Aki Tunnel

From Wikipedia, the free encyclopedia

Coordinates34°20′35.3004″N 132°39′25.0488″E / 34.343139000°N 132.656958000°E / 34.343139000; 132.656958000
Statusactive
Aki Tunnel
Aki tunnel on Sanyō Shinkansen line
Overview
LineSanyō Shinkansen
Locationbetween Higashi-Hiroshima Station, Kurose, Hiroshima and Kaita, Hiroshima
Coordinates34°20′35.3004″N 132°39′25.0488″E / 34.343139000°N 132.656958000°E / 34.343139000; 132.656958000
Statusactive
Operation
Opened1975
OperatorWest Japan Railway Company
TrafficRailway
CharacterPassenger and Freight
Technical
Line length13.030 km (8.096 mi)
No. of tracks2

Aki Tunnel (安芸トンネル) is a tunnel on the West-JR's Sanyō Shinkansen line [1] in Japan that runs from Nomio, Kurose town to Kaita town, Aki district, Hiroshima city in Hiroshima prefecture with approximate length of 13.030 km. It was completed and opened in 1975. [2] [3][4]

References

Related Articles

Wikiwand AI