Wikiwand AI

Tōkyū Tamagawa Line

Commuter railway line in Tokyo, Japan From Wikipedia, the free encyclopedia

The Tōkyū Tamagawa Line (東急多摩川線, Tōkyū Tamagawa-sen) is a commuter railway line in Japan owned by private railway operator Tokyu Corporation. It runs between Tamagawa and Kamata in southwest Tokyo, entirely within Ōta ward. The operator's name, Tōkyū, is included in the formal name of this line.

Native name東急多摩川線
StatusIn service
LocaleTokyo
Quick facts Overview, Native name ...
Tōkyū Tamagawa Line
A Tamagawa Line 7000 series train, December 2021
Overview
Native name東急多摩川線
StatusIn service
OwnerTokyu Corporation
LocaleTokyo
Termini
Stations7
Color on map  Magenta (#ae0378)
Service
TypeCommuter rail
SystemTokyu Railways
Route numberTM
OperatorTokyu Corporation
History
Opened11 March 1923; 103 years ago (11 March 1923)
Technical
Line length5.6 km (3.5 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary
Operating speed80 km/h (50 mph)
Close

It was formed in 2000 from the western portion of the Tōkyū Mekama Line, which was then rerouted west of Tamagawa (former Tamagawa-en) station and renamed the Meguro Line.

This line should not be confused with the Tokyu Shin-Tamagawa Line (a section of track from Shibuya to Futako-tamagawa, (which has since been absorbed into the Tokyu Den-en-Toshi Line), or the Tamagawa Line tramway which preceded that (a former branch of which now forms the Setagaya Line).[citation needed]

Station list

All stations are located in Ota.

More information No., Station name ...
No. Station name Japanese Distance (km) Transfers
TM-01 Tamagawa 多摩川 0.0
TM-02 Numabe 沼部 0.9
TM-03 Unoki 鵜の木 1.9
TM-04 Shimomaruko 下丸子 2.6
TM-05 Musashi-nitta 武蔵新田 3.3
TM-06 Yaguchinowatashi 矢口渡 4.2
TM-07 Kamata 蒲田 5.6
Close

Rolling stock

All the rolling stock is shared with Tokyu Ikegami Line.

Current

Former

History

The Tokyu Tamagawa Line was formed on 6 August 2000 with the splitting of the former Tokyu Mekama Line.[1] Wanman driver-only operation also commenced on the line from this date.[1]

Future plans

Plans exist to extend the line eastward by approximately 800 m from the southern terminus of the line at Kamata to Keikyu Kamata Station on the Keikyu Main Line and Keikyu Airport Line, a project known as the Kama-Kama Line. This would provide an interchange between the lines, improving accessibility to Tokyo's Haneda Airport ahead of the 2020 Summer Olympics.[2] The plans did not materialize in time for the 2020 Summer Olympics. As of June 2022, Ōta Ward has agreed with the Tokyo Metropolitan Government to pay 70% of the project cost of ¥136 billion (2021) (equivalent to ¥147.89 billion or US$977.06 million in 2024)[3] while having the city government responsible for the remaining 30%.[4]

References

Related Articles

Timelines

Top Qs

Fact Checks