains per hour) and new rollingstock.[13]

However, due to a change in government in 2010 and the 2008 financial crisis, the project was ultimately shelved.[16] Several stations eventually got their improvements and there is a possibility of improved rollingstock and services in the future which may affect South Bank.[17]

Facilities

Station facilities here been improved as part of the Tees Valley Metro project. The package for this station included new fully lit waiting shelters, renewed station signage and the installation of CCTV. The long-line Public Address system (PA) has been renewed and upgraded with pre-recorded train announcements.[18] The station also has cycle storage facilities.[19]

Passenger volume

The station usage estimates of 2014 and 2015 also make note of the fact that the service improvement has increased the patronage substantially enough to be in the top ten most percentage increase of passenger numbers across the whole of the United Kingdom.[20][21]

More information 2004–05, 2005–06 ...
Passenger volume at _[22]
2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19 2019–20 2020–21 2021–22 2022–23 2023–24 2024–25
Entries and exits 1,057 1,942 1,590 1,706 1,530 1,118 2,510 2,654 4,704 12,544 22,860 21,846 23,926 21,424 23,282 27,624 11,296 30,198 33,636 38,302 29,630
Close

The statistics cover twelve month periods that start in April.

Services

More information Northern TrainsTees Valley Line, Bishop Auckland – Saltburnvia Darlington & Middlesbrough ...
Northern Trains
Tees Valley Line
Bishop Auckland – Saltburn
via Darlington & Middlesbrough
Bishop Auckland Weardale Railway
Shildon
Newton Aycliffe
Heighington
North Road
Darlington
Dinsdale
Allens West
Eaglescliffe
Thornaby
Middlesbrough
South Bank
Redcar Central
Redcar East
Longbeck
Marske
Saltburn
Close

As of the May 2026 timetable, the station is served by an hourly service between Saltburn and Bishop Auckland via Darlington.[23] There were formerly 2 trains per day leaving South Bank running direct to Newcastle via Durham.[24] All services are operated by Northern Trains.

More information Preceding station, National Rail ...
Preceding station National Rail National Rail Following station
Redcar Central   Northern Trains
Tees Valley Line
  Middlesbrough
  Historical railways  
Grangetown   London and North Eastern Railway
Tees Valley Line
  Cargo Fleet
Close

References

Related Articles

Timelines

Top Qs

Fact Checks