A10 motorway (Romania)

Motorway in Romania From Wikipedia, the free encyclopedia

The A10 motorway (Romanian: Autostrada A10), also known as the Sebeș–Turda Motorway (Romanian: Autostrada Sebeș–Turda), is a motorway in the central-western part of Romania, connecting the A1 and A3 motorways, between the cities of Sebeș and Turda, also providing access to Alba Iulia and Aiud. It is 70 km long, with a total cost of 420 million euro, which is financed in proportion of 85% from the European Union funds, the rest of 15% being insured from the state budget. The motorway's construction was divided into four lots:[1] works for lots 3 and 4 began on 20 May 2014, whereas for the other two lots began in 2015.[2]

Length70 km (43 mi)
Existed2018–present
Southend A 1 near Sebeș
Northend A 3 near Turda
Quick facts motorway, Route information ...
A10 motorway shield}}
A10 motorway
Map of the A10 motorway, as of July 2018
Autostrada A 10 (2).jpg
Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length70 km (43 mi)
Existed2018–present
Major junctions
South end A 1 near Sebeș
North end A 3 near Turda
Location
CountryRomania
CountiesAlba, Cluj
Major citiesAlba Iulia, Aiud
Highway system
← A 9→ A 11
Close

Since 2021, it has been operational on its entire length. Near Oiejdea, however, initially it was only operational on two lanes, due to a landslide that occurred in the area that was still not resolved.[3] The motorway became fully operational on 19 November 2022.[4]

Sections

The construction was split into the following four segments, the contracts for which have been awarded in December 2013:[5]

  • Lot 1: 17.0 km, from the highway entrance near the interchange with the A1 motorway at Sebeș to Alba Iulia North interchange, awarded to the building consortium of Impresa Pizzarotti & Pomponio Construcții SRL, for a cost of 541,739,137 lei. Includes a complex node with A1.[6]
  • Lot 2: 24.3 km, from Alba Iulia North interchange to Aiud, awarded to building consortium of Aktor SA & Euroconstruct Trading '98 SRL for a cost of 549,332,493 lei.
  • Lot 3: 12.5 km, from Aiud to the Decea interchange, awarded to the building consortium of Tirrena Scavi SpA and Società Italiana per Condotte d'Acqua, for a cost of 420,511,921 lei.
  • Lot 4: 16.3 km, from the Decea interchange to the interchange with the A3 motorway near Turda, awarded to Porr Construct SRL and Porr Bau GmbH, for a cost of 470,004,894 lei.

Openings timeline

  • The Aiud – Turda segment (26.4 km) opened to traffic on 30 July 2018.[7][8]
  • The Sebeș – Alba Iulia North segment (14.8 km) opened to traffic on 3 December 2020.[9]
  • The Alba Iulia North – Aiud segment (28.8 km) opened to traffic on 30 November 2021.[3]
The A10 motorway near Unirea, October 2018

Exit list

More information County, Location ...
CountyLocationkmmiDestinationsNotes
AlbaSebeș00.0 A 1 – Deva, Timișoara, Sibiu, BucharestSouthern terminus
00.0 DN1 – Sebeș North
Alba Iulia42.5Short-term parking
85.0 DN1 – Alba Iulia South
1711 DN1 – Alba Iulia North
Teiuș2314Short-term parking
2616 DN14B – Teiuș, Blaj
Aiud4427 DN1 – Aiud
4629Short-term parking
Decea5333 DN1 – Decea, Unirea, Ocna Mureș
Unirea5735U-turn exitNorthbound only
6037Short-term parking
6138U-turn exitNorthbound only
Centru de Întreținere și Coordonare (C.I.C)
ClujMihai Viteazu7043 DN1 – Turda
7043 A 3 – Târgu Mureș, Brașov, Cluj-Napoca, BorșNorthern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened
Close

See also

References

Related Articles

Timelines

Top Qs

Fact Checks