Pink Line (Pune Metro)

Metro line in Pune, India From Wikipedia, the free encyclopedia

Pune Metro Pink Line of the Pune Metro is the third line of the city of Pune's under-construction mass transit network. It will run from District Court, Pune to Megapolis Pune in Hinjawadi. The 23.3 km (14.5 mi) line will be completely elevated and will have 23 stations and will align with the Maharashtra Metro Rail Corporation Limited (Maha Metro) lines at the District Court interchange station.[4][5] The construction will be taken up in two phases, the section between Hinjawadi and Balewadi is expected to be taken up first, followed by the section between Balewadi and District Court, Shivajinagar. A metro car shed will be built in Hinjawadi. The MIDC will provide 55 acres of land in Hinjawadi for setting up a Metro rail depot.[6][7][8] On 3 August 2018, Pune Metropolitan Region Development Authority (PMRDA) announced the final bidder for the project — the joint venture Tata Realty-Siemens.[9] Pune IT City Metro Rail Limited On 3 October 2018, Tata Realty-Siemens were awarded the contract to execute the project on a design, build, finance, operate and transfer model.[10][11][12] The formal concession agreement was signed in September 2019 [13] with the construction expected to begin in March 2020.[14]

StatusUnder Construction
Line number3
Quick facts Pune Metro Line 3, Overview ...
Pune Metro Line 3
A Pink Line driverless Alstom Metropolis rake at Hinjawadi Phase-I, captured during testing.
Overview
StatusUnder Construction
OwnerPune Metropolitan Region Development Authority (PMRDA)
Line number3
LocalePune Metropolitan Region
Termini
Stations23
Website
Service
TypeRapid Transit
SystemPune Metro
OperatorKeolis[1]
Depot(s)Maan, Hinjawadi
Rolling stockAlstom Metropolis[2]
History
Planned openingMaan–R K Laxman Museum Balewadi: December 2026; 4 months' time (2026-12)
Balewadi High Street–District Court Pune: March 2027; 7 months' time (2027-03)[3]
Technical
Line length23.3 km (14.5 mi)
Number of tracks2
CharacterGrade separated, Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750V DC Third rail
Operating speed34 km/h (21 mph)
SignallingCBTC
Route map

Hinjawadi Depot
Megapolis Circle
Quadron
Infosys Phase II
Dohler
Wipro Technologies
Pall India
Shivaji Chowk
Hinjawadi
Wakad Chowk
Balewadi Stadium
NICMAR
Ramnagar (Pune)
Laxmi Nagar (Pune)
Balewadi Phata
Baner Gaon
Baner
Indian Agricultural Research Institute
Sakal Nagar
Savitribai Phule Pune University
Reserve Bank of India
Agriculture College
Shivaji Nagar Bus interchangeMainline rail interchange
District Court Pune
Close

Route

Pink Line will run from District Court, Pune to Megapolis Pune in Hinjawadi. The 23.3 km (14.5 mi) line will be completely elevated and will have 23 stations and will align with the Maharashtra Metro Rail Corporation Limited (Maha Metro) lines at the District Court interchange station. Depot will be located at Maan village. It will be spread across 20 hectares (49 acres).[15]

List of stations

Following is a list of stations on this route: [16]

More information #, Station Name ...
Pink Line
# Station Name Expected Opening Connections Station Layout
English Marathi
1 Maan माण September 2026 Elevated
2 Maan - MIDC Circle Phase-II माण - एमआयडीसी सर्कल फेज-II Elevated
3 Maan Bus Depot माण बस डेपो Elevated
4 Hinjawadi Phase-II Circle-II हिंजवडी फेज-II सर्कल-II Elevated
5 Hinjawadi Phase-II Circle-I हिंजवडी फेज-II सर्कल-I Elevated
6 Padmabhushan Chowk पद्मभूषण चौक Elevated
7 Shree Shiv Chhatrapati Shivaji Maharaj Chowk Hinjawadi श्री शिव छत्रपती शिवाजी महाराज चौक हिंजवडी Elevated
8 Hinjawadi Phase-I हिंजवडी फेज-I Elevated
9 Wakad Chowk वाकड चौक Elevated
10 Shree Shiv Chhatrapati Sports Complex Mahalunge श्री शिवछत्रपती क्रीडा संकुल महाळुंगे Elevated
11 Mitcon Balewadi मिटकॉन बालेवाडी Elevated
12 R K Laxman Museum Balewadi आर. के. लक्ष्मण संग्रहालय बालेवाडी Elevated
13 Balewadi High Street बालेवाडी हाय स्ट्रीट March 2027 Elevated
14 Balewadi Phata बालेवाडी फाटा Elevated
15 Baner Gaon बाणेर गाव Elevated
16 Baner Pashan Link Road बाणेर पाषाण लिंक रोड Elevated
17 Aundh औंध Elevated
18 Sakal Nagar सकाळ नगर Elevated
19 Savitribai Phule Pune University सावित्रीबाई फुले पुणे विद्यापीठ Elevated
20 Bhosalenagar - RBI भोसलेनगर - आरबीआय Elevated
21 Agriculture College कृषी महाविद्यालय Elevated
22 Shivaji Nagar शिवाजीनगर Purple Line Elevated
23 District Court Pune जिल्हा न्यायालय पुणे Purple Line
Aqua Line
Elevated
Close

Construction

Contract for conducting geotechnical investigation was awarded to Soiltech India Private Limited.[17] Geotechnical investigation commenced on 19 June 2019.[18] However, due to COVID-19 pandemic and subsequent nationwide lockdown, work on several projects had been delayed, including Pink Line. Following a gap of nearly 11 months, piling works resumed at multiple locations near Hinjawadi in May 2020.[18]

Pune Metro Line 3 has achieved a significant milestone with the Commissioner of Metro Rail Safety (CMRS) for the commencement of passenger operations on the first phase of the project, covering the 12-station section between Maan Metro Station and R.K. Laxman Museum (Balewadi) Metro Station. The approval follows the successful completion of all statutory inspections, safety validations, confirmatory trial runs and mandatory compliance requirements, paving the way for the commencement of commercial passenger services on the first stretch of the corridor. The 23.3-kilometre metro line connecting Hinjawadi IT Park with Shivajinagar will be operationalised in two phases, with the Maan–R.K. Laxman Museum section opening first, followed by the remaining stretch up to Shivajinagar.

Pune Metro Line 3 receives CMRS approval for Phase 1 operations of the 23km stretch [19]

Extension

PMRDA proposed an extension of Pink Line from District Court station towards Hadapsar.[20] In-principle approval for DPR was given by the then CM and PMRDA head Devendra Fadnavis in December 2018. DPR for extension is being prepared by Delhi Metro Rail Corporation under supervision of PMRDA.[21] As per draft DPR submitted by PMRDA, proposed stations for extension will be Railway Colony, Collector's Office, MG Road, Fashion Street, Mhammadevi Chowk, Race Course, Kaluba Chowk, Vaiduwadi, Hadapsar Phata, Hadapsar Gadital bus stand, Civil Aviation Ground, Phursungi IT Park and Sulabh Garden.[22]

In December 2020, DMRC announced bid to conduct geotechnical investigation works for DPR preparation for Hadapsar-Loni Kalbhor extension.[23] The second extension is expected to increase line 3's length by 8.5 km (5.3 mi) with 4-5 new stations at various locations.