Wikiwand AI

Trams in Toruń

From Wikipedia, the free encyclopedia

The Toruń tram system is a tramway in Toruń, Poland that has been in operation since 1891. The system is operated by Miejski Zakład Komunikacji w Toruniu [pl] (MZK Toruń). There are 7 tramlines with a total line length of 54.3 kilometres (33.7 mi). The system operates on 28 kilometres (17 mi) of route on 1,000 mm (3 ft 3+38 in) metre gauge (narrow gauge) track. The entire rolling stock of the tram system numbers 67 trams, 22 newer Pesa Swing trams, and 45 older Konstal 805Na Trams. The entire tramline runs on double tracks and uses balloon loops.

LocaleToruń, Poland
OperatorsHavestadt & Contag
OperatorsHavestadt & Contag
Propulsion system
Horses
Quick facts Operation, Locale ...
Trams in Toruń
Pesa Swing in Toruń, 2015
Operation
LocaleToruń, Poland
Statistics
Horsecar era: 1891 (1891)–1899 (1899)
OperatorsHavestadt & Contag
Propulsion system
Horses
Electric trams era: 1899 (1899)–present
StatusOperational
Routes7
OperatorMZK Toruń
Track gauge1,000 mm (3 ft 3+38 in)
Propulsion system
Electricity
Electrification600 V DC parallel overhead lines
DepotUl. Henryka Sienkiewicza
Stock27x Konstal 805Na
18x Konstal 805NaND
22x Pesa Swing
28 km (17 mi)
Websitehttp://www.mzk.torun.pl/ www.mzk.torun.pl
Close

Today, the entire tram network is located on the northern side of the Vistula River, even though a large portion of the city extends southwards. Therefore, the tram system does not serve the cities main railway station.

History

Beginnings

Havestadt & Contag [de] opened the first horse-drawn tram line on 16 May 1891, running from Toruń Miasto [pl] to the neighborhood of Bydgoszczskie Przedmieście. The Tram Line was electrified in 1899, and in December 1901, the city of Toruń took over responsibility for the maintenance and expansion of the tram line. In 1902, the city opened a second tram line to the Mokre, and in 1907, a third line to Chełmiński Przedmieście. Further expansion of the line was proposed, but ultimately halted by the outbreak of World War I.[1]

Tram line shortly after electrification

Following the conclusion of the First World War, Operation of the tramway was taken over by the Second Polish Republic. Most of the rolling stock was in extremely poor condition, and all operations ceased for three months in 1921 to allow for repairs of the trams. In 1934, the fourth tram line began operation to Toruń Główny railway station, bringing trams to the south of the city. A 5th line to Jakubskie Przedmieście was completed in 1935.

World War II

During World War II, the city of Toruń was captured on 7 September 1939 by the advancing German Army. Shortly before the capture of the city, the Józef Piłsudski Bridge was destroyed by the Polish Army, thus cutting off the southern side of the city.

During the war, the tram network was run by the Germans and resumed normal operation. The Germans built a temporary wooden bridge that could carry buses to the other side of the Vistula River. These buses replaced the previous tram line across the river until a replacement bridge was completed in 1950. During the final months of World War II, all tram lines sustained significant damage. The tram network ceased operation for a few months until repairs could be made.

Destroyed Józef Piłsudski Bridge

1945-1991

In 1955, the line in Chełmiński Przedmieście began an extension to, first, the railway station of Pólnoncy, and then later, in 1958, the line was extended to Wrzosy.[2]

The 1970s and early 1980s were a huge time of expansion for the Tram Network. In 1970, the tramway was rerouted and no longer traveled through the center of the city. In 1971, an extension of the west terminus was moved to the current day Motoarena. In 1974, a tram line to Elana was completed. In 1979, The tram line on Grudzaidzka Street was completely rerouted onto the neighboring Przy Kaszowniku Street. This realighment was connected to the center of the city with the extension of the line from Dworzec Wshodnia to Petla Wshodnia in 1980.

In 1981, the line to Jakubskie Przedmieście was extended to Ślaskiego. Then in 1986, this line was further extended to Olimpijska, where the current eastern end of the Tram network ends. Also in 1986, a tram line was built along Kraszewkiego Street.

Konstal 805Na on now dismantled line to Polnoncy in 1990

During the late 1980s, The Expansion of tram lines was halted and replaced by new bus lines instead. Many lines were liquidated during this time, including the tram Line on the Jòzef Piłsudski Bridge [pl] to the Toruń Główny was closed and converted into exclusively a road bridge. Since then, Trams in Toruń have exclusively operated on the northern bank of the Vistula.[2] Other liquidations included the line to Wroszy, which was first reduced to Station of Toruń Pólnoncy in 1972. Later, in 1991, after the closure of the station, the line was completely dismantled.[1][2]

1992-Present

In 2011, the tram line on Wshodnia street was dismantled.[1]

A 1.7-kilometre (1.1 mi) extension was built to serve Nicolaus Copernicus University in Toruń. It was originally projected to open in 2013,[3] but the extension ultimately opened for service on 24 June 2014.[4]

Construction of the line extension to Osiedle Jar

The most recent extension, built to serve the Osiedle Jar housing estate in the north of the town, was inaugurated on 25 August 2023 and started normal passenger operations on 1 September 2023.[5]

Future

There are currently several plans to extend the City of Toruń tram network. These plans are in different stages of planning or consideration

Beginning in 2026, construction of a line extension from the MotoArena Toruń to Starotoruńskie Przedmieście is planned. A new tram depot is planned at the new eastern terminus, a bus depot is also planned.[6]

In 2025, there was a proposal by the mayor to link the southern side of the city to the tram network. This plan would involve building a new bridge over the vistula river. [7]

Currently, there are plans to link Olimpiska P&R to Elana, forming a complete loop of the system and extending Tram lines 2 and 4 to Olimpiska

There are also long-term plans to connect the Toruń Tram system to Bydgoszcz to facilitate a new connection between the metropolitan areas. The Tram Line was included in a 2030 plan, with a new bridge across the Vistula River near Bydgoszcz. This Tram line would have a travel time of 70 minutes. The line would serve to further link the Bydgoszcz–Toruń metropolitan area[8][9]

Tram lines

There are 7 regular tram lines in Toruń. There is also a Tourist/Event line and a Night-time line.

