The Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad, Gandhinagar, and GIFT City in the state of Gujarat in India. Currently the network is 67.56 km (41.980 mi) long and has 54 operational stations.[6]

Native nameઅમદાવાદ મેટ્રો
Transit typeRapid transit
Quick facts Overview, Native name ...
Ahmedabad Metro
A Red Line train of Ahmedabad Metro
A Red Line train of Ahmedabad Metro
Overview
Native nameઅમદાવાદ મેટ્રો
OwnerGujarat Metro Rail Corporation Limited
Area servedAhmedabad
Gandhinagar
GIFT City
Transit typeRapid transit
Number of lines4[1]
Line number
Number of stations54
Annual ridership5.1 crore (51 million) (2025-26)[2]
Chief executiveKatikithala Srinivas (Chairman)
HeadquartersBlock No.1, First Floor, Karmayogi Bhavan, Sector 10/A, Gandhinagar-382010[3]
WebsiteGujarat Metro
Operation
Began operation4 March 2019; 7 years ago (2019-03-04)
Operator(s)Gujarat Metro Rail Corporation Limited
CharacterUnderground and elevated
Rolling stockHyundai Rotem
Train length3 coaches
Technical
System length67.56 km (41.98 mi)[4]
No. of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge[5]
Electrification750 V DC Third rail
Average speed33 km/h (21 mph)
Top speed80 km/h (50 mph)
Route map

Close
Ahmedabad Metro
Mahatma Mandir
Sector-24 (Gandhinagar)
Sector-16 (Gandhinagar)
Juna Sachivalaya
Akshardham
Sachivalaya
Sector-10A (Gandhinagar)
Sector-1 (Gandhinagar)
Infocity
Indroda Depot
Dholakuva Circle
Randesan
GIFT City
Raysan
PDEU
GNLU
Koba Gam
Juna Koba
Koba Circle
Narmada Canal
Tapovan Circle
Vishwakarma College
Koteshwar Road
Motera Stadium
Thaltej Gam
Sabarmati
Thaltej
AEC
Doordarshan Kendra
Sabarmati Railway Station
Gurukul Road
Ranip
Gujarat University
Vadaj
Commerce Six Road
Vijay Nagar
SP Stadium
Usmanpura
Old High Court
Gandhigram
Paldi
Shahpur
Shreyas
Gheekanta
Rajiv Nagar
Kalupur Railway Station
Jivraj Park
Kankaria East
APMC
Apparel Park Depot
Gyaspur Depot
Apparel Park
Amraiwadi
Rabari Colony
Vastral
Nirant Cross Road
Vastral Gam

The Gujarat Metro Rail Corporation Limited was established in February 2010 and the 40.03 km (24.873 mi) Phase 1 of the project was approved in October 2013 with two corridors, North–South and East–West. Construction started on 14 March 2015. A 6.5 km (4.039 mi) section of the East–West corridor was inaugurated on 4 March 2019. The rest of Phase 1 was inaugurated on 30 September 2022, except the Thaltej Gam end and three stations.[7] Phase 1 was completed in December 2024, except Sabarmati Railway Station metro station.

Phase 2 was approved in February 2019 and construction started in January 2021. The Violet Line and part of the Yellow line opened in September 2024. The rest of the Yellow Line opened gradually, concluding with the completion of Phase 2 in January 2026.

Background

Prime Minister Narendra Modi inaugurating the metro on 30 September 2022.

In 2003, Gujarat Infrastructure Development Board carried out a study for urban transport between Gandhinagar and Ahmedabad. It also carried out the detailed project report through Delhi Metro Rail Corporation and RITES and submitted it in June 2005 and received Central Government's approval in the same year.[8][9] Following the estimated cost of ₹4,295 crore (US$450 million) and the study of the viability of the project, it was abandoned in 2005 to give priority to the Ahmedabad BRTS and suburban railway projects. In 2008, considering the future developments in and around Ahmedabad and Gandhinagar, the project was revived and new corridors designed to make the project viable.[10][11]

