Abuja Thermal Power Station
From Wikipedia, the free encyclopedia
| Abuja Thermal Power Station | |
|---|---|
![]() | |
| Country | Nigeria |
| Location | Abuja |
| Coordinates | 08°59′13″N 07°03′38″E / 8.98694°N 7.06056°E |
| Status | Under construction |
| Thermal power station | |
| Primary fuel | Natural gas |
| Power generation | |
| Nameplate capacity | 1,350 MW |
Abuja Thermal Power Station is a 1,350 MW natural gas-fired thermal power plant under construction in Nigeria. The project is an NNPC (Nigerian National Petroleum Corporation) flagship power projects along the AKK corridor. This is part of the 3,600MW cumulative power capacity which includes Kaduna IPP (900MW) and Kano IPP (1,350MW). The project will be delivered in collaboration with General Electric (GE) as the Original Equipment Manufacturer (OEM) and China Machinery and Engineering Corporation (CMEC) as the Engineering, Procurement and Construction (EPC) Contractor.
Overview
Abuja Thermal Power Station is a collaborative effort between (a) the Nigerian National Petroleum Corporation (NNPC), which will supply the natural gas (b) the government of the United States, a donor to the project (c) General Electric Nigeria (GE Nigeria), who will supply the gas turbines and (d) a yet to be identified independent power producer. When completed, the power station is expected to produce 1,350 megawatts of electricity, which will be connected to the Nigerian national electricity grid.[1] It's electricity will be sold to NBET and it is projected to generate $700-$800 million annually within the first 10yrs of operation, which would be about $8 billion in 10 years.
Development
Natural gas to this power project is expected to be delivered via the Ajaokuta–Kaduna–Kano Natural Gas Pipeline, which was under development, as of 2020. The pipeline and the power station are intended to take advantage of the abundant natural gas sources in Nigeria's upstream petroleum operations, and use that gas for industrial and domestic purposes, to spur economic development.[1][3]
In February 2020, the United States Trade and Development Agency (USTDA), donated US$1.16 million towards the development of this power station.[4]