All lines regular except 7 on the network run every 30 minutes during weekends and off-peak hours, and every 20 minutes during peak hours. The peak hours are usually 7AM-8AM, and 1PM-4PM [10] The city does not run more trams during peak hours during times schools are not in session.

Line 7 runs every 30 minutes on Weekdays except when school is not in session, when it only runs during peak hours.

An 8th line occasionally serves large amounts of traffic at the MotoArena Toruń. The 8th line is also occasionally used as a tourist line running historical vehicles during the summer tourist season.

Line "9" is the city's night tram; it runs occasionally during tourist season weekends, as well as local festivities and holidays.[11]

More information Daily, Weekdays only ...
Daily all day1, 2, 3, 4, 5, 6, 7
Weekdays only all dayN/A
peak hours onlyN/A
Replacement Line Temporary8
Night Tram seasonal during summer weekends, and holidays/local festivies9
Close

Operational

More information Line, Map ...
Line Map Route Number of stops Circuit Time Frequency
1 UniwersytetOlimpiska P&R
via Toruń Miasto PKP,
2535Weekdays off-peak 30
Weekdays peak 20
Weekends 30
Holidays 45
2 MotoarenaElana
via Dworczec Wschodni
2030Weekdays off-peak 30
Weekdays peak 20
Weekends 30
Holidays 45
3 MotoarenaHeweliusza
via Plac Rapackiego
2634 Weekdays off-peak 30
Weekdays peak 20
Weekends 30
Holidays 45
4 UniwersytetElana
via Dworczec Wschodni
2130Weekdays off-peak 30
Weekdays peak 20
Weekends 30
Holidays 45
5 MotoarenaOlimpijska P&R
via Toruń Miasto
2434Weekdays off-peak 30
Weekdays peak 20
Weekends 30
Holidays 45
6 HewelisuzaOlimpijska P&R
via Toruń Miasto
2840Weekdays off-peak 30
Weekdays peak 20
Weekends 30
Holidays 45
7 UniwersytetWshodnia
via Plac Rapackiego
223430
Close

Suspended/Not Running

More information Line, Map ...
Line Map Route Number of stops Circuit Time Frequency
8 MotoarenaAleja Solidarności
 REPLACEMENT TRAM 
8/111215
9 UniwersytetAleja Solidarności
 SEASONAL NIGHT TRAM 
1113Piernikaliami 20-30
Juwenalia 20-30
Close

Rolling stock

Current Operational Fleet

More information Type, Production ...
Type Production Number Low-floor
Konstal 805Na 1980 27 No
Konstal 805NaND

(modernised 805Na)

2007 18[12] No
122NbT Swing 2014 6[13] Yes
121NbT Swing 2015 6[14] Yes
122NbTDuo Swing 2015 5[15] Yes
122NaT Swing 2021-2022 5[16] Yes
Total 67 32%
Close

Historical fleet

More information Type, Production ...
Type Production Restored
Konstal 5N 1960 [17] 1993 [17]
Close

Technical Fleet

More information Type, Production ...
Type Production
Konstal 5N 1960
Close

Infrastructure

Termini

Current

More information Name, Schematic ...
Name Schematic Opening Year Tracks Lines Notes
Motoarena 1971 3 [Note 1] 2, 3, 5 Also occasionally used by Line 8 (Event Tram)
Wcshodnia 1974 2 7 Southern Tracks Abandoned
Elana 1974 1 2, 4 Rebuilt in 2012
Olimpska Park&Ride 1984 5 + 2 [Note 1] 1, 5, 6
Uniwerstet 2014 2 1, 4, 7 Also occasionally used by Line 9 (Night Tram)
Heweliusza 2023 2 3, 6
Close

Former

More information Name, Schematic ...
Name Schematic Opening Year Closing Date Tracks Lines (Formerly) Closing Reason
Dworzec Główny 1954 1984 1 4, 6 Lidquidation of Line to Toruń Główny in order to convert bridge to exclusively road traffic.
Wroszy 1958 1972 1 3 Lidquidation of Line.
Toruń Północny 1955 1991 1 3 Closure of Toruń Północny [pl] Station. Whole Line was Liquidated.
Ślaskiego 1981 1988 2 [Note 1] 1, 4, 5 Extension of line to Olimpska P&R
Wshodnia 1917 1976 1 Realingment of Track
Close

Bus Exchange Stops

More information Name, Schematic ...
Name Schematic Opening Year Lines Notes
Plac Rapackiego 2020 3, 5, 7, 10, 11, 12, 13, 14, 20, 21, 22, 27, 32, 131, 151, 152 Track Originally Built in 1927
Aleja Solidarności 2014 1, 3, 6, 7, 10, 12, 13, 14, 20, 21, 22, 27, 30, 31, 32, 38, 111, 112, 115, 141, 151, 152 Previously Dismantled in the 1980s, Rebuilt in 2014 with University Extension.
Długa 2023 3, 6, 16, 34
Close

Depot

Tram Depot on Ul. Henryka Sienkiewicza

The current tram depot is located on Henryka Sienkiewicza Street. It is currently the only tram depot on the entire network.

As part of an extension project west of the MotoArena, a new tram/bus depot will be built.

Maps

References

Related Articles