The special purpose vehicle company, Metro Link Express for Gandhinagar and Ahmedabad Company Ltd, later renamed Gujarat Metro Rail Corporation Limited (GMRC) in 2018, was established by Government of Gujarat on 4 February 2010 with ₹202 crore (US$21 million). Later in 2014, it was decided that the Central Government will own 50% of the company.[12][13]

Construction

Phase 1

The 40.03 km (24.873 mi) Phase 1 of the project was approved in October 2013 with two corridors, North–South and East–West.[7] On 19 October 2014, Union Cabinet of India approved ₹10,773 crore (US$1.1 billion) for Phase 1.[13] The Central Government approved the use of unused Western Railways land along the Botad-Sabarmati meter gauge line in November 2014.[14] The original plan of Metro along Ashram Road was tweaked and the track was moved westward. The new plan added the cost of ₹600 crore (US$62 million) and two more stations. The new plan helped by causing fewer problems in land acquisition and less congestion on Ashram Road. In 2015 budget of Gujarat, ₹611 crore (US$63 million) was further allocated for the metro. The ground breaking ceremony was held on 14 March 2015 for the construction of the 6.5 km (4.039 mi) Vastral–Apparel Park stretch of the East–West corridor (Blue Line) in the presence of the then Gujarat Chief Minister, Anandiben Patel. The ground-breaking ceremony for the North–South Corridor (Red Line) was held on 17 January 2016 in the presence of the then Gujarat CM Anandiben Patel. The work started in March 2016.[15][16][17][18] The Indian Railways permitted the construction of the North–South corridor stretch on its land in June 2016.[19] The Japan International Cooperation Agency (JICA) agreed to fund ₹5,968 crore (US$620 million) for Phase 1 of the project in November 2015 and the first tranche of ₹4,456 crore (US$460 million) was released in 2016.[20]

The trial runs were carried out in February 2019 on the 6.5 km (4.039 mi) Vastral–Apparel Park section of the Blue Line.[21][22] The section was inaugurated on 4 March 2019 by Indian Prime Minister Narendra Modi.[23][24] It was opened to the public on 6 March 2019.[25] Except the Thaltej–Thaltej Gam section and three metro stations (Kankaria East, Thaltej Gam and Sabarmati Railway),[26][27][28][29] the rest of Phase 1 was inaugurated on 30 September 2022 by Prime Minister Modi.[30] The Blue and Red Lines were opened to the public on 2 October 2022 and 6 October 2022 respectively.[31] The construction cost of Phase 1 was ₹12,900 crore (US$1.3 billion).[30] Kankaria East station was opened on 5 March 2024.[32] Thaltej Gam station and the adjoining 1.4 km (0.870 mi) section of the Blue Line leading to Thaltej station were opened on 8 December 2024.[33]

Phase 2

The Government of Gujarat approved Phase 2 in October 2017 and revised it in October 2018. In February 2019, the Union cabinet approved a cost of ₹5,384.17 crore (US$560 million) for Phase 2. Corridor 1 (Yellow Line) from Motera in Ahmedabad to Mahatma Mandir in Gandhinagar (23.838 km (14.812 mi)) with a branching Corridor 2 (Violet Line) from Gujarat National Law University (GNLU) linking Pandit Deendayal Energy University (PDEU) and GIFT City (5.416 km (3.365 mi)) was finalised. Phase 2 included a 28.26 km (17.560 mi) long elevated corridor with 22 stations.[34][35][24]

The tendering for Phase 2 began in January 2020. On 18 January 2021, the foundation stone of Phase 2 was laid by Prime Minister Modi.[36]

In February 2023, Titagarh Rail Systems won a contract worth ₹350 crore (US$36 million) for providing rolling stock for Phase 2.[37][38]

The trial run of Phase 2 started in February 2024 between GNLU and Dholakuva Circle stations.[39][40] The Yellow Line connecting Sector-1 station of Gandhinagar with the Red Line and the branch Violet Line along with eight stations were inaugurated on 16 September 2024 by Prime Minister Modi.[41][42] Seven new stations on the Yellow Line were opened to the public on 27 April 2025.[43] Juna Koba and Koba Gaam stations on the Yellow Line were opened on 28 September 2025.[44] The final 5.36-kilometre corridor of the Yellow Line, from Sachivalaya (Secretariat) to Mahatma Mandir, was inaugurated on 11 January 2026 by Prime Minister Modi.[45]

