Wikiwand AI

Zhen'an station (Foshan Metro)

Foshan Metro Line 3 station From Wikipedia, the free encyclopedia

Zhen'an station (simplified Chinese: 镇安站; traditional Chinese: 鎮安站; pinyin: Zhèn'ān Zhàn; Cantonese Yale: Jan'ōn Jaahm) is a station on Line 3 of Foshan Metro, located in Foshan's Chancheng District.[1] It opened on 28 December 2022,[2][3] and was the northern terminus of the line until it extended north to Zhongshan Park on 23 August 2024.[4]

Hanyu PinyinZhèn'ān Zhàn
Hanyu PinyinZhèn'ān Zhàn
Quick facts Chinese name, Simplified Chinese ...
Zhen'an

镇安
Foshan Metro
Platform
Chinese name
Simplified Chinese镇安站
Traditional Chinese鎮安站
Transcriptions
Standard Mandarin
Hanyu PinyinZhèn'ān Zhàn
Yue: Cantonese
Yale RomanizationJan'ōn Jaahm
JyutpingZan3on1 Zaam6
General information
LocationSouth side of the intersection of Nanhai Boulevard (南海大道) and Tongji East Road (同济东路), Zumiao Subdistrict
Chancheng District, Foshan, Guangdong
China
Coordinates23°1′7.57″N 113°8′20.08″E
OperatorFoshan Metro Operation Co., Ltd.
Line     Line 3
Platforms2 (1 island platform)
Tracks2
Construction
Structure type
Underground
AccessibleYes
Other information
Station codeF323
History
Opened28 December 2022 (3 years ago) (2022-12-28)
Services
Preceding station Foshan Metro Following station
Guicheng Line 3 Jihua Liulu
Location
Close

A double storage line is set up at the north end of the station, which can be used for daily train storage, and can also be used for turnback of all trains from the initial section to before the opening of the southern section of the rear section.[5]

Concourse

Station layout

The station has an island platform under Nanhai Boulevard.[6]

G - Exits B-E
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 1 arrow for L  3  towards Foshan University (Guicheng)
Island platform, doors will open on the left
Platform 2  3  towards Shunde College Railway Station (Jihua Liulu) arrow for R

Entrances/exits

The station has 4 points of entry/exit, located on the north and south sides of Nanhai Boulevard. Exits B and E are equipped with elevators.[1]

  • B: Nanhai Boulevard Middle Wheelchair user access
  • C: Tongji East Road
  • D: Tongji East Road
  • E: Tongji East Road Wheelchair user access

History

The station began enclosure construction on 9 August 2017,[7] and the second phase of enclosure construction on 25 August 2018.[8]

On 10 November 2020, the main structure was successfully topped out.[5] On 13 April 2021, the double line tunnel between this station and Jihua Liulu broke through.[9] On 24 November 2021, the right line tunnel from this station to Guicheng successfully broke through.[10] On 28 December 2022, the station opened with the opening of the initial section of Line 3 and served as its northern terminus. On 23 August 2024, after the opening of the southern section of the rear section of Line 3 (Zhen'an-Zhongshan Park), the station became an intermediate station of Line 3.

Role as terminus of Line 3 initial section

Due to the turnback setup, the first section of Line 3 can only use this station as the northern terminus, and it cannot continue to Guicheng station, which is only one stop away from this station and provides transfer to the Guangfo line, making the Chancheng section of Line 3 a "broken road" at this station. Therefore, if the station of the Chancheng section of Line 3 has to provide transfers to the stations along the Chancheng, Nanhai and Guangzhou sections of the Guangfo line, it is necessary to detour to Dongping station for transfer or pass through Wanhua and Kuiqi Lu stations on Line 2. Although the shuttle bus M1008 connecting this station to Guicheng station was created to make up for this problem, the inconvenience caused by this was still criticized by passengers. However, Guicheng station was not in a condition for train turnback, and Foshan Metro did not plan to open Line 3 to Guicheng station separately at that time.

Since 23 August 2024, with the opening of the section under construction of Line 3, this station will be able to lead into Guicheng station, and the "broken road" that has lasted for more than a year and a half has been opened. From that day on, the shuttle bus M1008 was also suspended.

References

Related Articles

Timelines

Top Qs

Fact Checks