Atlassian Central
Skyscraper under construction in Sydney, Australia
From Wikipedia, the free encyclopedia
Atlassian Central is a skyscraper in Sydney, Australia, currently under construction and located next to Sydney's main transport hub, Central railway station. Designed by SHoP Architects and BVN Architecture,[1] the building will rise 39 stories to a height of 183 meters.[2][3][4][5] Once completed, it will be the tallest hybrid timber structure in the world, built using a combination of mass timber, concrete, and steel.[6] The design features a glass and steel exoskeleton, planted terraces, and an innovative natural ventilation system.[7]
| Atlassian Central | |
|---|---|
Atlassian Central under construction in September 2025 | |
![]() Interactive map of the Atlassian Central area | |
| General information | |
| Type | Commercial |
| Location | Haymarket, New South Wales, 8-10 Lee Street, Sydney, Australia |
| Coordinates | 33.8838°S 151.2047°E |
| Current tenants | Atlassian |
| Construction started | 2022 |
| Estimated completion | 2026 |
| Cost | A$$1.4 billion |
| Owner | |
| Height | |
| Height | 183 metres (600 ft) |
| Technical details | |
| Material | Hybrid-timber |
| Size | 112,400 square metres (1,210,000 sq ft) |
| Floor count | 41 |
| Floor area | 75,658 square metres (814,380 sq ft) |
| Grounds | 3,764 square metres (40,520 sq ft) |
| Design and construction | |
| Architecture firm | |
| Developer | Dexus |
| Structural engineer | Eckersley O’Callaghan |
| Main contractor |
|
| Other information | |
| Number of rooms | 500 |
| Website | |
| www | |
The building will house Atlassian's headquarters and also include spaces dedicated to YHA Australia, which will occupy the lower five floors with its 500-bed “co-living” accommodation.[8]
History
Initial design of the building began in 2019 and was completed two and a half years later in August 2022, after 160 different cost plans, 55 embodied-carbon assessments, and 50 different design submissions.[8] Atlassian engaged KPMG for their Direct Negotiation Proposal to the Government of New South Wales to procure the site.[9]
Construction of the building by a joint venture between Built Pty Ltd and Obayashi Corporation[10] began in August 2022[11] and is expected to be completed by 2026 at an estimated cost of approximately $1.4 billion Australian dollars.[5][12][8] Its development is part of the Government of New South Wales's plan to create a technology district in the area adjacent to Central railway station.[7]