Under Phase 2A,[46] GMRC planned to link the metro system to Sardar Vallabhbhai Patel International Airport in Ahmedabad at a cost of ₹1,800 crore (US$190 million).[46][47][48] The Union Cabinet approved the plan in June 2026. The estimated cost of Phase 2A was ₹2,169.04 crore (US$230 million).[49] The 6.032 km (3.748 mi) Airport Line corridor will branches off from Yellow Line with Koteshwar Road station as an interchange. The corridor will be elevated from Koteshwar Road to the Taj Hotel Circle, and from there to the airport it will be underground. It will have 5 metro stations including an underground station at the airport. The approved stations are Ashram Road, Koteshwar Prachin Mandir, Sabarmati River, Sardar Nagar and Airport.[50][51][52][49]

In April 2026, under Phase 2B, the GMRC invited the bids for extension of the Violet Line from GIFT City to Shahpur Circle with a 3.33 km elevated corridor and 3 stations, at a cost of ₹290.33 crore (US$30 million).[53][46] The approved stations are GIFT City House, Gujarat Biotechnology University and Shahpur.[54]

Phase 3

Hyundai rotem rolling stock of Ahmedabad metro

Under Phase 3A,[55] the Blue Line will be extended from Thaltej Gam to Godhavi with two distinct elevated corridors totalling 10.8 km (6.7 mi) with nine stations: a 3.313 km Thaltej Gam to Canal Road Metro Station corridor with three elevated stations, and a 7.505 km Canal Road Metro Station to Godhavi Metro-cum-Rapid Rail Transit System hybrid corridor with six stations.[56] This extension will connect to upcoming SWASA (South West Ahmedabad Sports Arena) and further to Sanand.[57][58]

Proposed expansions

The GMRC also submitted a proposal to the Ministry of Housing and Urban Affairs to extend the Violet Line to construct a 6 to 10 km (3.7 to 6.2 mi) elevated circular loop within GIFT City. The estimated cost for the construction is ₹2,000 crore (US$210 million). The project is expected to add four to six metro stations to connect the different campuses within the city.[59][50] Another proposal includes extension of Violet Line to IIT Gandhinagar. This 7 km (4.3 mi) route will have six stations and will cost around ₹1,750 crore (US$180 million).[60]

Other proposals under study include Thaltej Gam–Sanathal route, RTO–Jivraj–Narol–Naroda route, and the Paldi–Apparel Park route.[57][61]

Progress on construction of lines

More information Phase 1, No. ...
Phase 1
No. Line Name Terminals Stations Distance (km) Opening Date
1 Blue Line Thaltej Gam Thaltej 1 1.4 km 8 December 2024
Thaltej Apparel Park 11 13.26 km 30 September 2022
Apparel Park Vastral Gam 6 6.5 km 4 March 2019
2 Red Line Motera Stadium APMC 14 18.87 km 30 September 2022
32 40.03 km (24.87 mi)
Phase 2
No. Line Name Terminals Stations Distance (km) Opening Date
3 Yellow Line Mahatma Mandir Sector-1 7 7.44 km 11 January 2026
Sector-1 Motera Stadium 14 15.40 km 16 September 2024
4 Violet Line GNLU GIFT City 3 5.42 km 16 September 2024
Violet Line Extension GIFT City Shahpur Circle 3 3.33 km Approved
5 Airport Line Koteshwar Road SVPI Airport 5 6.032 km Approved
32 37.622 km (23.377 mi)
Phase 3
No. Line Name Terminals Stations Distance (km) Opening Date
1 Blue Line Extension Godhavi Canal Road 6 7.505 km planned
Canal Road Thaltej Gam 3 3.313 km planned
9 10.8 km (6.7 mi)
Close

