Baiziwan station
Beijing Subway station
From Wikipedia, the free encyclopedia
Baiziwan Station (simplified Chinese: 百子湾站; traditional Chinese: 百子灣站; pinyin: Bǎizǐwān Zhàn) is a station on Line 7 of the Beijing Subway towards the southern part of the city. It was opened on December 28, 2014 as a part of the stretch between Beijing West railway station and Jiaohuachang and is located between Dajiaoting and Huagong.[1]
Line Line 7
Platforms2 (1 island platform)
Platform | |||||||||||
| General information | |||||||||||
| Location | Guangqu Road Nanmofang, Chaoyang District, Beijing China | ||||||||||
| Operator | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line | Line 7 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | December 28, 2014 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
It is located in Chaoyang District along Guangqu Road east of the East 4th Ring Road Middle on the north side of the former Beijing Chemical Engineering 2nd Plant (北京化工二厂).[2]
Station layout
The station has an underground island platform.
Exits
There are 4 exits, lettered A1, A2, A3, and B. Exit A1 is accessible.