Allston Street station

Light rail station in Boston, Massachusetts, US From Wikipedia, the free encyclopedia

Allston Street station is a light rail station on the MBTA Green Line B branch, located between the westbound travel lanes and frontage road of Commonwealth Avenue at Allston Street in Allston, Boston, Massachusetts. The station is not accessible. It has two side platforms, located on the near sides of the Allston Street grade crossing, to serve the line's two tracks.

LocationCommonwealth Avenue at Allston Street
Boston, Massachusetts
Coordinates42°20′55″N 71°08′17″W
Platforms2 side platforms
Tracks2
Quick facts General information, Location ...
Allston Street
An inbound train at Allston Street station in 2018
General information
LocationCommonwealth Avenue at Allston Street
Boston, Massachusetts
Coordinates42°20′55″N 71°08′17″W
Platforms2 side platforms
Tracks2
History
OpenedMay 26, 1900 (1900-05-26)[1][2]
Rebuilt1983
Passengers
20111,437 (weekday average boardings)[3]
Services
Preceding station MBTA Following station
Warren Street Green Line Griggs Street
Location
Close

History

Streetcar service began when the section from Packards Corner to Chestnut Hill Avenue opened on May 26, 1900, connecting previously opened trackage to the east and west.[1][2] Until 1983, the station had narrow platforms; the inbound platform had only a curb to separate passengers from the southbound travel lanes.[4] While the line was shut down for track replacement from July 30 to September 10, 1983, the station was rebuilt with low walls to separate passengers from traffic.[5]

Track work in 2018–19, which included replacement of platform edges at several stops (not including Allston Street), triggered requirements for accessibility modifications at those stops. Planning for modifications to five B Branch stops began in 2021.[6] In 2024, Allston Street and the other remaining non-accessible B Branch stops were added to the project. The stops at Allston Street and nearby Warren Street are to be consolidated into a single station due to their proximity and a steep grade south of Warren Street.[7][8][9] As of December 2025, the MBTA expects to issue the $74 million design-build contract in early 2026, with construction lasting from spring 2026 to late 2027.[10][11]

References

Related Articles

Wikiwand AI