Construction contracts

More information Sl No., Contract ...
Sl No.ContractContractor
1General ConsultancySystra-RITES-Oriental-AECOM JV
296 coaches (Rolling stock)Hyundai Rotem
3Signalling SystemNippon Signal Co. Ltd, Japan
4Apparel Park DepotURC Construction
5Gyaspur DepotGannon Dunkerly - PSPO JV
6Vastral Gam - Apparel Park (Viaduct - 6 km)J Kumar Infraprojects
7Vastral Gam - Apparel Park (6 Stations)DRA Infracon - CICO JV
8East Ramp - Kalupur (Tunnels & 2 Stations - 2.45 km)Afcons Infrastructure
9Kalupur - West Ramp (Tunnels & 2 Stations - 4.38 km)Larsen & Toubro
10Thaltej Gam - West Ramp (Viaduct & 7 Stations - 8.21 km)Tata Projects - CRCC JV
11Gyspur - Shreyas (Viaduct & 4 Stations - 4.62 km)
12Shreyas - Ranip (Viaduct & 6 Stations -8.94 km)Simplex Infrastructure
13Motera - Ranip (Viaduct - 4.85 km)Ranjit Buildcon
14Motera - Ranip (5 Stations)Pratibha - Ranjit JV
15 Shreyas to Ranip

(Viaduct & 6 stations – 8.94 km)

Simplex Infrastructure
16 Kalupur to West Ramp

(Tunnels & 2 stations – 4.38 km)

Larsen & Toubro
17 Thaltej Gam to West Ramp

(Viaduct, Sabarmati Bridge & 7 stations – 8.21 km)

Tata – CCECC JV
18 Electrification Siemens India - Siemens AG, Germany
19 Automatic Fare Collection System Nippon Signal Co. Ltd, Japan
20 Telecommunication System M/s. L&T Limited
Close

Operational Network

More information Line Name, First Operational ...
Ahmedabad Metro
Line Name First Operational Last Extension Stations Length Terminal Stations Rolling Stock Track Gauge (mm) Electrification End to end travel time Ref
Blue Line 4 March 2019 8 December 2024 18 20.30 km (12.61 mi) Thaltej Gam Vastral Gam Hyundai Rotem Standard Gauge (1,435 mm) 750V DC Third Rail 45 min[62] [63]
Red Line 30 September 2022 30 September 2022 14 16.64 km (10.34 mi) Motera Stadium APMC 67 min[62] [63]
Yellow Line 16 September 2024 11 January 2026 21 23.84 km (14.81 mi) Mahatma Mandir Motera Stadium [63]
Violet Line 16 September 2024 16 September 2024 3 4.54 km (2.82 mi) GIFT City GNLU [63]
Total 49 67.87 km (42.17 mi)
Close


Operations

Doordarshan Kendra metro station

The metro started commercial operations in March 2019. Over 7.1 lakh people had travelled by metro till June 2022 but the monthly ridership had never exceeded 38,137 which is the highest ridership registered in March 2019 due to short length of the opened corridor then. The most riders were identified as those taking joyrides.[28]

Following opening of the Phase-1 in September 2022, the ridership increased significantly. In FY 2025-26 (April 2025 to March 2026) more than 5,10,29,000 people travelled via metro with average daily ridership of 1,53,871 in January 2026.[64]

More information Year, Ridership ...
Yearly ridership[28]
Year Ridership
March 2019
38,137
2019–20
284,934
2020–21
46,570
2021–22
241,694
October 2022–23
734,363
2023–24
29,346,000
2024–25
40,068,000
2025–26
51,029,000
Close

Controversy

Ahmedabad Metro Red Line Interior

Near Thaltej Gam on western side, 300-odd shop owners opposed the land acquisition while the officials said that there is need of huge land for depot and parking for the project.[65] The land acquisition is also opposed by the residents and shop owners of Jivraj Park in Vejalpur area. They had filed a case in Gujarat High Court.[66][67] They settled the case in September 2017.[68] Former IAS officer and executive chairman of project Sanjay Gupta and seven of his subordinate officers were accused while two of them were arrested in May 2015 for alleged committed fraud of ₹113 crore (US$12 million) in procurement and use of ground filling materials for the project in 2012. Another case regarding procurement of 603 tons of TMT steel worth ₹2.62 crore (US$270,000) which was never delivered is also being investigated.[69][70][71][72]

The Comptroller and Auditor General has pointed out wasteful expenditure of ₹373.62 crore (US$39 million) on earlier unapproved corridors.[73]