Uttar Pradesh Rajya Vidyut Utpadan Nigam

Electricity generation company in Uattar Pradesh From Wikipedia, the free encyclopedia

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) is a wholly owned state thermal power utility with present generating capacity of 8114 MW, operating 6 thermal power stations within Uttar Pradesh.

Native name
उत्तर प्रदेश राज्य विद्युत उत्पादन निगम लिमिटेड
Company typePublic
Founded25 August 1980; 45 years ago (1980-08-25)
Quick facts Native name, Company type ...
Uttar Pradesh Rajya Vidyut Utpadan Nigam
Native name
उत्तर प्रदेश राज्य विद्युत उत्पादन निगम लिमिटेड
Company typePublic
IndustryElectric power
Founded25 August 1980; 45 years ago (1980-08-25)
Headquarters,
OwnerGovernment of Uttar Pradesh
Websiteuprvunl.org
Close

UPRVUNL was constituted on dated 25 August 1980 under the Companies' Act 1956 for construction of new thermal power projects in the state sector. On 14 January 2000, in accordance to U.P. State Electricity Reforms Acts 1999 and operation of U.P. Electricity Reforms Transfer Scheme 2000, U.P. State Electricity Board (U.P.S.E.B.), till then responsible for generation, transmission and distribution of power within the state of Uttar Pradesh, was unbundled and operations of the state sector thermal power stations were handed over to UPRVUNL. Unchahar Thermal Power Station - 420 MW (2×210) & Tanda Thermal Power Station 440 MW (4×110) were transferred to NTPC in 1992 and 2000 respectively before unbundling of U.P. State Electricity Board (UPSEB) into

  1. Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL)
  2. Uttar Pradesh Power Corporation Limited (UPPCL)
  3. UP Power Transmission Corporation Limited (UPPTCL)
  4. UP Jal Vidyut Nigam Limited (UPJVNL)

Power plants

Present Installations- (9380MW)

At present, as of 2026 UPRVUNL is looking after generations of power of six thermal power plants located in different parts of Uttar Pradesh, with a total installed generation capacity of 6134 MW.

After the merger with Up Jalvidyut Nigam in 2024 the total installed capacity raised by additional 560 MW.

Future Expansions

Construction Stage- (8865 MW)

Proposed - (1320 MW)

Past Transitions (1990 MW)

Erstwhile Uttar Pradesh State Electricity Board (UPSEB) transferred its thermal power stations among others to NTPC Limited against payment overdue. These power stations are;

Human resources

As on 01.03.2022 UPRVUNL has 1533 executives and 4659 non-executives on its roll.[7]