Bawanur Dam

Dam in Sulaymaniyah, Iraq From Wikipedia, the free encyclopedia

The Bawanur Dam is an earth-fill dam under construction on the Sirwa River, just upstream of the town of Bawanur in Sulaymaniyah Governorate, Kurdistan Region, Iraq. The 23 m (75 ft) tall dam is designed to support a 32 MW run-of-the-river hydroelectric power station. In addition to power generation, the project aims to provide flood control and irrigation water.

LocationBawanur in Sulaymaniyah Governorate
Coordinates34°50′29.07″N 045°31′49.74″E
PurposePower, irrigation, flood control
Quick facts Country, Location ...
Bawanur Dam
Bawanur Dam is located in Iraq
Bawanur Dam
Bawanur Dam
Location of the Bawanur Dam
Bawanur Dam is located in Iraqi Kurdistan
Bawanur Dam
Bawanur Dam
Bawanur Dam (Iraqi Kurdistan)
CountryIraq
Kurdistan Region
LocationBawanur in Sulaymaniyah Governorate
Coordinates34°50′29.07″N 045°31′49.74″E
PurposePower, irrigation, flood control
StatusUnder construction
Construction began2013
Opening date2018 est.
Construction costUS$200 million
OwnerKurdistan Regional Government
Dam and spillways
Type of damEmbankment, earth-fill
ImpoundsDiyala River
Height23 m (75 ft)
Length1,190 m (3,900 ft)
Elevation at crest300 m (980 ft)
Width (crest)9 m (30 ft)
Width (base)148 m (486 ft)
Dam volume1,108,000 m3 (1,449,000 cu yd)
Reservoir
Total capacity31,000,000 m3 (25,000 acre⋅ft)
Catchment area20,142 km2 (7,777 mi2)
Surface area4.15 km2 (1.60 mi2)
Power Station
Commission date2018 est.
TypeRun-of-the-river
Hydraulic head16 m (52 ft) (net)
Turbines4 x 8 MW Kaplan-type
Installed capacity32 MW
Close

Construction works initially began in August 2013 after the Kurdistan Regional Government signed a US$200 million contract with the Romanian firm Hidroconstrucția for the construction of the dam and power station. However, work was later suspended due to the financial crisis in the Kurdistan Region.

Construction activities resumed in February 2025. Following the 2021 earthquake in Iran, whose seismic effects were felt at Darbandikhan Dam and in the Bawanur Dam project area, the dam is currently undergoing redesign studies. The redesign process is being carried out by a consortium of Turkish companies to reassess structural safety and seismic considerations.

See also