Baguashan Tunnel (THSR)
From Wikipedia, the free encyclopedia
LineTHSR
Statuscomplete
| Baguashan Tunnel 八卦山隧道 | |
|---|---|
![]() Interactive map of Baguashan Tunnel 八卦山隧道 | |
| Overview | |
| Line | THSR |
| Location | Bagua Plateau(Changhua CountyChanghua、Fenyuan、Dacun、Yuanlin) |
| Coordinates | 24°03′53.32″N 120°36′30.11″E / 24.0648111°N 120.6083639°E |
| Status | complete |
| System | THSR |
| Start | 石牌里, Changhua, Changhua County |
| End | 東北里, Yuanlin, Changhua County |
| Operation | |
| Work begun | Apr 9, 2001 |
| Constructed | 507 days |
| Opened | Jan 5,2007 |
| Owner | Taiwan High Speed Rail Corporation |
| Operator | Taiwan High Speed Rail |
| Traffic | High-speed rail |
| Technical | |
| Length | 7,357 metres (24,137 ft) |
| Line length | 7,357 metres (24,137 ft) |
| Track length | 7,357 metres (24,137 ft) |
| No. of tracks | Double |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrified | AC 25KV |
| Operating speed | 315 kilometres per hour (196 mph) |
| Highest elevation | 200 metres (660 ft) |
| Lowest elevation | 26 metres (85 ft) |
| Tunnel clearance | 11.76 metres (38.6 ft) |
Baguashan Tunnel (Chinese: 八卦山隧道) is a railway tunnel through Baguashan in Taiwan, located between Taichung HSR station and Changhua HSR station. With a route length of 7,357 meters, it is the longest tunnel on Taiwan High Speed Rail. Mileage of Baguashan Tunnel is TK173+021to TK180+378.[1][2]
