Blue Line (Ahmedabad Metro)

Rail line in Ahmedabad From Wikipedia, the free encyclopedia

The Blue Line of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 18 metro stations, starting from Vastral Gam and ending at Thaltej Gam, with a total distance of 21.23 km (13.19 mi), with most of the it being elevated.

StatusOperational
LocaleAhmedabad
Termini
Stations18
Quick facts Overview, Status ...
Blue Line
Overview
StatusOperational
LocaleAhmedabad
Termini
Stations18
Service
TypeRapid Transit
SystemAhmedabad Metro
OperatorGujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened4 March 2019; 7 years ago (4 March 2019)
Last extension2024
Technical
Line length21.23 km (13.19 mi)[1]
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

Thaltej Gam
Thaltej
Doordarshan Kendra
Gurukul Road
Gujarat University Ahmedabad Bus Rapid Transit System
Commerce Six Road
SP Stadium
Old High Court Subway interchange Red Line
Shahpur
Gheekanta
Kalupur Railway Station Ahmedabad Bus Rapid Transit System Ahmedabad Junction railway station
Kankaria East Ahmedabad Bus Rapid Transit System
Apparel Park Depot
Apparel Park
Amraiwadi
Rabari Colony Ahmedabad Bus Rapid Transit System
Vastral
Nirant Cross Road
Vastral Gam
Close

History

The ground breaking ceremony was held on 14 March 2015 for the construction of 6.5 km (4.0 mi) long Vastral – Apparel Park stretch of Blue Line of the Phase-1 in presence of then Gujarat Chief Minister, Anandiben Patel. The work started in March 2016.[2][3][4][5] The trial runs were carried out on the section in February 2019.[6][7] The section was inaugurated on 4 March 2019 by Indian Prime Minister Narendra Modi along with Chief Minister of Gujarat Vijay Rupani and Deputy Chief Minister Nitinbhai Patel.[8][9] It opened to the public on 6 March 2019.[10] Except 1.4 km (0.87 mi)-long Thaltej-Thaltej Gam section and two metro stations, Thaltej Gam and Kankaria East,[11][12][13] the Phase-1 was inaugurated on 30 September 2022 by Prime Minister Modi.[14] The Blue Line was opened to public on 2 October 2022.[15][16] On opening day, total 41,700 tickets were sold, generating revenue of 6 lakh (US$6,200), and total 72 trips were made.[17] On next day, 17,000 people travelled on 44 trips.[15] The Kankaria East station was opened on 5 March 2024.[18] Thaltej Gam station and adjoining 1.4 km (0.870 mi)-long section leading to Thaltej station were opened on 8 December 2024.[19]

Under Phase 3A,[20] the Blue Line will be extended from Thaltej Gam to Godhavi with two distinct elevated corridors with total 10.8 km (6.7 mi) long corridor with nine stations: 3.313 km long Thaltej Gam to Canal Road Metro Station corridor with three elevated stations and 7.505 km long Canal Road Metro Station to Godhavi Metro-cum-Rapid Rail Transit System hybrid corridor with six stations.[21] This extension will connect to upcoming SWASA (South West Ahmedabad Sports Arena) and further to Sanand.[22]

Features

While connecting Vastral Gam to Thaltej Gam, this line will be passing through Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi, Apparel Park, Kankaria East, Kalupur Railway Station, Ghee Kanta, Shahpur, Old High Court, Stadium, Commerce Six Road, Gujarat University, Gurukul Road, Doordarshan Kendra, Thaltej and Thaltej Gam stations.

The total distance of the corridor is 21.23 km (13.19 mi) with most of the it being elevated. The underground section is approximately 6.5 km (4.0 mi) in length with 4 underground stations, while the elevated section has 14 elevated stations. Old High Court station serves as an interchange station for the Blue Line and Red Line.

The underground section is constructed about 22 metre deep at the lowest level near Gheekanta station. The other three underground stations are about 12-14 metres deep.[23]

List of stations

Following is a list of stations on this route:[23]

More information #, Station Name ...
Blue Line
# Station Name Opening Connections Layout
EnglishGujarati
1Thaltej Gamથલતેજ ગામ8 December 2024NoneElevated
2Thaltejથલતેજ30 September 2022NoneElevated
3Doordarshan Kendraદૂરદર્શન કેન્દ્ર30 September 2022NoneElevated
4Gurukul Roadગુરુકુલ રોડ30 September 2022 Ahmedabad BRTSElevated
5Gujarat Universityગુજરાત યુનિવર્સિટી30 September 2022NoneElevated
6Commerce Six Roadકોમર્સ છ રસ્તા30 September 2022NoneElevated
7SP Stadiumએસ પી સ્ટેડિયમ30 September 2022NoneElevated
8Old High Courtજૂની હાઇ કોર્ટ30 September 2022Red LineElevated
9Shahpurશાહપુર30 September 2022NoneUnderground
10Gheekantaઘીકાંટા30 September 2022NoneUnderground
11Kalupurકાલુપુર30 September 2022 Ahmedabad Junction

Ahmedabad HSR (under-construction)

Underground
12Kankaria Eastકાંકરિયા પૂર્વ5 March 2024 NoneUnderground
13Apparel Parkએપેરલ પાર્ક4 March 2019NoneElevated
14Amraiwadiઅમરાઈવાડી18 May 2019NoneElevated
15Rabari Colonyરબારી કોલોની4 March 2019 Ahmedabad BRTSElevated
16Vastralવસ્ત્રાલ4 March 2019NoneElevated
17Nirant Cross Roadનિરાંત ક્રોસ રોડ4 March 2019NoneElevated
18Vastral Gamવસ્ત્રાલ ગામ4 March 2019NoneElevated
Close

Construction

The Gujarat Metro Rail Corporation (GMRC) Limited has divided the construction work of the 20.73 km long Blue Line of Ahmedabad Metro into multiple construction packages.

The list of contractors is as follows:

More information Sr. No, Package ...
Sr. No Package No. of Stations Contractor
1. Vastral GamApparel Park Viaduct only J. Kumar Infraprojects
2. Vastral GamApparel Park 6 DRA Infracon-CICO JV
3. Apparel Park Depot Depot only URC Construction
4. Kalupur – West Ramp 2 Larsen and Toubro
5. ThaltejThaltej Gam 2 DRA Infracon
6. East Ramp – Kalupur 2 Afcons Infrastructure
Close

Map

Click on icons for more details