Baku Convention Center is a multifunction complex located close to the city center of Baku.

StatusCompleted
LocationBaku, Azerbaijan, Tabriz street 130
Coordinates40°23′43″N 49°52′01″E
Construction started
2013
Quick facts Baku Convention Center Bakı Konqres Mərkəzi, General information ...
Baku Convention Center
Bakı Konqres Mərkəzi
Bakı Konqres Mərkəzi
Baku Convention Center (April 2015)
Interactive map of the Baku Convention Center
Bakı Konqres Mərkəzi area
General information
StatusCompleted
LocationBaku, Azerbaijan, Tabriz street 130
Coordinates40°23′43″N 49°52′01″E
Construction started
2013
Completed
29 August 2015
Design and construction
ArchitectsCOOP HIMMELB(L)AU Wolf D. Prix & Partner ZT GmbH
Main contractorILK Construction
Other information
Seating capacity6,000
Website
www.bakuconventioncenter.com
Close

The congress center has 17 conference halls with a total capacity of up to 2,500 people.

Construction

The rear Center lobby (April 2015)

Construction of the Baku Convention Center began in February, 2014 and was completed in 2015. The center covers a total area of 6.2 hectares (15.3 acres). The area of 46,600 square metres (502,000 sq ft) of the Center is[when?] under construction.[cleanup needed]

The Center building includes 17 conference halls with a total capacity of 2,500 people and a restaurant that can serve 1,500 guests.[1]

History

The opening ceremony of the Baku Convention Center was held on 29 April 2015 with the participation of President Ilham Aliyev, his wife Mehriban Aliyeva and daughter Arzu Aliyeva. Finance Minister Samir Sharifov gave information about the building.

The first international event that Baku Convention Center hosted on May 2-5 was the 48th annual meeting of the Board of Directors of the Asian Development Bank.

It hosted the 41st World Scout Conference on August 15, 2017. It hosted the 18th Mid-Term Ministerial Conference of the Non-Aligned Movement (NAM).

18th Mid-Term Ministerial Conference of the Non-Aligned Movement

Project team

The project was designed by Coop Himmelb(l)au Wolf D. Prix & Partner ZT GmbH. Project leader is Christian Labud, Günther Weber, architect is Martin Jelinek, design architect is Alexander Ott, coordinators are Maria Nardelli Donna Riedel.