Type 092 submarine

Nuclear-powered ballistic missile submarine class From Wikipedia, the free encyclopedia

The Type 092 (Chinese designation: 09-II; NATO reporting name: Xia class) submarine is the first nuclear-powered ballistic missile submarine (SSBN) deployed by the People's Liberation Army Navy Submarine Force (PLANSF). Boat 406 was the only member of the class.

NameType 092
BuildersBohai Shipyard, Huludao
Preceded byType 031
Quick facts Class overview, Name ...
Profile of the Type 092
Class overview
NameType 092
BuildersBohai Shipyard, Huludao
Operators People's Liberation Army Navy
Preceded byType 031
Succeeded byType 094
Built1981
In commission1983
Completed1
Retired1
History
China
NameNo. 406
BuilderBohai Shipyard, Huludao
Laid downSeptember 1971
LaunchedApril 1981[1][2]
CommissionedAugust 1983
DecommissionedBy 2015
Home portJianggezhuang Naval Base
IdentificationPennant number: 406
StatusRetired
General characteristics
TypeNuclear-powered ballistic missile submarine
Length120 m (393 ft 8 in)
Beam10 m (32 ft 10 in)
Draught8 m (26 ft 3 in)
Propulsion1 × pressurized-water nuclear reactor, 58MW; 2 × steam turbines; 1 shaft.
Speed22 knots (41 km/h; 25 mph)
RangeUnlimited
Test depth300 m (984 ft 3 in)
Complement100
Armament
  • 6 × 533 mm torpedo tubes
  • 12 × JL-1A SLBMs
Close

Description

The Type 092 was designed by Peng Shilu and Huang Xuhua,[3] essentially a Type 091 submarine with an added section[2] for twelve[4] JL-1 submarine-launched ballistic missiles. The missile launchers used a gas-steam generator; the generator was tested on land and on a Chinese Golf-class submarine.[2] The output of the powerplant was increased during development; the changes were incorporated into the later Type 091 boats.[5]

The Type 091 and 092 had similar problems. It was slow, noisy, and had powerplant reliability issues. The limitations of the submarine and the missile made their operational status[6] and deterrence value questionable.[3]

History

The only example of the class, boat 406, was laid down at the Bohai Shipyard[1] in September 1971. Construction was disrupted by the Cultural Revolution. It launched in April 1981 and commissioned in August 1983;[2] Janes Fighting Ships (JFS) 2015-2016 reported an in-service year of 1987.[1]

The boat was based at the Jianggezhuang Naval Base and rarely went to sea.[7] Reportedly, the boat never conducted a strategic patrol outside of China's regional waters.[8]

The boat made its first submerged test launches of the JL-1 in September 1985; the three launches were successful although the missiles failed in flight. Successful launches and flights occurred two years later.[2]

The boat was first officially acknowledged in public during on 23 April 2009, the 60th anniversary of the PLAN.[9]

The boat was no longer listed in JFS 2015–2016.[10]

References

Sources

Related Articles

Wikiwand AI